Tianjin Shijiazhuang Expressway Shijiazhuang Expressway), It is called "Tianjin Shijiazhuang Expressway" for short. It is an expressway connecting Tianjin and Shijiazhuang in Hebei Province in China China National Expressway Network Beijing Shanghai Expressway (National Highway G2) One of the tie lines of [21]
Tianjin Shijiazhuang Expressway starts from the east Tianjin Binhai New Area Nangang Industrial Park Interchange, ending in the west Shijiazhuang City Zhengding County Jiaojiaopu junction, 296.895km long [22]
Chinese name
Tianjin Shijiazhuang Expressway
Foreign name
Tianjin Shijiazhuang Expressway
Alias
Tianjin Shijiazhuang Expressway
Starting point
Tianjin Binhai New Area Nangang Industrial Zone Interchange
End
Jiaojiaopu Hub, Zhengding County, Shijiazhuang City
Total length
296.895km (Data of Ministry of Transport in 2017)
No
National Expressway G02 eleven

Historical evolution

Announce
edit

pre-planning

On January 30, 2008, the first edition of Shijiazhuang Daily published the report "Shijiazhuang Tianjin Expressway is expected to open". At that time, the proposed expressway was Tianjin Shijiazhuang Expressway, but the plan has not been implemented. Until“ Beiing-Tianin-Hebei integration ”The strategy proposed that the expressway construction in this plan began to speed up.
On June 20, 2013, the Ministry of Transport of the People's Republic of China issued the National Highway Network Planning (2013-2030), which is also called the "71118 Project". On the basis of the "7918 Project", several connecting lines were added, including Tianjin Shijiazhuang Expressway (referred to as "Tianjin Shijiazhuang Expressway"), numbered "National Expressway G0211" [3]
On February 26, 2014, the General Secretary of the CPC Central Committee president Chairman of the Central Military Commission Xi Jinping When listening to the special report on the coordinated development of Beijing, Tianjin and Hebei, it was emphasized that we should focus on building a modern transportation network system, take transportation integration as the leading field, and accelerate the construction of a fast, convenient, efficient, safe, high-capacity, low-cost, interconnected and integrated transportation network. Since then, the three provinces and cities of Beijing Tianjin Hebei have cooperated with the National Development and Reform Commission and the Ministry of Communications Integrated Transport Planning for the Coordinated Development of Beijing, Tianjin and Hebei , proposed“ Beiing-Tianin-Hebei integration And traffic first ". The three cities will build a fast, convenient, efficient, safe, high-capacity and low-cost interconnected comprehensive transportation network in accordance with the requirements of "planning with the same map, construction synchronization, transportation integration and management coordination". In the future, "one hour commuting circle" will be formed between Beijing and Tianjin, and "two hour commuting circle" will be formed between major cities in Beijing, Tianjin and Hebei. The construction of Tianjin Shijiazhuang Expressway was started under this policy; On October 15, Shijiazhuang Transportation Bureau released the First Publicity of EIA Information Announcement of Shijiazhuang Section of Tianjin Shijiazhuang Expressway on its website.
On August 6, 2015, Shijiazhuang Transportation Bureau released the Second Publicity of EIA Information Announcement on its website; On October 28, the Public Bidding Announcement of Government and Social Capital Cooperation (ppp) Project for Xifu, Pingzang, Shiheng and Tianjin Shijiazhuang Freeways was issued; On November 26, the Bidding Announcement for Engineering Survey and Design of Tianjin Hebei Boundary Baoshi Boundary Section of Tianjin Shijiazhuang Expressway was issued; On December 21, the Publicity of Successful Candidates for Engineering Survey and Design Bidding for Tianjin Hebei Section of Tianjin Shijiazhuang Expressway to Baoshi Section was released.
According to the news on August 24, 2017, the construction of Tianjin Shijiazhuang Expressway started in August [17] On September 7, the former General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (incorporated into the Market Supervision and Administration Department) issued the Rules for Highway Route Identification and National Highway Number (GB/T 917-2017, replacing GB/T 917-2009), and the number of Tianjin Shijiazhuang Expressway remains unchanged [1]
On January 25, 2016, Shijiazhuang Transportation Bureau Release the Publicity of Successful Candidates for Public Bidding of Government and Social Capital Cooperation (ppp) Project of Shijiazhuang Section of Xibaipo Fuping Expressway, Pingshan Zanhuang Expressway, Shijiazhuang Hengshui Expressway and Shijiazhuang Section of Tianjin Shijiazhuang Expressway; On March 16, the Water and Soil Conservation Plan of the Project from Tianjin Hebei Boundary to Baoshi Boundary of Tianjin Shijiazhuang Expressway passed the review of the Ministry of Water Resources; On March 17, the Provincial Communications Design Institute carried out the preliminary design survey of Tianjin Shijiazhuang Expressway; On April 6, the Provincial Communications Design Institute successfully completed the field work of preliminary survey of Tianjin Shijiazhuang Expressway; On April 15, the website of Hebei Communications Investment Group Co., Ltd. released the "Group Company Held the Preliminary Work Dispatching Meeting of Taihang Mountain Expressway and Baoding Section of Tianjin Shijiazhuang Expressway"; On July 29, the Project of Tianjin Hebei Baoshi Section of Tianjin Shijiazhuang Expressway of Provincial Communications Design Institute passed the field acceptance of preliminary survey at the institute level; On August 25, the Route Scheme for the Site Selection of Tianjin Shijiazhuang Expressway Project was released; On August 25, the Preliminary Review Meeting of the Environmental Impact Report on the Tianjin Hebei Baoshi Section of Tianjin Shijiazhuang Expressway was held in Shijiazhuang City; On September 2, the Evaluation and Demonstration Meeting of Social Stability Risk Analysis Report for Tianjin Hebei Boundary Baoshi Boundary Section of Tianjin Shijiazhuang Expressway was held in Baoding and other four cities.

