Collection
zero Useful+1
zero

Jincheng Xinxiang Expressway

Expressway in China
Jincheng Xinxiang Expressway, also known as Jinxin Expressway, China National Expressway Network No.: G55 twelve , Yes Erenhot Guangzhou Expressway (G55).
The main control points along the Jinxin Expressway are: Dongshangzhuang Flyover, Jincheng East Toll Gate , Danhe Toll Station (provincial boundary, to be demolished), Niulanghe Tunnel, Xinxiang G4 Beijing Hong Kong Macao Expressway Flyover.
Chinese name
Jincheng Xinxiang Expressway
Foreign name
Jincheng-Xinxiang Expressway
Alias
Jinxin Expressway
motorway number
National Highway G55 twelve
Shanxi Section
Passed
Henan Section
Passed
Total length
138 km
Passing regions
Jiaozuo, Jincheng Xinxiang
Nature
National Expressway - Connecting Line
Starting point
Shanxi Province Dongshangzhuang Interchange, Fengtai East Street, Zezhou County, Jincheng City
End
Interchange between Jinxin Expressway and Beijing Hong Kong Macao Expressway in Yuanyang County, Xinxiang City, Henan Province

Planning evolution

Announce
edit
On January 13, 2005, the former Ministry of Transport of the People's Republic of China (now the Ministry of Transport) issued the National Highway Network Planning (“ 7918 Project ”) , and stipulates National Highway The numbering rules of the trunk line, regional loop line and branch line are as follows. The branch line sequence has 37 connecting lines, including Jincheng Xinxiang Expressway (Jinxin Expressway), numbered "National Expressway G55 twelve [1]
On June 20, 2013, Ministry of Transport of the People's Republic of China The National Highway Network Planning (2013-2030) was issued, which is also called the "71118 Project", and the planning of Jinxin Expressway remains unchanged [2]
On September 7, 2017, the former General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (incorporated into the Ministry of Market Supervision and Administration) issued the Rules for Highway Route Identification and National Highway Number (GB/T 917-2017, replacing GB/T 917-2009), and the number of Jinxin Expressway remained unchanged [3]
In June 2019, Henan Province carried out the optimization and improvement of naming and numbering of national and provincial expressway networks. The original G5512 Jinxin Expressway is adjusted to G3511 Hebao Expressway, and S86 Yuanjiao Expressway is adjusted to G5512 Jinxin Expressway. [4]

Nomenclature history

Announce
edit

Old line of Jinxin Expressway

After June 20, 2013, according to the《 National highway network planning (2013-2030), Jinxin Expressway G55 twelve It is composed of four sections, namely, Jin Jiao Expressway, Jiao Jin Expressway, Jiao Zheng Expressway and Xin Jiao Expressway.
Old line of Jinxin Expressway
Provincial toll station Two: Danhe Toll Station and Henan Jinjie Toll Station.
Entrance and exit : Dongshangzhuang Interchange (K0, entering the urban area of Jincheng, connecting Fengtai East Street and 207 National Highway), Jincheng East Toll Station (K1.9, connecting to G55 Erguang Expressway), Danhe Toll Station (K9.8, main line, with exit connecting to Jinzhang Line), Henan Jinjie Toll Station (K47, main line), Jiaozuoxi Toll Station (K47.2, connecting to Jiaoke Road), Jiaozuodon Toll Station (K66.4), Xiuwu Toll Station (K82) Xiuwu East Toll Station (K88), Huojia Toll Station (K102.7), Xinxiang West Toll Station (K123.7), Xinxiang East Toll Station (K131.5), G4 Beijing Hong Kong Macao Expressway Flyover (K138, connected to G4 Beijing Hong Kong Macao Expressway).
service area: Jiaozuo service area (K52.1), Xiuwu parking area (K69.2), Huojia service area (K93.2), Fengquan parking area (K125).
High speed of connection: National Expressway G55 Erguang Expressway, National Expressway G4 Beijing Hong Kong Macao Expressway, Shanxi Expressway S86 Jinyang Expressway, Henan Expressway S49 Jiaowen Expressway, Henan Expressway S28 Jiaoji Expressway (turn right at Ningguo Interchange), Henan Expressway S86 Yuanjiao Expressway (go straight at Ningguo Interchange).
Special attention: 60 km of Jinxin Expressway Ningguo Interchange
When going to Xinxiang, Jincheng needs to make a left turn on the right and go straight to enter Henan S86 Yuanjiao Expressway, leading to Wuzhi County and Yuanyang County
When Xinxiang goes to Jincheng, it needs to turn right and go straight into Henan S28 Jiaoji Expressway leads to Boai, Qinyang and Jiyuan.

