National Engineering Research Center

National scientific and technological innovation base for technological innovation and achievement transformation
Collection
zero Useful+1
zero
National Engineering Research Center National scientific and technological innovation base for technological innovation and achievement transformation , oriented to national importance Strategic tasks And key project construction needs key technology Key problem tackling and experimental research, major Equipment development , Major Scientific and technological achievements And break through the constraints of key technologies and core equipment [2]
By the end of 2022, 191 national engineering research centers under new sequence management [4-5]
Chinese name
National Engineering Research Center
Nature
research center
Properties
engineering
Category
National affairs

Functional positioning

Announce
edit
National Engineering Research Center National scientific and technological innovation base for technological innovation and achievement transformation , oriented to national importance Strategic tasks And key project construction needs key technology Key problem tackling and experimental research, major Equipment development Engineering experiment verification of major scientific and technological achievements, breaking through the constraints of key technologies and core equipment [2]

Background

Announce
edit
The National Engineering Research Center is National science and technology innovation system Important components of [1] Means that the National Development and Reform Commission Optimization and upgrading of industrial structure With the goal of improving independent innovation capability, enhancing industrial core competitiveness and development potential, and organizing research and development entities with strong research and development and comprehensive strength, such as universities, research institutions and enterprises.

Naming rules

Announce
edit
Chinese name : "×× National Engineering Research Center"
English name :“National Engineering Research Center of ××”。

Related differences

Announce
edit
"National Engineering Research Center" and“ National Engineering Technology Research Center ”National Engineering Research Center( National Development and Reform Commission The National Development and Reform Commission organizes universities with strong research and development and comprehensive strength scientific research institution And enterprises National innovation system An important part of. National Engineering Technology Research Center( Ministry of Science and Technology The Ministry of Science and Technology of the People's Republic of China, according to the needs of national conditions, makes overall planning and unified arrangements as an important part of national research and development conditions and capacity building.

Purpose of the Center

Announce
edit
The purpose of the National Engineering Research Center is to take the interests of the country and the industry as the starting point, cultivate and improve the ability of independent innovation, and build a "bridge" between industry and scientific research by establishing facilities for engineering research and verification and a mechanism conducive to technological innovation and achievement transformation, Research and development industry Key common technologies , accelerate Scientific research achievements Transform to real productivity and promote industry technical progress And core competitive power Improvement.
(1) Achieve the set objectives of research and development and achievement transformation according to the national and industrial development needs and the requirements of relevant approval documents;
(2) Key commonalities of active organization and participation in the industry technological development , and provide the industry with a test and verification environment for technology development and achievement engineering;
(3) Undertake the scientific research and development and engineering research tasks assigned by the state and industry, and complete the tasks on time according to the contract;
(4) Will undertake national and industrial tasks technological achievements adopt market mechanism Transfer and spread to the industry, playing the role of bridge and link between scientific research and industry.

Central functions

Announce
edit
(1) Research and develop industrial technological progress and Structural adjustment Key common technologies urgently needed;
(2) Market oriented and technology oriented Development trend It is important to carry out market value The engineering and system integration
(3) Realize technology transfer and diffusion through market mechanism, and continuously provide mature advanced technique , process and Technical products And equipment;
(4) Through digestion and absorption of imported technology Reinnovation And development international co-operation Exchange and promote the improvement of independent innovation ability;
(5) Provide engineering technology verification and consulting services;
(6) Cultivate engineering technology research and management for the industry High level talents

