Construction site

Architectural terminology
Collection
zero Useful+1
zero
Construction site refers to industrial and civil projects Housing construction , civil engineering, equipment installation Pipeline laying and other construction activities shall be carried out on the construction site and people approved to occupy Safe production Places for civilized work and construction, including land, sea and air areas where construction can be carried out. The project manager is fully responsible for Construction process Of Site management The construction site shall be established according to the project scale, technical complexity and specific conditions of the construction site Management responsibility And organize the implementation.
Chinese name
Construction site
Foreign name
Construction Site
Alias
construction site
The term belongs to
Architectural terminology

Site management

Announce
edit

Technical issues

As a Project Especially for decoration works, the construction process is complex, the materials are various, and there are many construction teams. This requires us, as the on-site construction management personnel, to make technical preparations. First, we must be familiar with the construction drawings construction contract It is required to optimize each process and each sub divisional (sub divisional) project to the greatest extent, and consider its own resources (construction team, material supply, funds, equipment, etc.), climate, etc natural condition , conscientiously and reasonably carry out the construction Organizational plan , and Bar chart or network diagram Show, from big to small, from face to point, to ensure that every Subdivisional works Can be included in the controlled range. Secondly, according to the characteristics of the project, in addition to the reasonable construction organization plan, technical preparations must be made on the specific construction process, especially the construction process required by high-tech requirements.
Technical reserve Including technical management personnel, technical foremen and workers, new technology and new process training, Construction specifications , technical disclosure and other work. Only with high-quality technical management personnel and a thorough understanding of the specific construction process can we ensure that each process step in the construction process is mastered, clear in mind, and prepare for handling emergencies in all aspects to ensure that it can be completed on time and with high quality. Through planned and purposeful training and technical disclosure, construction technicians and foremen can be familiar with new construction technology and new material characteristics, and jointly improve technical operation and construction level to ensure construction quality. Moreover, from a technical perspective, whether the construction quality problems meet the relevant design requirements and relevant specifications and standards, It is not enough to make strict requirements only from each process in the construction process, and corresponding quality must be provided Inspection system The establishment of a sound quality inspection system and means must be scientifically demonstrated. Therefore, technical reserves must be made, and different quality must be proposed for each process and each construction process Acceptance criteria To ensure project quality.

Material problems

be relative to civil construction Decoration engineering has its inherent characteristics. The main aspect is that it needs a wide range of materials, and there are often many problems in the application of the latest materials. Therefore, the following problems of materials must be solved.
① . Material supply. Cooperate with the designer to determine the brand, material and specification of the required materials, carefully calculate the quantity of the required materials, and organize the material supplier to supply.
② Material procurement, facing a wide range of materials Purchase Order The quantity (including the actual loss), brand, specification, place of origin, etc. must be clearly identified one by one, and the size, material, template, etc. must be in place at one time to avoid inconsistent ordering of materials, which will affect the project progress.
③、 Material classification Stacking. Reasonably arrange the mobilization of materials according to the actual site conditions and progress Site acceptance , sampling and reporting to Party A, the design unit. Sort out and classify according to the construction organization Layout plan The designated locations are classified and stacked in different sites.
④ Material distribution. Use tracking and check. For the materials arriving at the site, check and register them, and strictly follow the construction progress Outbound order Release and use, and track the released materials to avoid material loss or waste. In particular, the section blanking shall be strictly controlled. For materials Inventory Warehouse keeper Make sure to sort out the inventory in a timely manner, and pay attention to the classified stacking of all materials. Flammables and moisture-proof materials need to take corresponding material protection measures.