New Line of Jinxin Expressway

According to GBT 917-2017 Highway Route Identification Rules and National Highway Numbers published in 2017, Jinxin Expressway was changed from Jin Jiao Expressway, Jiao Jin Expressway and Jiao Zheng Expressway are all composed of three sections. (The original Xinjiao Expressway was incorporated into the G35 Heze Baoji Expressway eleven
New Line of Jinxin Expressway

Line interworking and facilities

Announce
edit
Overview of Jincheng Xinxiang Expressway Interchange (from west to east)
name
Region
remarks
Dongshangzhuang Interchange
Shanxi Province
Jincheng City
city proper
Fengtai East Street
Baishui East Street
Jinfeng Road
Jincheng East Hub
Zezhou County
Erenhot Guangzhou Expressway (National Highway G55)
Danhe Interchange
Taihang No.1 Road
Jiaozuo Northwest Hub (under construction)
Henan Province
Jiaozuo City
Middle station area
Along Taihang Mountain Expressway (Henan Expressway S33)
Jiaozuo West Interchange
Xinyuan Road
Jiaozuo Southwest Hub
Fengshou Road (Provincial Highway 308)
Jiaozuo Tanghe Expressway (Henan Expressway S49)
Ningguo Interchange
Shanyang District
Heze Baoji Expressway (National Highway G35 eleven
Jiaozuo Interchange
Yingbin Road (Provincial Highway 235)
Wuzhi Interchange
Wuzhi County
Hongqi Road (232 Provincial Highway)
Xiaoxugang Interchange
309 Provincial Highway
Xinglong Yangjiang Highway (National Highway 234)
Wuzhi Hub
Heying Hub (under construction)
Xinxiang City
Yuanyang County
Xinzhuang Interchange
Beijing Hong Kong Highway (National Highway 107)
Pingyuan New Area East Interchange
Zhengxin Avenue
Jiangzhuang Hub
Lankao Yuanyang Expressway (Henan Expressway S32)

Service facilities

Announce
edit
List of service facilities of Jincheng Xinxiang Expressway (from west to east)
name
Area
Jiaozuo Service Area
Henan Province
Jiaozuo City
Middle station area
Wuzhi Service Area
Wuzhi County

History of construction

Announce
edit

Construction history

Jinxin Expressway During the construction period, they were called Jinjiao Expressway, Jiaojin Expressway, Jiaozhouwan Zhengzhou Expressway and Xinjiao Expressway respectively.

