Jinan West Railway Station

Railway Station in Huaiyin District, Jinan City, Shandong Province, China
open 2 entries with the same name
Collection
zero Useful+1
zero
Jinan West Railway Station, also known as Jinan West Railway Station, is located in Jinan, Shandong Province, China Huaiyin District No. 6 Qilu Avenue, the first-class passenger station under the jurisdiction of China Railway Jinan Bureau Group Co., Ltd., is the passenger station of Beijing Shanghai High speed Railway, Shijiazhuang Jinan High speed Railway and Jiaozhou Jinan Passenger Dedicated Line, and is one of the five departure stations of Beijing Shanghai High speed Railway [1] [31]
The foundation of Jinan West Railway Station was laid on July 12, 2009. [2] On June 30, 2011, along with Beijing Shanghai High speed Railway Completed and put into use. [3]
As of January 2020, the total construction area of Jinan West Station is 100000 square meters, and the scale of the station is 8 sets and 17 lines (1 set and 1 line are reserved in the future); The design capacity of the station is 40000 people, including 30000 people in the east square and 10000 people in the west square. [4]
Chinese name
Jinan West Railway Station
Foreign name
Jinanxi Railway Station
Station code
sixty-six thousand eight hundred and twelve
Date of use
June 30, 2011
Region
Huaiyin District, Jinan City, Shandong Province, China
Station level
First-class station
built-up area
100000 square meters (as of April 2016)
Platform scale
8 sets of 17 lines (1 set of 1 line reserved)
Station address
Jinan, Shandong Province Huaiyin District Xingfu Street

Historical evolution

Announce
edit
Appearance of Jinan West Railway Station
In December 2005, Jinan issued the "Overall Urban Planning of Jinan 2005-2020", which proposed to plan a new Jinan Station to be built on the west side of Beijing Shanghai high-speed railway in combination with the construction of Beijing Shanghai passenger dedicated line.
On July 12, 2009, the construction of Jinan West Railway Station was officially started. [5]
On July 21, 2010, the two sides of the main project of Jinan West Railway Station were capped.
On May 22, 2011, the main works of Jinan West Railway Station were completed and accepted. On June 30, Jinan West Railway Station was officially opened with the opening of Beijing Shanghai high-speed railway. [6]
On July 1, 2012, Jinan West Railway Station opened its first direct train to Qingdao. [7]
On July 1, 2013, the Beijing Shanghai High speed Railway and the Beijing Guangzhou High speed Railway were interconnected, and Jinan West Station opened direct high-speed trains to Wuhan, Changsha and other places. [6] On December 28, Jinan West Railway Station opened high-speed trains to Harbin, Dalian, Changchun, Shenyang, Guangzhou and other cities for the first time. [7]
On July 1, 2014, Jinan West Railway Station opened its first high-speed train to Xiamen. [6]
On May 3, 2017, Jinan Municipal People's Government The official website announced that the Zhengzhou Jinan High speed Railway will go to Changqing to connect with Jinan West Railway Station. [1]
On December 8, 2023, Jinan Puyang Section of Jinan Zhengzhou High speed Railway will be completed and opened to traffic. [32]

Building scale

Announce
edit

Architectural design

Panoramic Renderings of Jinan West Railway Station
As of April 2016, the total construction area of Jinan West Station is 100000 square meters [8] The area of the main station is 62534 square meters. The design of Jinan West Railway Station reflects the regional and cultural characteristics of Shandong Province. The whole station building has the style of traditional wooden structure buildings. The ceiling of the station building is wavy curved surface, drawing on the characteristics of shop windows in Chinese ancient buildings. The interior decoration of the station building adopts different styles according to the functional areas. [9] In addition, the station adopts the design of large-span canopy without platform columns, so as to broaden the view of passengers. Automatic snow melting system and siphon drainage system are also designed on the roof of the station.
The square in front of Jinan West Railway Station is divided into East West Square. Among them, the west square is 470 meters long from north to south, 110 meters wide from east to west, with a total area of 52000 square meters; East Square, also known as "Ritual and Music Square", was put into use in 2013; The ground construction area of East Square is about 79000 square meters, and the underground construction area is about 90000 square meters. The area of the East Square is equivalent to three West Square, and 30000 people can be evacuated at most. [4] The landscape of the East Square is designed with the theme of "ceremony" and "joy". The landscape design of the square reflects the cultural connotation of Shandong. The six bronze carriage statues on the square reflect Qilu culture and welcome visitors from all over the world. There are three "wine bottles" on both sides of the central axis to show the hospitality of Jinan people. In combination with the characteristics of Jinan's "Spring City", the east square is also equipped with a lotus fountain. The square combines traditional culture with modern urban functions to create the main tone of "hospitality in Shandong, warmth in Jinan". [10]

