energy management

Scientific planning, organization, inspection, control and supervision of the whole process of energy production, distribution, conversion and consumption
Collection
zero Useful+1
zero
Energy management is the general term for scientific planning, organization, inspection, control and supervision of the whole process of energy production, distribution, conversion and consumption. The content includes: developing correct energy development Policies and Energy saving policy , continuous improvement Energy planning Energy regulations , energy control system, arrange Industrial energy Domestic energy Production and operation; Strengthening energy device management , timely check the boiler Industrial kiln , all kinds of electrical appliances, etc Energy utilization rate , Implementation Energy quota management , calculate the energy Effective consumption and Technological loss And check and approve each item level by level Energy consumption quota , and through economic Responsibility system and Reward and punishment system hold energy consumption The quota shall be implemented to workshops, teams and individuals, and the enterprise shall be urged to reach the advanced level of energy consumption, Regular inspection Key enterprises, key projects and Key equipment Continuously carry out technical analysis on the degree of effective utilization of energy to establish and improve energy management system , forming Professional management And Mass management Combined energy management network, educate staff to establish energy conservation awareness, and constantly strengthen energy consumption Metrological supervision , standard supervision and statistical supervision. [1]
Chinese name
energy management
Foreign name
energy management
Discipline
Resource technology -> Energy Resources
Professionals
Energy manager [3]

Management process

Announce
edit
energy Management process There are three stages:
1. Start to win the consent of the top management; Goal setting; Building energy Management organization
2. Analysis and planning , Yes energy-resource structure . Historical review of restrictions; Energy audit Plan of energy conservation measures; Evaluation of selected schemes;
3. Execution and control , approval of required resources; Determination of objectives and responsibilities; Establish measurement and reporting system; Implementation of measures; Evaluation results.

Preparation procedure

Energy saving awareness
The energy conservation awareness of the enterprise's energy management department can come from all aspects, and it does not matter which aspect it comes from for the energy management project. It is very important to persuade the top management of the enterprise to establish a project, so that they can firmly support the project and approve the required financial and human resources. Remember, no one promises a goal unless he believes it. A successful energy management project needs the support of all staff, especially the active support of the top management department, which will not only approve the required resources, but also persuade others to understand and improve Energy utilization rate Generally speaking, it is an important task for enterprises. The stronger the awareness of energy conservation, the more energy can be saved.
Project content
After the top management department approves and promises to support the energy management project, it will also make some decisions on the objectives and tasks. Such as budget, project duration, who will participate in the project, etc. The management department needs to make decisions on the following:
——Energy management project boundary condition Objectives;
——Date of completing the energy utilization analysis, Energy saving project The date of;
——Candidates for intermediate management personnel responsible for energy management projects and project leaders (energy management personnel);
——Establish an energy management organization in the enterprise.
These decisions are made by the top management body, but are usually prepared by the Energy Regulatory Commission. The energy management staff leads the energy management committee. The management committee includes the middle level of functional department or product department Managers Therefore, the top management usually only selects the members of the Energy Management Committee, and then the objectives, tasks, schedule and budget of the energy management project of the Committee are approved by the top management. In addition, the Committee should coordinate plans, introduce new ideas and new perspectives, and Guaranteed on One part of the factory takes action without adversely affecting other parts.
Energy saving goal
Based on the preliminary energy audit, the energy conservation objectives must be clearly defined. Note: The implementation date must be carefully considered, because the bonus is limited, and the financial target is Energy objectives It also needs to be clear. Typical energy saving objectives shall be specified as follows:
(1) Reduce electricity charge by% annually;
(2) Reduce steam use by%;
(3) Reduce fuel use by%;
(4) Reduce natural gas use by%;
(5) Reduce the use of compressed air by%.
Recovery target
As follows:
(1) Minimum pre tax investment rate of recovery
(2) The shortest repayment period;
(3) Every year at Energy saving /The minimum ratio of investment cost to material is;
(4) Minimum investment recovery rate after tax.
Another important task of the factory level energy conservation committee is to promote Information exchange And energy conservation activities. However, the factory level energy conservation committee cannot do everything, but should be done by those who are familiar with the specific operation and can achieve the greatest success. The branch level energy coordinator needs to understand the energy conservation goals and annual savings production costs And its impact on the company's performance.