Jincheng Jiaozuo Section

Shanxi Jiaozuo Expressway, namely Shanxi Jincheng To Henan Jiaozuo expressway. Jinjiao high speed The road starts from Dongshangzhuang, the intersection of Fengtai East Street and 207 National Highway in Jincheng City, and ends at Xiaoshang Village, Zhongzhan District, Jiaozuo City, with a total length of 48 kilometers. During the construction of Jinzhou Jiaozuo Expressway, it is the Shanxi section of Jinzhou Jiaozuo Expressway and the north section of Jiaozhou Zhengzhou Expressway in Henan section of Jiaozuo Jinzuo Expressway, with three sections approved for construction.
1. Jinjiao Expressway Shanxi Section Shanxi is called Jinjiao Expressway. The starting point is the Dongshangzhuang Flyover at the intersection of Fengtai East Street and National Highway 207 in the urban area of Jincheng City, and the ending point is located at the provincial boundary of Shanxi and Henan in Hanjiazhai Village, Liushukou Township, Zezhou County, Jincheng City, with a total length of 32 kilometers. It is a fully closed, fully overpass, and fully controlled four lane expressway. The construction of Shanxi section started on October 29, 1997.
On May 27, 1998, the signing ceremony for the investment of Jin Jiao Expressway was held in Taiyuan, with a total investment of 1.44 billion yuan, including 576 million yuan from Shanxi Province and 864 million yuan from Hong Kong New World Infrastructure Co., Ltd., with a cooperation period of 30 years;
April 18, 1999 Niulanghe Tunnel of Jinjiao Expressway The left line was successfully completed, with a total length of 3955 meters. It is the longest tunnel in North China, ranking second in the country;
On December 17, 2000, the Danhe Super Large Stone Arch Bridge on Shanxi Jiaozuo Expressway had a single span of 146 meters, which won the Guinness World Record. On April 23, 2001, Meng Fanrong, Deputy Commander in Chief of Shanxi Jiaozuo Expressway Project and Leader of Danhe Bridge Research Group, won the National Labor Medal of "May Day", went to Beijing to attend the meeting to receive the award, and Shanxi Section was completed. On May 11, 2002, a delegation led by Huang Zhendong, Minister of Communications, visited Jincheng section of Jinjiao Expressway.
On December 22, 2002, this section was officially opened to traffic with Henan section. A total of 11.22 million cubic meters of earthwork, 133000 cubic meters of retaining wall, 586000 square meters of pavement, a 413m long super major bridge, 14 2692 linear meters of major bridges, 6 509 linear meters of minor bridges, 59 culverts, 2258m long tunnels, 20 single track tunnels, 20783 linear meters in total, 2 interchanges, 2 separated interchanges, 8 channels, footbridge Six buildings are 222 meters long, and the total project investment is estimated to be 1.44 billion yuan.
2. Jinjiao Expressway Henan section, Henan is called Jiaozuo Jinzhou Expressway. The Jinyu Bridge, which starts at the end of Jinjiao Expressway at the junction of Henan and Shanxi, passes through four towns and townships, including Zhaihao, Longdong, Wangfeng and Zhucun in Jiaozuo Boai and Zhongzhan counties and districts, and ends at Xiaoshang Village in Jiaozuo City. It is connected with the proposed Jiaozuo Wenzhou Expressway, with a total length of 17.036 km, a relative height difference of 566 meters, and a two-way four lane road. The construction was officially started on June 26, 2000 and opened to traffic on December 22, 2002.
3. Jinjiao Expressway North Section of Jiaozhouwan Zhengzhou Expressway Jiaozuo Zhengzhou Expressway starts from Jiaozuo Jinzhou Expressway and Jiaozhou Wenzhou Expressway overpass in Xiaoshang Village, Zhongzhan District, Jiaozuo City, and ends on 107 National Highway 600 meters north of Xinzhuang Village, Yuanyang County. It is 55.8 kilometers long, with a total investment of 1.216 billion yuan. The design standard is a fully closed, full interchange two-way four lane plain hilly expressway. The construction was commenced on August 18, 1998. The first phase of the project was completed and opened to traffic on July 23, 2001, and the second phase was completed and opened to traffic on December 22, 2002. The north section of Jiaozuo Zhengzhou Expressway starts from Xiaoshang Village, Zhongzhan District, Jiaozuo City to Ningguo Interchange, about 10 kilometers into Jinxin Expressway.

