People's Network
People's Network

There was a reply that netizens suggested increasing the number of power exchange stations. The new power exchange station in Baishan, Jilin, was commissioned on December 25

December 19, 2023 08:23 | Source: People's Daily Online Jilin Channel
Small font size

People's Daily Online, Changchun, December 19 (Reporter Wang Haiyue) Recently, netizens in Baishan City, Jilin Province left a message to the mayor of Baishan City on the "Leaders' Message Board", suggesting that the government should properly optimize the layout of power exchange stations, increase the number of power exchange stations and expand the scale of power exchange stations according to the ownership of new energy vehicles and considering the needs of long-term development.

Screenshot of "Leader Message Board"

"There is a Guangming Street power station in the northeast corner of Hongtai Phase III, where new energy taxis often queue long for charging, far to the west of Baishan Natatorium, which has a great impact on the operating efficiency of new energy taxis." Netizens wrote in the message.

After receiving the message, Baishan Municipal Government quickly coordinated with Baishan Transportation Bureau for verification and handling. The staff of the bureau listened to the opinions and suggestions of the new energy taxi drivers at the Guangming Street power station, and analyzed the reasons and studied measures together with the leaders of the Municipal Bureau of Industry and Information Technology and the Communications Investment Group.

Screenshot of "Leader Message Board"

It is reported that the Baishan Transportation Bureau has taken four measures to ensure the efficient operation of the existing No. 1 and No. 2 power exchange stations: hiring professionals to the site to troubleshoot equipment failures, carry out comprehensive maintenance, ensure normal operation, and hire them as technical consultants to provide regular guidance and maintenance services; Increase the number of personnel in the service post of power exchange station, reduce the power exchange detention time, strengthen communication with taxi drivers, and obtain understanding and support; Strengthen the professional technical training for the operators of the power exchange station, add technical maintenance posts, and develop the "early morning maintenance" system to ensure the smooth and trouble free operation of the equipment; Add taxi chassis deicing equipment and snow shelter channel to reduce the impact of rain and snow on power exchange.

At the same time, Baishan City is building No. 3 power exchange station. It is understood that the construction of No. 3 power exchange station was officially started on September 28, and the trial operation is expected to start on December 25.

Next, Baishan Transportation Bureau will coordinate with the Municipal Bureau of Industry and Information Technology, Urban Development Group and Traffic Investment Group to actively take measures to solve the problem of difficult power exchange of new energy taxis in winter.

There is nothing trivial about people's livelihood. Please come to the "Leader Message Board" to talk about your anxieties and anxieties.

(Editor in charge: Wang Haiyue, Xie Long)

Share to let more people see

Back to top