Uploaded on: July 25, 2020 18:58:48 come from: electrical engineering / Electrical data / Example of electrical calculation
zero
3 points

Dongguqiu Third Bridge is a 6 * 16m long cast-in-place reinforced concrete continuous box girder bridge with single box and double rooms. This bridge is located on the second reverse transition curve, and the common tangent point of the reverse curve is at K30+071.673. The longitudinal slope on the bridge is - 2.5%, and the right side of the whole bridge in the first, second and third bridge openings is widened to K30+071.673, with the maximum widening of 54.7cm; Other bridge openings are not widened, so 6 * 16m cast-in-place box girder is adopted, with the starting and ending chainages of K30+033.46-K30+130.54, the bridge center chainage of K30+082, and the whole bridge length of 97.68m.

 Cast in situ continuous box girder scheme and support calculation - Figure 1

Cast in situ continuous box girder scheme and support calculation - Figure 1

 Cast in situ continuous box girder scheme and support calculation - Figure 2

Cast in situ continuous box girder scheme and support calculation - Figure 2

 Cast in situ continuous box girder scheme and support calculation - Figure 3

Cast in situ continuous box girder scheme and support calculation - Figure 3

 Cast in situ continuous box girder scheme and support calculation - Figure 4

Cast in situ continuous box girder scheme and support calculation - Figure 4

 Cast in situ continuous box girder scheme and support calculation - Figure 5

Cast in situ continuous box girder scheme and support calculation - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment