Collection
zero Useful+1
zero

Shanghai Hangzhou Ningbo Expressway

expressway
The Zhejiang section of Shanghai Hangzhou Ningbo Expressway is the first to be built in Zhejiang expressway , via Jiaxing Hangzhou Shaoxing Ningbo Four cities with a total length of 248 kilometers were completed and opened to traffic at the end of 1998.
On September 10, 2021, Keqiao Interchange Reconstruction and Expansion Project of Shanghai Hangzhou Ningbo Expressway was officially opened to traffic. [1]
On August 10, 2022, Linping Toll Station (Yingbin Road) and Linping Toll Station (Donghu Road) of Shanghai Hangzhou Expressway under the jurisdiction of Zhejiang Communications Group will be opened simultaneously, and the whole line of Linping section of Shanghai Hangzhou Expressway will be reopened [6] On September 28, Pengbu Bridge, the reconstruction project of Shanghai Hangzhou Ningbo Expressway, was officially opened to traffic. [11]
Chinese name
Shanghai Hangzhou Ningbo Expressway
Foreign name
Shanghai-Hangzhou-Ningbo Expressway
long
two hundred and forty-eight kilometre

development history

Announce
edit
The construction of Shanghai Hangzhou Ningbo Expressway was started in 1991, and was completed and put into use in sections since December 1995. The whole line was completed and opened to traffic at the end of 1998. Known as "Zhejiang First Road". It is not only the "golden channel" connecting Zhejiang with Shanghai, but also the "Ningbo - Zhoushan Port ”Shaoxing China Textile City The "main channel" for goods collection and distribution. Also distributed along the line Xiaoshan Haining Yuyao 2/3 of the national socio-economic integration in Zhejiang Top 100 counties (District).
The main line viaduct from Hangzhou Toll Station to Desheng Interchange Section of Shanghai Hangzhou Ningbo Expressway Hangzhou Urban Section Reconstruction Project will be put into trial operation from March 9, 2022 [5]
On September 28, 2022, Hangzhou's "East Gate" - Shanghai Hangzhou Ningbo Expressway (new) Xiaoshan Toll Station was officially opened to traffic. [10]
On January 19, 2024, Hangzhou Shaoxing Ningbo Section of Hangzhou Shaoxing Ningbo Expressway and Ningbo Section of Hangzhou Ningbo Double Track Expressway Phase I will be completed and opened to traffic. [13-14]
In February 2024, the driving of 18 steel casings for the main piers of Ningbo Section III Cross Port Area and Yongjiang Super Large Bridge Project of Hangzhou Ningbo Double Track Expressway was successfully completed. [15]