Construction problems

The key to construction is progress and quality. In principle, the progress shall be implemented according to the original construction organization plan. However, as a project, the site conditions are ever-changing, such as material supply, design changes, etc., which are inevitable and cannot be modeled, and must be adjusted and arranged according to the actual situation. Whether the construction quality can be guaranteed or not, the most important thing is to complete each process in strict accordance with the requirements of relevant national specifications and standards, and it is strictly prohibited to cut corners. Must be implemented“ Three inspections ”System, that is, self inspection, special inspection and joint inspection. The next process is allowed to enter after acceptance after passing the inspection layer by layer, so as to ensure the quality of the whole project. [1]

Personnel issues

In a sense, people are the key to the success of the project. All engineering projects are created through the organization of materials by people. Only a creative and disciplined construction team can complete a high-quality project. How can the technical management personnel and technical workers in the construction team be organically combined into a guard force? First of all, an atmosphere of sharing weal and woe must be created, with clear responsibilities but no loss of affinity, so that all employees feel that they are part of the project big family A member of. This requires our construction site management personnel to give full play to their talents, clearly define rewards and punishments for workers, encourage and hold various production and life competitions, and cultivate both spiritually and materially cohesive force Secondly, the construction team's management system , each Post responsibilities The right is clear and the order must be followed. A construction team with strict discipline can complete the construction task on schedule and with high quality only by resolutely obeying the command in the face of tight schedule and complex technology. Moreover, it should be used appropriately according to specific circumstances economic levers Means, right Personnel management It must play an unexpected role.

Information problems

In addition to the management identification of materials, construction, technology and personnel, there are Not to be ignored The problem is data management. The acceptance of any project must include completion data. Material certificates included in the completion data Inspection report As built drawing Acceptance report, design change, measurement record, concealed work acceptance form, relevant technical parameter measurement acceptance form, work Contact Letter Project visa We are required to pay attention to collecting, classifying and archiving in the whole project construction process. In case of any omission Completion acceptance And project settlement bring unnecessary losses, and some impacts are incalculable.

Protection issues

According to the characteristics of decoration engineering, Finished product protection It can be said that it is very important. As the last process, any small damage will destroy the aesthetic feeling and affect acceptance of work For the protection of finished products, a combination of active and passive measures must be taken. The so-called initiative refers to the adoption of relevant mandatory prevention systems, such as the provision that no iron ladder is allowed to be used on the ground of finished products, and the so-called passive refers to the adoption of relevant anti-collision and other means to protect finished products, such as covering glass and other fragile products Plywood And other measures. In a word, we must talk about the protection of finished products every day, pay attention to it every day, pay more attention to it, strengthen the awareness of product protection, and improve the awareness of workers.

safety problem

It is mainly related to the construction safety issues such as fire prevention, no random splicing of wires, wearing helmets, scaffolding erection, safety belts, etc., which need to set up a special safety team to catch up every day, talk every day, train and learn more, and prevent problems before they happen. [2]

