Uploaded on: 2018-11-08 11:10:01 come from: Architectural design / Chinese ancient architecture / Antique architecture
zero
4 points

The steel pipe piles shall be driven at a distance of 100cm. The steel pipe piles must be firmly embedded in the base and connected with the concrete guardrail as a whole. The bearing capacity of foundation shall not be less than 150KN/m. Reflective paint shall be applied on the collision face of guardrail and pier. The total length of guardrail is 50m. The communication pipeline is divided into six holes and laid around the two side walls of the central pier section. The six hole silicon core pipes on both sides use two holes θ 114 × 4.5mm galvanized steel pipe protection, steel pipe buried depth 67cm. The communication pipeline is divided into "2m transition section" before the 6-hole central pier section, which is protected by C15 enveloping, with enveloping thickness ≥ 5cm and pipeline bending radius ≥ 1m. The civil engineering unit is responsible for embedding the galvanized steel pipes on both sides of the middle pier to the end of the transition section of the guardrail, and sealing the galvanized steel pipes; The pipeline construction unit is responsible for the laying and commissioning of six hole silicon core pipes on both sides of the "2m transition section"+central pier. ...... 1 in total, designed in 2013

 Structural Drawing of Pier Crash Barrier - Figure 1

Structural Drawing of Pier Crash Barrier - Figure 1

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment