People's Network
People's Network >> Hebei Channel

Closure on the south side of the main bridge of the Yellow River Bridge on Xiong (An) Shang (Qiu) High speed Railway

May 21, 2024 09:09 | Source: People's Daily
Small font size

On May 18, the main bridge of the Yellow River Bridge on Xiong (An) Shang (Qiu) High speed Railway was closed on the south side of the main bridge, laying a solid foundation for the subsequent full bridge connection and arch rib installation and lifting. Xiongshang high-speed railway is an important part of China's "eight vertical and eight horizontal" high-speed railway network, and is also the main channel of north-south railway passenger transport in central China. The main bridge of the Yellow River Bridge of Xiongshang High speed Railway is 1600 meters long, which is one of the important control projects of the Xiongshang High speed Railway Project. The picture shows the construction site on the south side of the main bridge of the Yellow River Super Major Bridge of Xiongshang High speed Railway.

Photographed by Liu Yucai (image of China)

People's Daily (May 21, 2024, Version 1)

(Editor in charge: Lin Fusheng, Fang Tong)

Share to let more people see

Back to top