Management Elements

Announce
edit
It is mainly about fire prevention, no random splicing of wires, wearing helmets Scaffolding Corresponding construction such as erection and use of safety belt safety problem It is necessary to set up a special safety team to focus on, talk about, train and learn more to prevent problems before they occur. to make a long story short, Construction project Of Site management It is a systematic project, involving all levels of enterprise management and every operator on the construction site, plus Construction products production Long cycle , outside influence factor It is difficult to manage the site due to its multiple characteristics. Therefore, construction enterprises must use Modern management To formulate the construction site of the enterprise Management standards scientific management Institutionalized management Only in this way can we ensure the continuous improvement of enterprise management level and an invincible position in the fierce market competition.
Material management
The project started Before, submit it to the material department of the enterprise One time plan , as the basis for material preparation. During construction, according to the construction materials of the project Consumption quota and Engineering change And adjusted Construction budget And timely propose to the material department of the construction enterprise to adjust the material supply plan, so as to ensure that the materials are supplied according to the actual demand. Materials entering the construction site must be Feed Plan, material supply voucher Product certificate Acceptance of material quantity and quality shall be carried out in strict accordance with the acceptance specifications and Metrological testing After the acceptance, the materials shall be recorded in detail and the eye acceptance procedures shall be handled. The materials entering the site need to be accepted into the warehouse, and the materials stacked on the site should be well protected against fire, moisture and deterioration. The safe storage of materials shall be specifically implemented to individuals, and the principle that whoever keeps the materials shall be responsible and whoever loses the materials shall be compensated shall be followed. Materials for construction facilities shall be obtained according to the project quota material plan. For materials exceeding the quota, corresponding procedures shall be handled. The reason for excessive consumption shall be noted when filling in the material requisition. The supplier shall check the quota or excess Quota picking list Perform protection and accounting. Whether the person in charge of site management determines whether the materials used in the construction process Reasonable use Whether the material disclosure and engineering change procedures are carried out according to the regulations, and whether the materials are stacked according to the specified drawings. The team materials must be recycled, and the material return procedures shall be handled in time. The material management department shall prepare a table and report it.
Self inspection, mutual inspection and full-time inspection of on-site production workers are generally adopted for project quality inspection Inspectors Combination method, which is based on national or departmental measures Construction acceptance And acceptance specifications engineering construction technology Operating specifications Project quality inspection and evaluation standards. From raw material mobilization Construction unit The whole process from the production of process components to the completion of the project must be subject to quality inspection during the on-site project construction.
Carefully do a good job in the safety, materials and quality of the construction site Three major management In order to ensure the safety of the project, ensure the safety of the construction personnel, and better complete more and larger projects.

System details

Announce
edit

Attendance system

1. All staff on the project site must be on time every day. Fingerprint punching After the commencement of the project, working hours Nine hours.
2. When the staff goes out to perform tasks, they need to ask the project manager for instructions and fill in field personnel Task list , can go out only after being approved.
3. The project manager shall report to the deputy general manager in charge when going out.
4、 sick leave A sick leave certificate is required.
5. Personal leave shall be applied to the project manager and filled in written request for leave , approved by the project manager within one day, approved by the deputy general manager in charge within two days, and approved by the chairman more than three days. You can take a rest only after being granted leave. And send Administration Department keep on record.
6. When overtime work is required due to project progress, all staff must obey. The project manager shall fill in the overtime application form. personnel Overtime pay In addition, the project manager will not be paid overtime. The staff cannot complete their work on time due to their own reasons Task If overtime is required, overtime pay will not be counted.
7. Those who are absent from work for three times without reason or for three consecutive days shall be expelled.

Regular meeting system

1. It shall be held once a day from the commencement date to the completion date of the project Meeting
2. Daily Regular meetings The meeting shall be convened by relevant project managers, and attended by constructors, maintenance team leaders and construction team leaders. The records of the engineering secretary shall be filed. The project manager can expand the scope of participants in regular meetings according to specific problems.
3. The problems found in the construction must be submitted to the regular meeting for discussion and reported to the deputy general manager in charge for approval. Decisions made in regular meetings must be resolutely implemented.
4. The coordination problems between teams shall be submitted to the daily meeting for solution. In the regular meeting, the relevant operation requirements and the latest project trends shall be conveyed in time.
5. The weekly regular meeting is convened by the deputy general manager in charge, and the project manager Budgeter The Marketing Manager shall participate and the Engineering Secretary shall record and file. The deputy general manager in charge can expand the scope of participants according to specific problems.
6. Each Production department Submission of coordination problems between Party A and Party B Weekly meeting solve. The regular meeting conveys the latest project trends, latest company documents and spirit of the company.

file management

1. The project secretary should be strict Urban construction archives management It is required to do a good job in data archiving.
2. Keep records of daily and weekly regular meetings on the construction site. Temporary site minutes of the meeting
3. Site staff shall be registered. Construction team members ID copy Organize and archive
4. In project Quantities Visa form, project assignment Design change The construction drawings and project self inspection data shall be sorted and filed.
5. Sort out and archive other documents, data and documents in the project.
6. All kinds of archives shall be kept by category, backed up, and shall not be lost. At the same time, establish relevant Electronic documents , convenient for reference.
7. Borrowing procedures are required for borrowing archives. fill in Engineering data Borrow the form and return it in time.

Warehouse management

1. The materials must be accepted and signed by the project manager before they are put into storage. Unqualified materials will never be put into storage, Materialman Return procedures must be handled in time.
2、 Keeper Any materials must be counted before they can be put into storage and recorded into the account. Fill in materials Receipt Doc At the same time, enter the electronic document for future reference.
3. The material account book must have such columns as date, quantity in warehouse, quantity out of warehouse, receiver, storage location, etc.
4. The materials in the warehouse shall be stored and stacked neatly and orderly by category Identity management Sufficient passages shall be reserved for easy handling.
5. Storage of flammable, explosive and toxic materials such as paint, alcohol and pesticide Dangerous goods warehouse And equipped with enough Fire Equipment Open fire is not allowed.
6. For bulk materials and equipment that cannot be warehoused, the quantity shall be cleared, and the covering work shall be done to prevent rain and sun exposure and loss.
7. The materials stored in the warehouse must be well protected against fire and moisture. No unauthorized personnel are allowed to enter the warehouse.
8. Material issue must be filled in Material requisition , signed and approved by the project manager, and signed by the receiver.
9. For borrowing tools and equipment, establish a borrowing goods account. Strictly perform the borrowing procedures, and timely urge the warehousing. The principle of "whoever takes the goods shall take care of them" shall be implemented. In case of any damage, the materialman shall be notified in time to contact for maintenance or replacement.

Civilized construction

1. Smoking is not allowed during construction.
2. Temporary toilets must be used for urination and defecation at the construction site. The temporary toilet shall be cleaned at any time after use.
3. Materials, components and other items shall be classified and stacked neatly. Collect materials, transport earthwork, sand and gravel, etc., and do not clean and maintain them along the way.
4. The garbage generated during the construction must be sorted into piles and cleared away in time. The materials shall be cleared after completion of work.
5. The on-site construction personnel must keep their clothes clean. Do not wear slippers or go to work naked.
6、 work shed Must be kept clean and tidy, and cleaned by turns, domestic garbage Production wastes shall be removed in time.
7. Unite with comrades, care for others, and do not work after drinking, Alcoholism Make trouble, fight, form a gang, use vicious words to hurt people, and do not work hard.
8. The noise of construction machinery shall be strictly controlled to minimize disturbance to residents.

Safe production

1. New workers entering the site, moral acceptance“ Safe production Tertiary education ”。
2. Personnel entering the construction site shall wear well safety hat Personal protective equipment must be used correctly. as Safety belt Etc.
2. The site construction personnel must correctly use the relevant machinery and equipment. Check everything before going on duty Safety facilities Whether it is safe and reliable.
3、 Special type of work Work with certificate, Special operation Wear corresponding labor safeguard articles.
4. Using Grinding machine First, check whether the grinding wheel is cracked or dangerous. When cutting materials, the force shall be even, and the parts to be cut shall be clamped firmly.
5. When working at heights, fasten the safety belt. It is strictly prohibited to walk on the climbing objects without handrails in the high altitude.
6. The slope of deep trench construction shall be stable, and the reinforcement measures for retaining wall shall be improved in time.
7. The edge of the dangerous part, Pithead Guard, cover and set necessary safety Warning light
8. Set up sufficient access roads as required, Horseway And safety ladder.
9. Loading, unloading and stacking materials, equipment and construction vehicles, and Pit keep safe distance
10. Large and medium-sized construction machinery (hoisting, transportation, rolling, etc.) shall be commanded by full-time personnel.
11. Small and Electric tool It shall be operated and used by full-time personnel. Pay attention to electricity safety.
12. The construction personnel must observe the safe construction Rules and regulations Have the right to refuse to violate "safety Construction management system ”Operation method of.
13. Safety construction signs shall be hung on the construction site.