Overall layout

The station building of Jinan West Railway Station includes the main station building, elevated waiting hall, underground exit area and urban corridor, platform column free canopy and platform, etc. It is a five segment structure with high middle, low sides and symmetry along the axis. [11] The main station building of Jinan West Railway Station has 3 floors above ground and 2 floors underground. [12] The second underground floor is the platform of Metro Line 1; The first floor underground is the transfer space and equipment room; The first floor on the ground is the departure hall, ticket room and other rooms; The second floor on the ground is flush with the platform, mainly including the entrance hall, VIP room, ticket room and other rooms; The third floor above the ground is flush with the elevated waiting room, mainly including the waiting room, auxiliary rooms and some commercial rooms. The station is divided into four floors. The second underground floor is Metro Line 1; The first underground floor is the underground corridor, which is composed of the urban corridor, exit passageway and taxi lane; The upper part of the underground corridor is the platform floor; The uppermost part of the station is an elevated waiting room. [13]
Arrival Hall of Jinan West Railway Station
Passengers can take the elevator or step elevator from the ticket lobby to the waiting hall on the third floor. There are 29 ticket gates and 14 entrances in the waiting hall on the third floor, which can maximize the role of diversion and avoid congestion. After ticket checking, you can go to the platform of the second floor station through the step elevator, stairs and elevator at the entrance. The platform of Jinan West Railway Station can accommodate 26 trains at the same time. In addition, there are VIP waiting area and other facilities on the west side of the second floor of the main station building. [14]
Jinan West Railway Station adopts the mode of "up in and down out". Private cars and taxis can enter directly from the viaduct and the drop off platform next to the second floor of the station building; Pedestrian passengers can get off at the East Square in front of the station, walk along the square channel, enter the drop off platform area from the elevated escalator, and then enter the station uniformly from the east entrance. When leaving the station, all passengers need to arrive at the underground corridor from the platform passageway; Passengers who transfer to a taxi can reach the taxi station through the underground corridor; Passengers who change buses and long-distance buses can go through the underground passage to the bus station and long-distance bus station, or directly to the corresponding parking lot from the ground square. [15]
The square in front of Jinan West Railway Station is divided into east and west squares. The west square is composed of housing construction area and square area. The square area mainly includes south and north parking lots, bus hubs and distribution square; There are two floors under the east square. The first floor is the catering business area, and the second floor is the parking lot. There are 947 parking spaces on the second floor for passengers. [4]

Platform line

Announce
edit
As of April 2016, Jinan West Station has set up 9 sets of 18 lines (including 1 set of 1 line reserved), including 2 main lines, 15 arrival departure lines, including 7 island platforms and 1 side platform. The lines passing through are Beijing Shanghai High speed Railway, Jiaozhouwan Jinan Passenger Dedicated Line, Shijiazhuang Jinan Passenger Dedicated Line, and Jinan Zhengzhou High speed Railway. [8]

Operation

Announce
edit

Self service ticket purchase

Ticket Hall of Jinan West Railway Station
The self-service ticket vending machines at Jinan West Railway Station are located on the first floor and the second floor respectively, which is convenient for passengers from different directions to purchase tickets separately. On both sides of the entrance of the hall on the first floor are ticket halls 1 and 2. Above the ticket hall 2 is ticket hall 3 on the second floor, with 45 ticket vending machines in total.
The automatic ticket vending machine has two ticket selling modes. The 30 sets in No. 1 and No. 2 ticket halls only support bank card charging. The ticket vending machine includes second-generation ID card identifier, bank card entrance and exit, ticket exit, credential exit and password keyboard; The 15 sets in No. 3 ticket lobby not only support bank card charges but also bank note charges. They can identify RMB with different denominations of 5 yuan, 10 yuan, 20 yuan, 50 yuan and 100 yuan, and also have the change function. [16]

