The data are compiled by well-known domestic enterprises for famous bridge projects. The north bank approach of the bridge is 194m long, with a span of 3 × 46+50+6 (abutment) m, the south bank approach is 240m long, with a span of 4 × 46+50+6 (abutment) m, the approach is 434m long, the bridge width and subgrade width are 35m, and constant cross-section prestressed concrete continuous box girder is used. The box girder cross bridge adopts single box six compartment section, The height at the center line is 3.5m, and the bridge deck is laid in two directions by 2%. The bridge height changes from 3.5m at the center line to 3.16m. The top plate of the box girder is 34m wide and 28cm thick, and the bottom plate is 21m wide and 25cm thick. The inclined web of box girder is 7.389m long and 20cm thick. The bottom plate of the hanging wall corbel at the junction with the platform between the ribs is 29.702 meters wide, and the mid span web of the box girder is 50 cm thick. At L/4~L/5, a web width transition section is set, and at the fulcrum, a diaphragm with a width of 1.5~3.0 meters is set to form a concealed capping beam, and a transverse prestressed steel tendon is configured. [Content excerpt] The approach bridge concrete box girder is constructed with a span by span erection cast-in-situ scheme, Cast in situ in sequence from the rib platform to the abutment, set construction joints at the cantilever of L/5 (9.0m from the center of the front pier of the secondary span) for each span... Erect two spans of supports at the same time, so as to construct the cantilever sections of the first span and the secondary span at the same time. After the concrete reaches the specified strength and the tensioning and grouting is completed, remove the supports of the first span and erect the supports of the third span, and carry out the construction in sequence. The support adopts the construction scheme of full hall bowl buckle support...... The support adopts WDJ Φ 48 × 3.5 mm steel pipe bowl buckle type steel pipe frame, and the vertical pole mainly adopts 3.0m, 2.4m, 1.8m, 1.2m. The vertical pole is lengthened and staggered. The length of the top pole is 1.5m, 1.2m, 0.9m, and the cross pole is 0.9m, 0.6m, 0.3m. The top and bottom brackets are adjustable braces...... [CAD and table attached] Bill of quantities of main engineering materials, layout of cross bridging, 3 CAD drawings of cross section of box girder of north bank approach bridge, 2 CAD drawings of support layout of span pier of box girder of approach bridge, 3 CAD drawings of cast-in-situ support layout of box girder of approach bridge, 2 CAD drawings of cast-in-situ support layout of box girder of approach bridge, bar chart of box girder construction progress, 34 pages in total,