Temporary electricity

1. Owned by the construction site Temporary electricity Professional electricians (working with certificates) are responsible for, Other personnel It is forbidden to connect the power supply.
2. Each level of the construction site must be equipped with various types of safety Power Distribution Box
3. Temporary power supply, implementation Three phase five wire System and Level III Leakage protection Full time electricians shall carry out inspection and maintenance.
4. All Temporary line Must use Sheathed wire Or submarine line. It must be firmly erected, generally overhead, and not tied to pipes or metal objects.
5. It is forbidden to use fancy wire or copper Core wire Violators will be severely punished.
6. All plugs and sockets shall be kept intact. The electrical switch cannot be used for multiple purposes.
7. All construction machinery and electrical equipment shall not be operated with faults or overloaded.
8. Construction machinery, electrical equipment and metal platform for construction must be reliably grounded.
9. Cut off the power supply before connecting to the power supply. if Live working , must take Protective measures And the work can only be carried out under the supervision of electricians above the third level.

Security management

1、 Security personnel They must be loyal to their duties, stick to their posts and patrol around the clock. Protect the property on the construction site from loss.
2. The project manager shall set Compliance with standards Fence, fence, etc. Closed construction shall be carried out as far as possible.
3. The project manager shall conduct safety inspection on raw materials, finished products and semi-finished products in the open air, and add safety protection facilities if necessary. Or assign special personnel to guard.
4. All construction personnel must wear number plate The external personnel shall not enter the construction site without the permission of the project manager.
5. The security personnel on duty at night must patrol the whole construction area and shall not sleep.
6. Security personnel shall pay close attention to raw materials, finished and semi-finished products, machines, tools and equipment, etc. during site inspection. Report to the company in time in case of any abnormality.
7. All equipment and tools brought by the construction team shall be registered, and the registration list shall be kept by the project secretary. For reference by relevant personnel.
8. When the construction team leaves the site, the tools and equipment carried must be Project Management Department Can be brought out only with the approval of.

Fire management

1. Each level of the construction site must be equipped with sufficient fire-fighting equipment.
2. The security personnel must check the integrity of the fire-fighting equipment every day, and timely supplement if there is any loss.
3. The place where fire-fighting equipment is placed must be clearly marked.
4. The location of fire-fighting equipment shall be convenient for use, and the placement of fire-fighting equipment shall not be changed at will.
5. The staff must be familiar with the use of fire-fighting equipment.
6. Paints, etc Flammable Stored in dangerous goods warehouse. painter Avoid fire and heat sources during construction.
7. All places where open fire is used on the construction site must be guarded by a specially assigned person to extinguish the fire.
8. Keep the fire road unobstructed Fire Alarm Organize personnel to extinguish the fire immediately and report to the fire department if necessary.
9. The erection of temporary work shed and other facilities shall meet the requirements of anti-theft and fire prevention. Regularly carry out anti-theft and fire prevention education, and regularly check to eliminate hidden dangers in time.