Convenience facilities

  • Customer Service Center
Jinan Tourism Consulting Service Center was set up in the exit channel of Jinan West Railway Station. [17]
  • Public security certification
Jinan West Railway Station has a public security card making window, located in the ticket lobby, which can provide temporary ID card processing services. [18]
  • Charging parking space
In August 2014, Jinan Station built a large parking lot for 600 vehicles in the West Railway Station to meet the parking needs of citizens. In addition, the West Square of the West Railway Station also added the first batch of 9 electric vehicle charging posts and 11 charging parking spaces. [19]

Passenger flow

At the beginning of opening in 2011, the maximum number of people gathered at Jinan West Station was 4000. [20]
On July 8, 2011, Jinan West Railway Station sent more than 10000 passengers per day for the first time. [6]
On February 16, 2012, Jinan West Railway Station experienced the first Spring Festival travel test, and sent nearly 800000 passengers. [7]
On July 8, 2013, Jinan West Railway Station sent more than 20000 passengers per day. [6]
On October 1, 2013, Jinan West Railway Station sent about 20000 passengers. [21]

Featured services

Announce
edit
  • Quanxin Posthouse
"Quanxin Posthouse" Service Sign of Jinan West Railway Station
The service carrier of "Quanxin Posthouse" includes three centers, two air platforms and one special area. Three centers: the passenger service center (located in the elevated waiting room, which is the command center of the station passenger transport service), the key passenger concern center (located in the elevated waiting room, which is the area to provide emergency assistance for passengers in need of help), and the volunteer service center (located in the urban corridor, which is the command center of the station youth volunteer service). Two air platforms: webmaster hotline and official microblog. These two special services are maintained by special personnel, providing real-time travel information, key passenger reservations, policy questions and answers and other services. One special area: VIP service area (located on the east side of the elevated waiting room, it is a special waiting area for business seat passengers, providing extended services such as wireless Internet access, travel reminder, travel consultation, etc.). [22]

Traffic transfer

Announce
edit

rail transit

Jinan West Station is set with rail transit stations, and the route is Jinan Rail Transit Line 1 [23]

bus

Passengers who change buses can go through the square underpass to the bus station. [24]
Train number
starting station
Terminus
Station at Jinan West Railway Station
First/last bus
remarks
Jinan West Station Bus Hub
zoo
Jinan West Station Bus Hub (1 platform)
05:30-00:00
-
Daming Lake
06:00-24:00
Daming Lake Railway Station
10:30-17:30
Jinan Station
Jinan West Station Bus Hub (2 platforms)
05:30-00:00
Dongbaliwa
06:00-00:00
Xiba Bus Yard
06:00-22:40
West of Quanfu Interchange
Jinan West Station Bus Hub (3 platforms)
05:10-00:00
Free transfer to other BRT lines
Bus station at Xinluo Street East Exit
05:30-00:00
The starting station of the upward departure is Liu Zhiyuan Village North
Jinan Bus Rapid Transit Line
Jinan Yaoqiang International Airport
09:30-20:30
Every hour, 25 yuan for the whole journey
Qingdao Road Bus Yard
Xiaoxinzhuang West Street, Jingshi Road North
Jinan West Railway Station
06:00-20:00
-
Fengshan Road Jingshi West Road
Jinan West Railway Station
06:30-21:30
Sent to Changqing University Town and Changqing Urban Area
Fangte Oriental God Painting
Dikou Road, Guanzaying New Street
05:40-21:00
-
Pengzhuang
provincial hospital
Jinan West Railway Station East Square
05:50-21:00
Provincial Cancer Hospital
Kuangshan Community
06:30-20:30
Western Wei Dynasty
Jinan West Station Bus Hub
Jinan West Station Bus Hub
06:00-21:00
reference material: [25] [27-30]

taxi

Go to the hall on the first floor through the exit channel. There are four taxi stops on the north and south sides of the hall, where passengers can queue up for taxis directly. [14] Taxis will pass through the special taxi underpass on the south side of the West Station, and will travel in one direction from east to west; At the same time, the taxi underpass on the north side is used as a special drop off channel, which adopts one-way driving from west to east. [26]