Analysis plan

To be managed by energy Project preparation Well, after the establishment of the energy organization, the next stage is analysis and Planning work In the second section, we have explained that the planning work is formulated on the basis of considering the past, the present and the future. This part must be kept in mind during the analysis and planning stage, and where is the energy used by the enterprise analyzed? How is it used? The analysis of energy data should include the following stages: (1) review of past energy utilization; (2) Energy audit; (3) Engineering analysis (4) economic analysis
Energy survey
The historical situation can be investigated according to the public power company Of electricity bills , factory records, production statistics or other possible data. The task of the survey is to understand the long-term and short-term trends in energy utilization, such as what is the benchmark for energy management projects to try to improve energy utilization. In addition, consider the past energy consumption structure and its importance in energy management projects. Deeply understand the following Tendency The question is helpful to the energy manager:
——Past energy consumption Increase or decrease? (Consider the past 5 years)
——Whether there is energy consumption Seasonality Change of? (summer or winter peak)
——Are the data complete? (For the whole plant and each department Energy consumption
——Is there any temporary change in energy consumption? (% per annum)
——Is there any temporary change in energy consumption? (Off duty and on duty, weekends and weekdays, etc.)
In addition to revealing a certain structure and trend of energy consumption, the review of historical situation also reveals that Energy audit Compared with other subsequent work basic data However, historical review itself can never provide enough information for determining effective energy utilization projects Information Almost no enterprise has all Recording device , provide detailed information about the classification of energy consumption in the factory.
It usually shows historical energy consumption and output The relationship between Production process It is often useful, and can provide comparative data between two or more plants (note that this energy consumption comparison often gives people an illusion. For example, two comparable plants are located in different Climatic zone City, there is no energy consumption Comparability )。
Take energy consumption per unit output as energy index( Unit consumption ), which depends on the Final product The nature of. Typical energy indexes of metals, chemicals, cement, etc. can be expressed in PJ/kg; Transport system Available fuel consumption per passenger or km /T means.
The next task is to audit all energy consumption activities in order to clearly record energy consumption in all aspects and find the possibility of energy conservation. How to do audit? What information does the audit include? This will be discussed later in this book. Energy audit Generally, the following problems should be solved: purchase of energy; Converted energy; Energy generated; Energy in ex factory products; energy loss
Once the analysis of past and current energy consumption data is completed, planning measures can be started. The plan is necessary, so the company's energy conservation management personnel can make a decision on how to implement the project earlier. In order to clarify the key points, it must be determined that Energy saving potential Area range of. To Grass roots management personnel Provide work guidelines, methods and opinions, so as to give play to their creativity and make significant contributions to the project.
Investigation record
Fuel
Current price
Estimated annual price increase
Energy equivalent
natural gas
fuel oil
coal
power
steam
Steam kPa
Steam kPa
Steam kPa
compressed air
Compressed air kPa
Compressed air kPa
water
Boiler make-up water
ECU……/1000m
ECU……/kg
ECU……/ton
ECU……/kWh
ECU……/1000kg
ECU……/1000kg
ECU……/1000kg
ECU……/1000m
ECU……/1000m
ECU……/1000m
ECU……/1000kg
ECU……/1000kg
ECU……/1000m
ECU……/kg
ECU……/ton
ECU……/kWh
ECU……/1000kg
ECU……/1000kg
ECU……/1000kg
ECU……/1000m
ECU……/1000m
ECU……/1000m
ECU……/1000kg
ECU……/1000kg
……kJ/m
……kJ /kg
……kJ /kg
……kJ /kWh
……kJ /1000kg
……kJ /1000kg
……kJ /1000kg
……kJ /1000m
……kJ /1000m
……kJ /1000m
……kJ /1000kg
……kJ /1000kg
Minimum recovery
Economic life
Life cycle budget estimates and methods
-
-
-