cost control

1. Implementation Cost assessment system
1.1 The project manager shall first sign a letter of responsibility with the superior leader to clarify his own work Construction process Responsibilities in different situations. While clarifying responsibilities, determine responsibility cost (Responsibility cost refers to the cost that should be borne by the responsible person according to the controllable degree of the responsible person). Within the scope of responsibility cost, if the cost is artificially over consumed, it depends on the specific situation percentage Deduct the bonus of the project manager; If the cost loss is lower than Cost Forecast Plan is engineering cost If it is reduced, the project manager will be rewarded once by percentage.
one point two cost control The target is decomposed layer by layer, the responsibility letter is signed layer by layer, and economic interest To strengthen the economic awareness of all staff. The responsibility statement can be put on the wall to remind members of the engineering department at all times.
1.3 Specific assessment measures: an assessment team can be set up within the Engineering Department to discuss the assessment after each process is completed according to the completion of the responsibility cost of members in the Engineering Department. Within the scope of their respective responsibility costs, 2% of the saved costs will be rewarded to relevant personnel as a bonus. If the cost is over consumed and is artificially over consumed, the bonus will be deducted by 1% of the over consumed cost.
1.4 Make project cost prediction and plan before construction.
1.5 Regular call cost analysis meeting. The main analysis contents are:
① Site Completed Quantities, which have been signed by the Supervisor.
② Labor consumption and cost, daily labor plan for the next week.
③ Material consumption Transportation expenses Revolving materials , repair and recycling, material saving and excess situation and reasons, the type and quantity of materials needed in the next week. ④ Machinery cost Amount incurred , Repair Depreciation expense , the type and quantity of machinery needed in the next week.
⑤ Put forward rectification measures for cost control.
2. Strengthen material management and use
[3]
3.1 Before construction, not only Construction schedule The labor plan for each process should also be worked out according to the construction schedule, and calculated according to the labor plan Labor cost Discuss this employment plan with the person in charge of the migrant workers before the commencement, so that the person in charge of the migrant workers knows well.
3.2 The project manager shall draw up in advance the employment plan of migrant workers for each process Cost objectives And submit it to the superior for review. Inform the deputy general manager of production of the labor allocation plan according to the cost target of migrant workers. After the completion of the project, if the labor cost is reduced on the basis of the previously formulated goal, 1% of the saved funds will be awarded to the relevant personnel.
3.3 After the commencement of the project, strictly control the labor quota, attendance rate, overtime and other issues; Timely discover and solve the unreasonable personnel arrangement, Dispatch Inappropriate, tight and loose, slowdown, shutdown and other problems. The number of migrant workers appointed by the construction workers every morning should be basically consistent with the employment plan ctv More migrant workers will be employed in specific situations. In this way, the idle situation of migrant workers can be avoided to a certain extent, and the Labor cost
3.4 During the construction process, the construction team leader's Sense of responsibility To directly negotiate with the team leader on the deployment of migrant workers, accountability and other issues.
3.5 Before construction, sign the responsibility letter and contract with the team leader to clarify the responsibility. Hard landscape The project can adopt the method that each construction process is contracted by the team: to ensure the construction quality Construction progress On the premise of, determine the construction period, quality Labor quantity The construction is contracted by migrant workers in sections. This can be avoided to some extent construction management Many troubles in the project have reduced the workload of project managers and construction workers, and also achieved the goal of reducing labor costs.
3.6 The specific labor cost assessment criteria shall first adopt the above management style After the completion of the project, compare the cost and Contract cost , analyze the floating amount. It is convenient to adjust reasonable labor cost quota.
3.7 The personnel of the Engineering Department should also be reasonably allocated and management strengthened. stay Engineering Manager While submitting the project contracting responsibility statement to the superior leaders Manager of Engineering Department Propose Engineering Department Staffing According to the plan, on the premise of not affecting the construction progress and meeting the construction quality, the manager of the Engineering Department shall arrange the members of the Engineering Department by himself. Special posts must be in the charge of special personnel, and other posts can have more than one person if conditions permit
3.8 Introduction within the Engineering Department competition mechanism , written by the person in charge of each post regularly Work summary Submit to the project manager.
3.9 Regularly hold some small group activities to enhance the feelings among members of the Engineering Department, and exercise their team spirit so that everyone can better understand each other, so as to better cooperate and cooperate in work and complete work with high quality and efficiency.
4. Use and management of machinery
4.1 The construction personnel shall record the use of all machinery every day. Electricians shall timely repair and maintain the machinery.
4.2 For important machinery used in important processes, the project manager shall propose the type, quantity and Machine shift Number.
4.3 Large machinery must be commanded by specially assigned person, Prior control Total number of machine shifts. Assign daily machine shift quota.