Management Measures

Announce
edit
Order of the National Development and Reform Commission of the People's Republic of China
In order to implement the Decision of the Central Committee of the Communist Party of China and the State Council on Implementing the Outline of the Science and Technology Plan to Enhance the Ability of Independent Innovation, strengthen and standardize the construction and operation management of the National Engineering Research Center, and improve the ability of independent innovation《 Administrative Measures of National Engineering Research Center 》, which was discussed and adopted at the director's office meeting of the National Development and Reform Commission, is hereby promulgated and shall come into force as of April 10, 2007.
Director of the National Development and Reform Commission: Ma Kai
March 5, 2007
general provisions
Article 1 In order to implement the Decision of the Central Committee of the Communist Party of China and the State Council on Implementing the Outline of Science and Technology Planning to Enhance the Ability of Independent Innovation, strengthen and standardize the construction and operation management of the National Engineering Research Center, and improve the ability of independent innovation《 law for science and technology progress 》, Law on Promoting the Transformation of Scientific and Technological Achievements, etc laws and regulations The Measures are formulated according to the regulations.
Article 2 These Measures are applicable to the declaration, review and evaluation of the National Engineering Research Center (hereinafter referred to as the "Engineering Center").
The Engineering Center mentioned in these Measures refers to the National Development and Reform Commission (hereinafter referred to as "NDRC") Building an innovative country and Optimization and upgrading of industrial structure The major strategic needs of. The engineering center is National innovation system An important part of.
Article 3 The purpose of the Engineering Center is to take the national and industrial interests as the starting point.
Article 4 Main tasks of the Engineering Center:
(1) According to the country and Industrial development To research and develop key common technologies urgently needed for industrial technological progress and structural adjustment;
(2) Market-oriented;
(3) Realized through market mechanism Technology transfer And diffusion;
(4) By Imported technology To digest, absorb and re innovate, and carry out international cooperation and exchanges, so as to promote the improvement of independent innovation capability;
(5) Provide Engineering technology Verification and consulting services;
(6) Training project for the industry technical study And management of high-level talents.
Article 5 Responsibilities and obligations of the Engineering Center:
(1) Achieve the set objectives of research and development and achievement transformation according to the national and industrial development needs and the requirements of relevant approval documents;
(2) Actively organize and participate in the development of key common technologies in the industry, and provide the industry with a test and verification environment for technology development and achievement engineering;
(3) Undertake the scientific research and development and engineering research tasks assigned by the state and industry, and complete the tasks on time according to the contract;
(4) Transfer and spread the technological achievements formed by undertaking national and industrial tasks to the industry through the market mechanism, and play a role of bridge and link between scientific research and industry.
Chapter II Declaration and Review
Article 6 The National Development and Reform Commission is responsible for formulating and publishing the relevant documents of the Engineering Center policy document Guide and organize the audit and evaluation of the Engineering Center.
Article 7 Relevant departments of the State Council, all provinces, autonomous regions, municipalities directly under the Central Government Cities with independent planning status and Xinjiang Production and Construction Corps Development and reform departments, Single column of plan central enterprises (Group) (hereinafter referred to as the "competent department") is responsible for organizing the declaration and management of the engineering center in the region or its affiliated units, and supervising and coordinating the construction and operation of the engineering center.
Article 8 According to the national high-tech industry development and independent innovation foundation capacity building The National Development and Reform Commission timely released the guidelines for the construction field of the Engineering Center to clarify the key direction of the construction of the Engineering Center and the requirements for the application time limit.
Article 9 Units that plan to apply for the Engineering Center (hereinafter referred to as“ Applicant ”)In accordance with the requirements of the relevant documents of the National Development and Reform Commission, and in combination with its own advantages and specific conditions, the application report of the Engineering Center (see Annex I for the preparation outline) must be submitted to the relevant competent departments for review.
Article 10 The applicant shall meet the following conditions:
(1) Comply with the engineering center construction field and relevant requirements issued by the National Development and Reform Commission;
(2) Have a batch of projects to be developed and owned Independent intellectual property rights And a good market prospect, which is at the leading level in China Scientific and technological achievements , with domestic first-class research and development and Technology integration Ability and corresponding talent team;
(3) Have a market-oriented engineering research verification environment and ability to transform major scientific and technological achievements into large-scale production;
