Add to Favorites | Set as Home Page | Member Center | I want to contribute | RSS
Rolling news: ASEM - One stop low input self contribution promotion platform opened (pictures and texts)                The first EPC offshore wind power project in China has fully entered the construction of offshore main works                The world's first driverless straddle carrier was officially launched in China Communications Construction Zhenhua Heavy Industry Co., Ltd                The python all terrain vehicle of Harbin First Machinery Group received 80 million orders                On site search:
Your current location: home page  >  focus

Closure of main bridge steel box girder of Jinan Daxihuan Yellow River Bridge Project

Time: 2022-11-23 09:29:02 Source: Author:

Recently, the closure of the main bridge steel box girder of the Jinan Great West Ring Yellow River Bridge Project, which was built with the participation of China Railway Fourth Engineering Group, a subsidiary of China Railway, marked the completion of the main works of the bridge and laid a solid foundation for the completion and opening of some sections of the Jinan Great West Ring Project in advance by the end of the year.

 Main Bridge Closure.jpg

Closure of Main Bridge of Jinan Daxihuan Yellow River Bridge Project

The Yellow River Bridge is one of the important control projects of the Jinan West Ring Project. It is a partial cable-stayed bridge with four tower steel-concrete composite beams with the largest span and scale in China. It is also the first partial cable-stayed bridge in China to adopt the core box+super cantilever structure. The bridge span is (140+3 × 240+140) meters, the bridge deck is 36 meters wide, and the steel structure consumption is about 19000 tons. The box section is 15m long, the cantilever arms on both sides are 10.5m long, and the standard spacing of cantilever arms is 3.0m.

 Project site steel member assembly field.jpg

Project site steel member assembly yard

The main bridge of this closure adopts the structure of single box three chamber large cantilever variable cross-section steel-concrete composite beam. The beam at the fulcrum is 8.5 meters high, and the beam at the midspan is 4.5 meters high. The beam height changes according to the secondary parabola. The top surface of the steel box girder is set with a 2% cross slope, and the upper part is paved with reinforced concrete pavement. The construction team of China Railway Fourth Engineering Group Co., Ltd. for the first time adopted the manufacturing and assembly technology of ultra-high variable cross-section core box+super large cantilever steel beam, continuously optimized the construction process, completed the construction task of steel box beam in advance, and provided a strong guarantee for the completion node open to traffic at the end of the year.

 Main Bridge Closure.jpg

Closure of main bridge

Jinan Daxihuan project is an important part of the "nine vertical, five horizontal, one ring, seven radiating and multi connected" expressway network in Shandong Province. After the completion of the project, it will further improve the layout of the expressway network in Shandong Province, strengthen the radiation and driving role of Jinan as the core city of the provincial capital city agglomeration economic circle and the new old kinetic energy conversion comprehensive pilot area, and drive the rapid economic and social development of the regions along the line.

The opinion of this article only represents the author himself. If the source of the article is a network reprint, this website is an information publishing platform. If there is infringement, please contact this website to delete it in time.

Come on
 Back to Home
Back to Home
Comment share Comments
user name: password:
Verification Code: Anonymous publishing
Recommended information
 The "new infrastructure construction facilities" of Southern Power Grid continued to upgrade the service information of electric vehicles in five provinces and regions of Southern Power Grid
"New infrastructure construction" of Southern Power Grid
 China Huadian focuses on the three major battles and steadily makes good news
China Huadian focuses on three major challenges
 Peony industry chain leader Muxian takes the lead in extending to the industry and continues to lead the new direction of industry development
Peony industry chain leader Mu Xian
 "Guard the blue sky", the 40 thousand replacement gift of Onsino pure electric
"Guard the Blue Sky", Onsino
Related articles
    No relevant information
Column update
Popular columns
Successful cases | Member Services | Invite to join | Advertising services | Talent recruitment | Copyright Notice | contact us | About us |

Advertising hotline of ASEM: 010-61224401 Fax: 010 - 61224401 Customer service QQ: 924467170 Email: mxzh2008@163.com     Copyright 2005-2018 aeenets.com
All Rights Reserved. Copyright of Asia Europe Network Filing No.: Beijing ICP Preparation 12037512

Jinggong Network Anbei No. 11011502004107

Real name of the website: Asia Europe Network