Construction Organization Design of Corrugated Beam Steel Guardrail for New Village to Village Highway
This data is the construction organization design of the corrugated beam steel guardrail of the new village to village highway. ① The column shall be set out according to the construction drawings, and the intersection, the electric pole, the mountain path, etc. shall be used as the control points for distance measurement and positioning. The spacing can be adjusted by the adjustment section, and the distribution method can be used to deal with the odd spacing. ② In order to accurately set out and ensure the alignment of the guardrail, the pile number shall be rechecked and closed at intervals. ③ After setting out of columns, the ground state of each column position shall be investigated. In case of underground communication pipeline, water discharge, etc., or insufficient burial depth of culvert top, the position of some columns shall be adjusted to change the column fixing method.