(4) Have the ability to realize technology transfer and diffusion through market mechanism, promote the industrialization of scientific and technological achievements, and form a virtuous circle Development capacity
(5) Have the ability to industrialize scientific and technological achievements economic analysis If possible engineering design , assessment and construction consultation and Service capability
(6) In principle, it is necessary to adopt the corporate form, and other effective organizational forms can also be explored;
(7) The Board of Directors (Board of Directors) of the Engineering Center shall include two independent directors (directors), who shall be appointed by relevant competent departments and generally shall be senior technical or management experts familiar with the industry of the Engineering Center;
Article 11 The State encourages advantageous scientific research institutions, universities, enterprises and social investment institutions in relevant fields to jointly apply for the construction of engineering centers. Encourage cross regional and cross industry construction forms to promote regional technological innovation and industrial development. Encourage the introduction of overseas first-class Technical talents And management talents.
Article 12 The competent department shall carefully review the application submitted by the affiliated units of the department (region), and submit the qualified application report of the Engineering Center (in quadruplicate) and relevant application documents to the National Development and Reform Commission.
Article 13 After accepting the application documents submitted by the competent department, the National Development and Reform Commission shall organize experts to review the application report of the Engineering Center in accordance with Article 10 of these Measures. The review focuses on the significance and necessity of the construction of the Engineering Center, the conditions of the applicant, and the development goals. During the review, the applicant may be required to explain relevant issues.
Article 14 The National Development and Reform Commission shall, according to the expert review opinions and when necessary, solicit the opinions of the relevant departments and local governments, conduct preliminary verification on the application report of the Engineering Center, and approve it after comprehensive study.
National Engineering Research Center
Article 15 The National Development and Reform Commission shall complete the preliminary verification of the application report of the Engineering Center within 90 working days after the deadline for application specified in the guidelines for the construction field of the Engineering Center. The time required for expert review and soliciting opinions from relevant departments and local governments shall not be counted in this period.
Article 16 After the National Development and Reform Commission approves the application report, the Engineering Center enters the preparatory period, and can temporarily carry out work in the name of "×× National Engineering Research Center (preparatory)" to implement the tasks identified in the Engineering Center's application report.
Article 17 The competent department shall, in accordance with the relevant provisions of the State, establish a corresponding management system, strengthen the supervision and management of the work related to the preparatory period of the Engineering Center, and cooperate with the relevant departments to do a good job in inspection, inspection and audit.
Article 18 The preparatory period of an engineering center shall generally not exceed three years. After reaching the pre-set development goals in the preparatory period, the applicant shall prepare Summary report (For the outline, see Annex II). After being reviewed and approved by the competent department, the competent department shall apply to the National Development and Reform Commission for formal approval.
Article 19 The competent department shall submit a report to the National Development and Reform Commission on the engineering centers that fail to reach the predetermined goals within the time limit, stating the reasons, proposed measures and Planned completion date
Article 20 The National Development and Reform Commission, together with the finance, customs, taxation and other departments, shall examine the summary report submitted by the competent department, and formally verify and award the qualified ones as "National Engineering Research Center".
Section Article 21 In accordance with the relevant regulations of the State, the Engineering Center enjoys the relevant preferential policies for the exemption of import taxes on scientific and technological development supplies.
Chapter III Evaluation
Article 22 The Engineering Center shall implement the operation evaluation system of survival of the fittest and dynamic adjustment. The National Development and Reform Commission shall evaluate the officially approved Engineering Center every two years.
Article 23 Evaluation procedures:
(I) data acquisition The Engineering Center shall report the evaluation materials to the competent department before April 15 of the year of evaluation. The evaluation materials include: the annual work report of the Engineering Center (see Annex III for the preparation outline), the data filling report of the Engineering Center (Annex IV) and its relevant annexes and Supporting materials
(2) Preliminary review of data. The competent department shall review the materials submitted by the Engineering Center, issue review opinions, and report to the National Development and Reform Commission before May 20 of the same year.
(3) Data verification and analysis. The National Development and Reform Commission entrusts relevant intermediary evaluation institutions to check the materials and relevant conditions reported by the Engineering Center evaluating indicator (Annex V).
(4) The National Development and Reform Commission reviews the evaluation results and reports.
Article 24 The evaluation results of the Engineering Center are divided into excellent, good, qualified and unqualified.
(1) The evaluation score of 85 points and above is excellent.
(2) The evaluation score between 75 (inclusive) and 85 is good.
(3) The evaluation score is between 60 (inclusive) and 75.
(4) In case of one of the following conditions, it is evaluated as unqualified:
1. The evaluation score is less than 60;
2. The score of two consecutive evaluations is between 65 and 60 (inclusive);
3. None Force majeure , do not report the evaluation materials one month overdue;
4. The content and data of the submitted materials are seriously false;
5. Tax evasion and fraud Export tax rebate And other major violations illegal activities
Article 25 The National Development and Reform Commission shall publish the evaluation results and take them as an important basis for the management of the Engineering Center.
Article 26 The Engineering Center shall regularly fill in and report the duty-free imported scientific and technological articles Statistical table (Annex VI), submitted to the provincial level before March 1 every year Financial sector The provincial financial departments shall summarize and report to the Ministry of Finance.
Chapter IV Fund Subsidies
Article 27 An engineering center entering the preparatory period may, according to the approval documents of the National Development and Reform Commission, propose innovation ability Construction Project , Application National funds subsidy.
For engineering centers that have passed the official verification for more than three years and have been evaluated as excellent or good, they can also apply for national fund subsidies for innovative capacity building projects in order to improve their sustainable innovation ability around the new development direction and goals.
Article 28 An engineering center applying for national fund subsidy must entrust an engineering consulting institution with Class A qualification (or an engineering design institution with equivalent qualification) to prepare an application report for funds for the innovative capacity building project of the engineering center (see Annex VII for the outline) and submit it to the corresponding competent department.
Article 29 After being reviewed and approved by the competent department, the innovation capacity of the Engineering Center will be built Project fund application report Submit to the National Development and Reform Commission. The National Development and Reform Commission entrusts relevant evaluation and consultation institutions to evaluate the project fund application report or organize experts to demonstrate it. When necessary, the relevant departments or local authorities can be consulted National financial funds Situation overall balance And then approve the project fund application report.
Article 30 Specific application, approval procedures and project management , press《 Interim Measures for the Administration of Investment Subsidies and Discount Interest Projects within the Central Budget 》And《 Interim Measures for the Administration of National High tech Industrial Development Projects 》Execution. For the central Budget funds take direct investment and Capital fund The innovation capacity construction project of the engineering center in the injection mode is subject to the investment projects To be managed according to relevant regulations of.
Chapter V Change and Punishment
Article 31 The Engineering Center shall strictly implement the application report approved by the National Development and Reform Commission. In case of the following two situations that need to be adjusted, it shall be reported in a timely manner: (1) The adjustment that does not affect the realization of the functions and tasks of the Engineering Center shall be reviewed by the competent department and reported to the National Development and Reform Commission for filing; (2) In case of major changes affecting the adjustment of the functions and tasks of the Engineering Center, the competent department shall propose adjustment suggestions and submit them to the National Development and Reform Commission for review.
Article 32 For engineering centers that cannot achieve the development goals in the preparatory period, the competent departments shall find out the reasons in time, clarify the relevant responsibilities, and put forward handling suggestions to the National Development and Reform Commission. The National Development and Reform Commission will give Circulate a notice of criticism Recover the national investment and turn it over to the state treasury, revoke the title of engineering center (preparatory), etc. If the circumstances are serious or the consequences are serious, the relevant responsible person shall be investigated for responsibility according to law.
Article 33 The National Development and Reform Commission will give a warning to the engineering centers whose evaluation scores are between 65 and 60 (inclusive), and the competent departments will be responsible for supervising the rectification. The National Development and Reform Commission will revoke the title of engineering center if the evaluation result is unqualified.
Chapter VI Supplementary Provisions
Article 34 The name of the Engineering Center is "×× National Engineering Research Center", and the English name is "National Engineering Research Center of ××".
Article 35 All competent departments may formulate provincial (departmental) level by reference to these Measures Engineering Research Center Management Measures
Article 36 These Measures shall come into force as of April 10, 2007. The former Administrative Measures for National Engineering Research Center (Trial) (JKJ [1992] No. 2239) and the Guiding Opinions of the National Planning Commission on the Construction of National Engineering Research Center (Planning Office High tech [2002] No. 767) shall be repealed at the same time.
Article 37 These Measures shall be interpreted by the National Development and Reform Commission.

List of centers

Announce
edit
S/N
Name of National Engineering Research Center
Supporting unit
one
CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd
two
Chongqing Ronghai Ultrasonic Medicine Co., Ltd
three
PetroChina Oil&Gas Exploration Software Company
four
five
Zhongwei Coking Technology Co., Ltd
six
seven
Sinopec Shanghai Petrochemical Research Institute
eight
Sinopec Shanghai Petrochemical Company
nine
Sinopec Beijing Yanshan Branch
ten
Sinopec Beijing Research Institute of Chemical Industry
eleven
Central South University Powder Metallurgy Co., Ltd
twelve
Zoomlion Advanced Steel Materials Technology Co., Ltd
thirteen
fourteen
Zhongke Zhengyang Information Security Technology Co., Ltd
fifteen
Shanghai Institute of Optics and Precision Machinery, Chinese Academy of Sciences
sixteen
seventeen
eighteen
Chinese Academy of Agricultural Sciences Harbin Veterinary Institute, etc
nineteen
Wood Industry Research Institute of China Academy of Forestry Sciences
twenty
twenty-one
twenty-two
twenty-three
twenty-four
Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences
twenty-five
twenty-six
twenty-seven
twenty-eight
The Seventh Research Institute of China Electronics Technology Group Corporation
twenty-nine
The 54th Research Institute of China Electronics Technology Group Corporation
thirty
The 18th Research Institute of China Electronics Technology Group Corporation
thirty-one
thirty-two
Sinosteel Luoyang Refractory Materials Institute
thirty-three
Zhongda Continuous Casting Technology Co., Ltd
thirty-four
thirty-five
thirty-six
thirty-seven
thirty-eight
thirty-nine
forty
forty-one
Yangling Western Phytochemical Company
forty-two
forty-three
forty-four
Xi'an Ruite Rapid Manufacturing Co., Ltd
forty-five
forty-six
forty-seven
forty-eight
Tianjin Heavy Equipment Engineering Research Company
forty-nine
fifty
fifty-one
fifty-two
Tianjin Onsai Cell Genetic Engineering Co., Ltd
fifty-three
fifty-four
Tianbang Membrane Technology Co., Ltd
fifty-five
fifty-six
fifty-seven
fifty-eight
Shanghai National Engineering Research Center for Antibody Drugs Co., Ltd
fifty-nine
Shanghai CSSC Ship Design Technology Co., Ltd
sixty
Shanghai Modern Pharmaceutical Preparation Co., Ltd
sixty-one
sixty-two
Shanghai Light Alloy Precision Forming Co., Ltd
sixty-three
Shanghai Nanotechnology and Application Company
sixty-four
sixty-five
sixty-six
Shanghai Huaming High Technology Group
sixty-seven
sixty-eight
sixty-nine
Shanghai HD Digital Technology Industry Co., Ltd etc.
seventy
Shanghai Power Generation Equipment Complete Design Institute etc.
seventy-one
Shanghai Urban Pollution Control Co., Ltd
seventy-two
Southern National Engineering Research Center for Urban Water Resources Development and Utilization
Shanghai Urban Water Resources Development and Utilization Company
seventy-three
REC Rare Earth Metallurgy and Functional Materials Co., Ltd
seventy-four
seventy-five
seventy-six
seventy-seven
Nankai University
seventy-eight
Nanjing Panda Digital Development Co., Ltd
seventy-nine
eighty
Nanjing Hailing Traditional Chinese Medicine Pharmaceutical Technology Co., Ltd
eighty-one
eighty-two
eighty-three
Jilin Huarun Biochemical Corn Development Co., Ltd
eighty-four
Jilin Dongchuang Soybean Science and Technology Development Company
eighty-five
eighty-six
eighty-seven
Huawei Metal Mineral Resources High Efficiency Recycling Company
eighty-eight
eighty-nine
Huagong Manufacturing Equipment Digital Company
ninety
North China Pharmaceutical Group New Drug Company
ninety-one
Hunan Keliyuan New Energy Co., Ltd etc.
ninety-two
Hunan Haili Huilin Life Technology Co., Ltd