Quality Assurance

1. The project manager must carry out every process Technical quality disclose.
2. Constructors must firmly grasp the technological process And construction technology quality requirement
3. Yes Landscape art Be meticulous, keep improving and respect natural law , close to nature, to achieve realistic effect.
4. Earnestly prepare for the early stage of the project and prepare feasible Construction organization design Formulate corresponding construction plan And organize technical innovation to ensure the feasibility and progressiveness
5. Preparation of construction technology
On the basis of being familiar with the construction drawings, summarize the problems in the drawings, put forward specific correction plans in combination with the construction characteristics of the company, and report first party and Designer Discuss together to reach an agreement, so that the problems can be solved to the maximum extent before entering the site for construction.
6. Strictly check and accept raw materials. Unqualified raw materials shall not be used.
7. Ensure the relative stability of skilled workers. Rewards will be given to skilled workers who are particularly skilled. At the same time, unqualified migrant workers will be eliminated.
8. Construction technology is the key to determine the quality of the project. Good technology can enable operators to achieve twice the result with half the effort in the construction process. To ensure the advancement and rationality The company arranges special personnel to test the immature process, and compiles the mature process into Operation Instructions And distributed to each construction worker. The construction worker shall make a written disclosure to the workers based on this when guiding production on the site, and Foreman Sign for acceptance. Process disclosure includes preparation of tools and materials, key points of construction technology, quality requirements and inspection methods, common problems and preventive measure During construction, the disclosure shall be made first and then the construction shall be carried out strictly technological requirements
9. Strengthening Special inspection Timely solve problems.
9.1 Carry out self inspection and mutual inspection activities to train operators Quality awareness After the completion of each process, the team leader shall organize the team members to carry out self inspection and mutual inspection of this process, and the self inspection basis and methods shall be strictly implemented Technical disclosure The problems found in the self inspection shall be handled by the team itself and the self inspection record shall be filled in. The self inspection record of the team shall be filled in completely. The problems found in the self inspection can be accepted by the construction personnel only after they have been corrected.
9.2 Carefully carry out process handover activities. After the completion of the previous process and before the construction of the next process, the construction workers shall organize the construction team leaders of the previous and next processes to carry out Handover inspection , the team leader of the next process will check the previous process Process quality Put forward opinions on the quality problems that affect this process, fill in the handover inspection records, and the construction personnel shall urge the personnel of the previous process to make corrections before the personnel of the next process can carry out construction. Completely eradicate Nonconforming products The exists of.
nine point three Full time inspection Distinguish responsibilities. On the basis of the self inspection of the team, the construction workers shall inspect each process of each team leader, strictly enforce the requirements, and immediately deal with the unqualified ones. During the inspection, it is necessary to distinguish the reason for the unqualified ones, whether it is caused by workers' operation, or construction materials or Construction method Non conformity caused by. After finding out the causes, corrective measures and corresponding preventive measures shall be formulated for the problems that occur repeatedly to prevent similar problems from happening again. For nonconformities caused by workers' operation, punishment measures shall be taken according to the severity of the situation, and the reasons for punishment shall be explained to the operators in time.
9.4 Conduct regular spot checks, summarize and improve. Check the engineering quality of each project regularly, classify the problems found regularly and hold regular meetings quality analysis Yes, organize construction management personnel to problem analysis Summarize, formulate corrective and preventive measures for special projects, and implement them. Make the construction management personnel improve their level in the process of constantly solving problems.
9.5 Conduct internal acceptance. After the completion of the project, the Landscape Engineering Department Marketing Department The Administration Department shall carry out a comprehensive acceptance inspection of the project. For the problems found, the Project Manager shall be notified in writing to rectify in time. If necessary, a second internal inspection shall be carried out. Only after the internal acceptance is passed, the project can be delivered to Party A for acceptance. So as to ensure one-time acceptance
Following the above construction management system during construction can be more powerful and sound Quality assurance system and Safety production responsibility System, clear all relevant Engineering personnel To strictly control the quality of the project and reasonably deal with the quality and progress, quality and economic performance To establish brand engineering awareness and ensure that all projects achieve High quality project