Executive control

The implementation phase is the most critical phase of the whole project, because it is the main goal of any energy management effort. In this stage, the plans and measures determined by the energy manager will be realized. In order to implement energy-saving measures, enterprises must be willing to make necessary investments. Energy management measures can be divided into the following three categories:
——Operation and maintenance (routine) measures, including organizational measures;
——Renewal and transformation measures;
——Measures for new equipment or large-scale construction.
The investment required for the above three measures will increase in turn. The investment in conventional measures is very small (if any), while the construction measures need a lot of investment.
Execution steps
many Industrial and mining enterprises The investment bonus of is limited, and they hope that the investment repayment period is less than one year. Large enterprises with bonus channels hope that the repayment period is 2-3 years, and some government agencies allow 3-10 years. The energy manager needs to determine energy conservation at the beginning of the project Project Repayment period of. The following steps are:
(1) Establish energy conservation objectives of each department, division or individual;
(2) Prepare report procedures;
(3) Constantly improve the awareness of energy conservation and encourage people to participate in energy conservation;
(4) For the whole energy management project Regular inspection Prepare for evaluation.
Most of these steps are self-evident and do not need further elaboration. Steps (1) and (2) reflect the basic Management concept That is, the conditions under which people can work efficiently are:
——They know what to achieve and the purpose of their task;
——They receive feedback on how well they are doing.
It is particularly important to encourage people to participate in energy conservation, because ultimately it is mankind who has created the engineering miracle of energy conservation and money saving. Experience shows that more efficient equipment and improved process methods are only half the success. Human factor Extremely important, but often overlooked. If the operators do not understand the need to improve efficiency, do not believe or will not operate their new and improved equipment, use the new equipment to reduce the plant Energy cost The effect will be very small.

Regular inspection

Finally, once energy-saving measures are adopted, they must be checked regularly to identify strengths and weaknesses and make necessary changes. In order to adapt to economic changes (fuel and energy price increases) and technological changes, the project must be adaptable. With the progress of the project, the requirements will also change. Generally, the easy things will be realized first, but it is more and more difficult to find new and important energy conservation schemes.
Not only the project needs regular inspection, but also the implemented measures must be evaluated and adjusted, which is called Control work Energy managers use previously discussed indices such as Unit product To check whether the implemented measures are truly energy-saving. This is to find out whether the project is going as planned? If not, what should I do? What corrections need to be made? Do you need additional resources? Does the project deviate from the plan? These are the questions that energy managers must answer themselves. analysis report The results of will determine whether the project has achieved the maximum effect, what factors affect or promote the progress of the project (which will lead to changes in focus), and how to maintain the original results. Control is a function that managers must perform in order to continue to complete the project and improve its results.

Management report

Announce
edit
An important feature of the implementation of energy-saving measures is to report the relevant progress to the top management. Top management is of course interested in the progress of the project and the energy-saving effect that has been achieved. However, they do not require to know everything in detail. The report should meet the requirements of readers.
The report to the top management organization shall briefly report the amount of savings (ECU and PJ), investment amount, and compare the possible energy saving index with the target index. In addition, all energy-saving engineering tasks of each department shall be listed, including expense of execution And savings, and once again align the stated results with the goals of each department Compare
The report of each factory shall be attached with a brief description of the special aspects of the project, and describe what activities have been carried out. These reports are quarterly.
It is not only necessary to make the report on energy management activities available to the top management organization on a regular basis, but also division manager Personnel and foremen should also receive them regularly. They need more detailed information, such as information about their department and the successful programs of other factories (but can also be implemented in their factories).

management system

Announce
edit
Built on international open hardware and software Control platform , with height Openness compatibility And reliability, using modern measurement and control technology, data processing and Communication technology , based on perfect energy consumption monitoring Management means , using decentralized controllers and AC sampling Technology, with powerful large traffic high reliability Communication network for industry Civil buildings , production enterprises and large-scale infrastructure Energy facilities Full time dynamic energy management control Provide comprehensive and professional solutions to meet the requirements of energy Energy consumption equipment And complete mastery of energy consumption process.

Typical functions

1. Acquisition status monitoring and alarm;
2. Management;
3. Energy consumption management and data report;
4. Basic information of the building, energy consumption by category and item and relevant information Energy consumption index Display;
5. List of hourly original readings of the above classified and itemized energy consumption of each monitoring branch;

Goal achievement

1. Real time monitoring and detailed management of overall energy consumption of buildings and industrial facilities
2. Electricity, gas, water, etc Classified energy consumption Transparency of data and energy consumption data
3. Provide all-round real-time high-precision data of various energy consumption for other advanced applications
4. Building and industrial facilities for users energy system Fine design and Energy saving transformation Provide basis
5. Total energy consumption statistics and trend analysis
6. Energy consumption cost structure optimization
7. Electricity, gas, water, etc Energy supply Interruption, accident trip, fault Cause analysis
8. Trend recording helps optimize resources and Business model plan