ninety-three
Aerospace Science and Industry Simulation Technology Company
ninety-four
ninety-five
Hailke Chemical Engineering Plastics Co., Ltd
ninety-six
ninety-seven
Northern National Engineering Research Center for Urban Water Resources Development and Utilization
Harbin University of Technology Water Resources Co., Ltd
ninety-eight
Hadian Power Generation Equipment Co., Ltd
ninety-nine
National Computer Virus Center , Beijing REC, etc
one hundred
State Grid Corporation of China, Nanjing Automation Institute
one hundred and one
one hundred and two
Guangzhou Hanfang Modern Chinese Medicine Company
one hundred and three
Guangdong Zhongda Nanhai Marine Biology Co., Ltd
one hundred and four
Guangdong Jida Gene Pharmaceutical Co., Ltd
one hundred and five
one hundred and six
one hundred and seven
one hundred and eight
Dalian Xinyuan Power Co., Ltd
one hundred and nine
Dalian Shipbuilding Co., Ltd
one hundred and ten
Dalian Ship Navigation System Co., Ltd
one hundred and eleven
Chengdu Kaili Chiral Technology Co., Ltd
one hundred and twelve
Beijing Zhongyan Tongrentang Pharmaceutical Co., Ltd
one hundred and thirteen
Beijing Zhengdan International Technology Co., Ltd
one hundred and fourteen
Beijing Weigu Biological Medicine Co., Ltd
one hundred and fifteen
Mining and Metallurgy Technology Group Co., Ltd
one hundred and sixteen
one hundred and seventeen
Beijing Kaiyin Biotechnology Co., Ltd
one hundred and eighteen
one hundred and nineteen
one hundred and twenty
one hundred and twenty-one
National Engineering Research Center for Large Scale Integrated Circuit CAD
one hundred and twenty-two
National Engineering Research Center for E-government Application Infrastructure
Beijing University of Aeronautics and Astronautics , China Electronics Technology Standardization Institute, etc
one hundred and twenty-three
one hundred and twenty-four
one hundred and twenty-five
Beijing Bo'ao Biochip Co., Ltd
one hundred and twenty-six
Beijing Beida Software Engineering Co., Ltd
one hundred and twenty-seven
Anhui Fengyuan Fermentation Technology Co., Ltd Jiangnan University etc.
one hundred and twenty-eight
The second batch

Liaoning Province

Announce
edit
Liaoning There are 7 research centers in the province, respectively Northeastern University Construction Neusoft Group Participating in co construction National Engineering Research Center for Computer Software , by Shenyang Fire Research Institute of Emergency Management Department Leading construction National Engineering Research Center for Fire Protection and Emergency Rescue , by the Chinese Academy of Sciences Shenyang Automation Research Institute Leading construction National Engineering Research Center for Robotics , by Shenyang Sinochem Pesticide Chemical R&D Co., Ltd Leading construction National Engineering Research Center for Pesticides Shenyang ), Shenyang Scientific Instrument, Chinese Academy of Sciences limited company Leading construction National Engineering Research Center for Vacuum Technology and Equipment , by Sinosteel Anshan Thermal Energy Research Institute Co., Ltd Leading construction National Engineering Research Center for Coking Technology , and Dalian Chemistry, Chinese Academy of Sciences Institute of Physics National engineering research on low-carbon catalytic technology Heart. [3]

data statistics

Announce
edit
On February 29, 2024, the National Bureau of Statistics issued the Statistical Bulletin of the People's Republic of China on National Economic and Social Development in 2023, which included 207 national engineering research centers under new sequence management. [6]