Jiaozuo Xinxiang Section

  • Old line
The old line of Jiaozuo Xinxiang section of Jinxin Expressway is constructed by Xinxiang Jiaozuo Expressway project. Xinxiang Jiaozuo Expressway is an important part of Jincheng Xinxiang Expressway planned by the state and Changyuan Jiyuan Expressway planned by Henan Province. It is one of the main economic arteries in Henan Province. The project starts from Jiyuan, which has been completed and opened to traffic in the southwest of Jiaozuo City, in the west to the end of Jiaozuo Expressway, and ends at G4 in the east( Beijing Hong Kong Macao Expressway )It is connected, with a total length of 79.838km, a total estimated investment of 3.16 billion yuan, two-way six lane, a design driving speed of 120km/h, and a subgrade width of 28m. There are 2 super major bridges, 4 major bridges, 4 medium bridges, 62 separated interchanges and 7 interchanges along the line. The construction is divided into two sections. The whole section was completed and opened to traffic on September 6, 2007. [10] In June 2019, this section of expressway was adjusted from G5512 (Jinxin Expressway) to G3511 (Hebao Expressway). [4]
1. Jiaozuo Shanyang to Jiaozuo Xiuwu Section
This section of expressway connects the end point of the completed Jiyuan Jiaozuo Expressway (located in the southwest of Jiaozuo City) in the west, the junction of Jiaozuo City and Xinxiang City in the east, and the Huojia Xinxiang section of the Jincheng Xinxiang Expressway under construction. The route passes through Wuzhi and Xiuwu counties, with a total length of 29.48km. The road width is designed to be 28 meters, and it is arranged as a two-way six lane road. A pair of emergency parking bays are symmetrically arranged every kilometer, and the design driving speed is 120 km/h.
2. Huojia Xinxiang Hongqi Xinxiang Section
Xinxiang Jiaozuo Expressway Project will be constructed in this section of expressway. Xinxiang Jiaozuo Expressway is one of the "five vertical, four horizontal and four channels" in Henan Province's expressway network planning Changji Expressway It is also an important part of the national planned Jin Xin Expressway, and an important channel connecting Da Guang, Er Guang, Zheng Jiao Jin, Beijing Hong Kong Macao Expressway. The route starts 2km northwest of Huangdi Town, Huojia County, Xinxiang City in the west, the junction of Xinxiang City and Jiaozuo City, and ends at Hongqi District, Xinxiang City in the east Beijing Zhuhai Expressway The overpass is 50.358 kilometers long, with six lanes in both directions, a design speed of 120 kilometers per hour, a subgrade width of 28 meters, and a total estimated investment of 2.57 billion yuan. There are 2 super major bridges, 3 major bridges, 42 separated overpasses and 4 interchanges along the line. [9]
  • New line
1. Jiaozuo Middle Station to Xinxiang Yuanyang Xinzhuang Section
The Jiaozuo Zhengzhou Expressway Project will be constructed in this section of expressway. Jiaozuo Zhengzhou Expressway is the first expressway in Henan Province that is self funded, self built and self managed by the local government, approved by the National Planning Commission. This section starts from Xinji Highway 800 meters east of Xiaoshang Village, Zhongzhan District, Jiaozuo City in the west and ends 600 meters north of Xinzhuang Village, Zhulou Township, Yuanyang County, Xinxiang City in the east National Highway 107 The total length is 55.8km, the total width of the subgrade is 26m, the total investment of the project is 1.216 billion yuan, and the design standard is a fully closed, fully overpass, two-way four lane expressway. This section of expressway was completed and opened to traffic on July 19, 2001. [6-7] In December 2009, the section from Xiaoshang Village, Jiaozuo Zhongzhan District, Jiaozuo City to Ningguo Hub, Shanyang District of Jiaozuo Zhengzhou Expressway was included in G5512 (Jinxin Expressway) for about 10 kilometers, and the rest of the section was included in S86 (Yuanyang Jiaozuo Expressway). [8] In June 2019, the original coke speed of S86 was adjusted to G5512 (Jinxin Expressway). [4]
2. Xinxiang Yuanyang Xinzhuang Xinxiang Yuanyang Section
The Yuanyang Xinzhuang Expressway Project will be constructed in this section of expressway. The project starts from Xinzhuang Jiaozuo Expressway of Xinxiang Jincheng Branch of Taiyuan Aomen National Key Trunk Highway in the west and ends at Yuanyang County of Xinxiang Zhengzhou Expressway of Beijing Zhuhai National Trunk Highway in the east. The total length of the project is 12.8km, and the design driving speed is 120km/h. The total investment of the project is 425.78 million yuan. The construction of this section of expressway started in August 2002 and lasted 28 months. It was completed and opened to traffic on December 16, 2004. [5] In December 2009, this section of expressway was included in S86 (Yuanyang Jiaozuo Expressway). [8] In June 2019, the original coke speed of S86 was adjusted to G5512 (Jinxin Expressway). [4]