Supervision outline of solar photovoltaic project (bidding)
Section I Scope of supervision services 1. Organize design review, "five supplies and one leveling" stage, project construction and commissioning stage, trial production, completion acceptance and delivery production stage, quality assurance period and other construction processes in the preparation stage before the commencement of the project, construction bidding stage, carry out supervision and services, and participate in the project quality report. Physical projects include: road construction inside and outside the station; Solar photovoltaic support and foundation construction; Solar photovoltaic panel installation works; Civil engineering and equipment installation works of box type transformer foundation, civil engineering and equipment installation works of inverter room; Booster station and auxiliary civil works, equipment installation works; Civil works and equipment installation works of power collection line and transmission line; Installation, commissioning and acceptance of primary and secondary equipment (including end-to-end access system bay, etc.); Installation, commissioning and acceptance of overall communication engineering, fire engineering, cable trench, grounding system, construction power supply and construction water source; Assist the project unit in all matters related to the project, such as equipment unloading, storage management, environmental protection, safe and civilized construction and vegetation restoration. The whole process supervision of the project is carried out according to relevant specifications, procedures, contract agreements, etc., that is, safety management, quality control, progress control, investment control, and responsibility for the supervision during the quality assurance period. 2. In the early stage of construction, assist in the preparation of project construction plans, construction bidding, procurement bidding, and signing of construction contracts and procurement contracts; Control the construction investment, construction period and project quality in the construction implementation stage; Carry out project construction contract management; Cooperate in the settlement, audit, data sorting and archiving of the project; Supervise construction safety and environmental protection; Coordinate the working relationship among relevant units such as engineering construction, supply and design; And the work content of "three controls, three controls, and one coordination" will always run through all stages of the project construction; Prepare supervision plan and implementation rules according to the contract and design documents; Organize the preparation of the construction organization design outline, assist the project unit to complete the overall construction schedule, etc. After the completion of defect elimination in the project trial run and the normal operation of the system electrification, the project can leave the site with the consent of the construction management unit. When the project is put into production in compliance with the standard and the activities of creating excellence in each stage, the cooperation work shall be carried out according to the relevant notice until the end of the warranty period and the work of creating excellence.