Widening project

Announce
edit
The widening project of Shanghai Hangzhou Ningbo Expressway will be implemented in three phases: the first phase is from Hongken to Hangzhou Ningbo Guzhu Section, with a total length of 44km, was completed and opened to traffic at the end of 2003; The second phase of the project is from Fengjing to Dajing in Shanghai and Hangzhou, with a total length of 95.612km, which was completed and opened to traffic at the end of 2005; The third phase project is from Hangyong to Guzhu Ningbo The total length of the section is 80.82 km, which was completed and opened to traffic on December 6, 2007, fulfilling the goal of the provincial government's widening project to open the whole line to traffic one year ahead of schedule.
The Shanghai Hangzhou Ningbo eight lane widening project is one of the infrastructure projects determined at the first governor's office meeting of the provincial government. It is also the first expressway in China to be widened and reconstructed in the way of "operation while construction" without interruption of traffic and diversion of vehicles.
With the increase of lanes, the traffic capacity has been greatly improved. The designed traffic flow can be increased from 50000 to 100000 vehicles per day. At the same time, Chang'an has also been added service area Tongxiang Interchange, Ningbo Ring Interchange Yuyao Xiaodong hub. Shanghai section of Shanghai Hangzhou Ningbo Expressway is also newly built at the junction of Shanghai and Zhejiang because it has six lanes Tingfeng Expressway Connection to divert the traffic flow of eight lanes in Zhejiang section of Shanghai Hangzhou Ningbo.
In the first phase of the widening project, a bay type parking strip was added, and an eight lane expressway was built using the six lane land already acquired, saving more than 600 mu of land; In the second and third phase widening projects, Changshan River Bridge and Yao Jiang Under the condition that the bridge does not affect the navigation and traffic, the left and right sides of the old bridge and the new bridge implement the flexible "demolition, three construction and three" scheme, which sets a good example in the construction of national highways.
In September 2022, the handover quality appraisal and handover acceptance of the entire elevated and ground roads (except the ground roads from Gaoxin 8th Road to Hongshiwu Section) of the reconstruction project of the Hangzhou urban section of Shanghai Hangzhou Ningbo Expressway will be completed, and the project is ready for traffic. [7]
On September 21, 2022, it was reported that the reconstruction project of Hangzhou urban section of Shanghai Hangzhou Ningbo Expressway had passed the handover and acceptance, and was expected to be officially opened to traffic at the end of September. [8]
On September 28, 2022, Xinpengbu Bridge in Hangzhou urban section of the important traffic guarantee project for the Hangzhou Asian Games and the reconstruction project of Shanghai Hangzhou Ningbo Expressway designed by China Railway Bridge Survey and Design Institute will be officially opened to traffic. [9]
In April 2023, with the completion of the handover quality assessment of the bridgehead and slow traffic system of the reconstruction project of the Hangzhou urban section of the Shanghai Hangzhou Ningbo Expressway (Qiaosi Toll Station to Qiantang River New Bridge Section), all the main works of the Shanghai Hangzhou Ningbo North Section have completed the handover quality assessment. [12]

Reconstruction works

Announce
edit
Airport Rail Express Joint Construction Section
On January 15, 2022, the reconstruction project of Hangzhou urban section of Shanghai Hangzhou Ningbo Expressway (the joint construction section of the airport track express line), highway and track viaducts will be completed. It has laid a solid foundation for the smooth opening of the whole line as scheduled. [4]

Service facilities

Announce
edit
Hangzhou-Ningbo Expressway There are 15 interworking entrances, exits and hubs, and 3 pairs of service areas:
region
mileage
S/N
name
connect
remarks
Zhejiang Expressway S2 (Hangzhou Section of Shanghai Hangzhou Ningbo Expressway)
zero
(1)
Pengbu Interchange
Genshan Road
-
9 km
(2)
Xiaoshan Interchange
G104
-
G92 South Section of Hangzhou Bay Ring Expressway
16 km
(3)
Hongken Hub
-
18 km
(4)
Airport interworking
S4 Hangzhou Airport Expressway
25 km
(5)
Guali Interchange
Qingdao Liupanshui Railway
-
34 km
(6)
Keqiao Interchange
Jinkeqiao Avenue
44 km
(7)
Shaoxing Interchange
Zhongxing Avenue
48 km
(8)
Shaoxing Service Area
-
-
Sun Rui Interchange
Hangzhou Shaoxing Taizhou Expressway
62 km
(9)
Guzhu Hub
G15 twenty-two Changtai Expressway
74 km
(10)
Shangyu Hub
G329
82 km
(11)
Moushan Hub
S319
95 km
(12)
Xiaodong Hub
96 km
(13)
Yaojiang Service Area
100 km
(14)
Yuyao Interchange
S213
-
(15)
Land port interconnection
S319
123 km
(16)
Dayin Interchange
S318
Hemudu
Ningbo City
129 km
(17)
Gaoqiao hub
-
Zhejiang Expressway S5( Hangzhou-Ningbo Expressway Ningbo Section)
-
-
-
-
-
Ningbo City
138 km
(18)
Airport interworking
Ningbo City
141 km
(19)
Ningbo Interchange
Huancheng West Road
Youngor Avenue
Duantang
Zhejiang Expressway S5( Branch chain of Ningbo Taizhou Wenzhou Expressway
-
-
-
-
-
Ningbo City
146 km
(20)
-
148 km
(21)
Ningbo Service Area
-
149 km
(22)
Ningbo East
Pan Fire
-
reference material: [2-3]