1、 Project overview:
The project is an international hotel, with 12 floors above ground and 1 floor underground. The total building height is 44.5m, and the total building area is 14800m2
2、 Cold and heat sources:
The centralized cooling source of air conditioning in summer is two screw chillers located in the basement, and the heat source of air conditioning in winter is the urban heat supply network
3、 Air conditioning system:
1. The air conditioning water system is a primary pump variable water volume dual pipe system.
2. The air-conditioned room adopts fan coil unit plus fresh air
4、 Ventilation system:
1. Mechanical exhaust system is adopted for the air exhaust of the whole building, and natural air make-up is adopted for the air inlet except for the guest rooms.
2. Indoor ventilation frequency (times/hour): toilet: 10, kitchen: 40, dishwashing room: 6, laundry room: 10, equipment room: 6, power distribution room: 6, substation room: 8
There are 12 drawings in total.