Example of operation

Announce
edit
Source of example: energy management application in catering industry
Energy survey
The management team shall conduct a complete restaurant energy survey every six months in the season when air conditioning and heating are used. The management group that has completed the equipment training is the ideal person in charge, and can be designated as "equipment" Executive Manager
Energy survey can show the energy implemented by the restaurant Management principles It can know which equipment has the greatest impact on the establishment of good energy management, and can prompt the restaurant to Alertness It can also help you find out the current or potential energy waste problems, and correct or prevent them to maintain the lowest energy cost as far as possible.
After correcting the error of inefficiency, a complete form record should be kept as the "report card" of the restaurant's energy situation. Please study the nearest energy of the restaurant investigation report If the restaurant has not implemented this system, please implement it immediately.
Energy inventory
Like other raw materials, energy can also be inventoried. Restaurants should have regular plans to measure energy use and compare current usage with the same period last year. Inventory the energy that should be used Calculation unit As follows:
Water: m3 three
Electricity: kWh
Gas: m3 three
The energy inventory plan should collect the efforts of all staff in the restaurant, so the results should be published monthly to let each staff know how the results are. It is very important for all personnel to understand that your efforts to control energy are very important, because the success of maintaining energy costs depends on the degree of cooperation of all personnel in the restaurant. The following is the method of energy inventory system:
(1) Set up a restaurant Basic consumption
Each restaurant keeps an annual energy use table (see Table 1), and turnover Estimate and make monthly plans for water, electricity and gas Usage expenses At the same time, the actual monthly consumption will be drawn on the energy use chart (grid paper can be used), and this will be posted and announced. On the same chart, you can show the comparison of actual usage in the same period last year, so that every employee can understand the effectiveness of energy management. (See example of energy use diagram)
(2) Color spot system
The color spot system is turned on and off by the restaurant by controlling lighting, air conditioning and other equipment Energy management system Using the color dot system, the color dot can be pasted on the lighting a distribution board And switches, air conditioning distribution boards and switches, so that the management group can save energy.
On the lighting equipment distribution board and switch, decide which switch controls which part of the lighting equipment and record it for future reference. Decide which lighting equipment must be turned on continuously during business hours and which power supply can be turned off during certain periods to energy conservation Then, label and color dot to distinguish.
The suggested color spots of lighting equipment are as follows:
*Red ------- must be turned on at all times (anti-theft lights at night, etc.)
*Blue ------ Open when employees arrive at the restaurant and close when they leave the restaurant (opening, closing and cleaning lights, manager's room door lights, etc.)
*Green ------ open at the beginning of business and close at the end of business (such as the dining area in the hall)
*Yellow ------ open at dusk or when necessary, close after business (such as outdoor signboards, etc.)
proposal Air conditioning equipment The color points of are as follows:
*Green -------- Open at the beginning of business and close at the end of business
*Blue -------- Open when employees arrive at the restaurant and close when they leave the restaurant
*Yellow -------- open when necessary (such as the air conditioner on the floor not open)
The key to saving energy costs is to turn off the power that can be turned off at any time. It must be ensured that all members of the management team understand the importance of the restaurant's color dot system and can use it.
Macro note: if the color dot fails to express, add a text note.
(3) Device on timetable
Turn off unnecessary equipment to save energy. The key is to find out which equipment does not need to be turned on during the period of low daily or weekly turnover. For production area service area The "equipment startup schedule" is proposed for each equipment, based on the business form of the restaurant. A separate "equipment shutdown schedule" shall be prepared to cope with other conditions, such as low peak hours in the afternoon or Freezing weather And so on.
The establishment of start-up schedule for all electrical appliances and gas equipment in the production area and service area is to reduce Power demand The real opportunity for these devices to Warm up Power consumption is more than that required to reach operating temperature. Start one equipment at a time, and after warming up, start another equipment to reduce the available power to the minimum.

Relevant rules

Announce
edit
Energy Management System Certification Rules
To promote Energy management system Construction and energy standardization Management system certification Activities to constantly improve the energy management level of enterprises and give full play to Certification and accreditation The National Certification and Accreditation Administration and the National Development and Reform Commission, in accordance with the《 Regulations of the People's Republic of China on Certification and Accreditation 》And the Notice on Strengthening the Construction of Energy Management System of Ten Thousand Enterprises (FGHZ [2012] No. 3787), and formulated the Certification Rules for Energy Management System. [2]