Construction history

On November 19, 2003, the Tianjin Jinghai section was open to traffic. [19]
On November 29, 2006, the middle section of Jinghai was opened to traffic. [20]
At 11:08 on December 22, 2020, Jinghai Shijiazhuang Section of Tianjin Shijiazhuang Expressway was officially opened to traffic [2]
On July 15, 2021, the construction of Shenze Connecting Line of Shijiazhuang Section of Tianjin Shijiazhuang Expressway will start [16] At 10:58 a.m. on September 28, Wuji and Shenze toll stations in Shijiazhuang section of Tianjin Shijiazhuang Expressway were officially opened. [5] On December 10, the main line of Tianjin East Section of Tianjin Shijiazhuang Expressway was successfully completed, and the annual goals and tasks were completed 20 days ahead of schedule [6] On December 25, the Shenze connecting line of Shijiazhuang section of Tianjin Shijiazhuang Expressway passed the handover and acceptance [9] At 8:30 a.m. on December 26, the Shenze connection line of Shijiazhuang section of Tianjin Shijiazhuang Expressway was officially completed and opened to traffic [7-8] On December 31, the handover and acceptance of the main line of Tianjin East Section of Tianjin Shijiazhuang Expressway was successfully completed. [10]
On January 28, 2022, Tianjin Shijiazhuang Expressway East Section will be officially Open to traffic [11] All construction tasks are scheduled to be completed on December 16 [14] On December 30, the airport connection line was opened to traffic [15]

Line design

Announce
edit
G0211

Route

Tianjin Shijiazhuang Expressway (Tianjin Hebei boundary to Baoding Shijie section) Starting from the northeast ring of Shijiazhuang Ring Expressway in the west Shijiazhuang City (Wuji, Shenze) - Baoding City (Dingzhou, Anguo, Boye, Lixian, Gaoyang) - Cangzhou City (Ren Qiu) - Langfang City (Wen'an, Dacheng) and Tianjin High speed connection.
The Langfang section of Tianjin Shijiazhuang Expressway starts from Langfang City, Hebei Province Dacheng County )And Tianjin( Jinghai District )Ziya River at the junction crosses Beijing Kowloon Railway and Daguang Expressway via Dacheng North, Wen'an South and Renqiu North, Baocang Expressway in the northwest of Gaoyang, Shuohuang Railway in the west of Lixian County, Boye East and Anguo East, and connects with Shijiazhuang section of Tianjin Shijiazhuang Expressway after crossing Dasha River.

Line interworking

Interchange between Tianjin Shijiazhuang Expressway and other roads
region
type
name
remarks
Tianjin
Binhai New Area
Main line entrance and exit
/
Gangbei Road Xinshihua Avenue
Only access to Jinshi Expressway, not Qinbin Expressway
Interchange
Nangang Industrial Park Hub
Entrance and exit
Seaview Avenue
G228 Dandong Dongxing Highway (Seaview Avenue)
Xiqing District
Dongtaizi
S115 Tianjin Zitong Line
Interchange
Xiaozhangzhuang Hub
S5 Rongwu interconnection line expressway (under construction)
No Northwest Southwest two-way ramp
Jinghai District
Tuanbo South Hub
G25 Changchun Shenzhen Expressway
Entrance and exit
Cai Mansion
S213 Tuanwang Line
Interchange
Wangguantun Hub
Only entrance to Binhai New Area, only exit to Shijiazhuang
Huxinzhuang Hub
service area
Jinghaixi
/
Entrance and exit
Jinshi Jinlai
S120 Xinjin Laizhou Line
Hebei Province
Langfang City
Dacheng County
East of Dacheng
Tieline of Jinbao Road
West of the city
Palace line
Wen'an County
Interchange
Longjie South Hub
Entrance and exit
Wenannan
Connecting line of mining reserve line in Shuguang Road
Cangzhou City
Renqiu
service area
Ren Qiudong
/
Entrance and exit
Liang Zhao
S381 connecting line of Dahe Road
Interchange
Liangzhao junction
The Dezhou direction is not opened temporarily
Entrance and exit
Renqiu Development Zone
Interchange
Houzhao Gezhuang Hub
service area
Baiyangdian
/
Baoding City
Gaoyang County
Entrance and exit
Gaoyangbei
Gao'an Road
Parking area
Gao Yang
/
Entrance and exit
Gaoyangxi
Provincial Highway S331
Interchange
Xinliuzuo Hub
Lixian County
Entrance and exit
Lixian North
Linking line of Linqu Road
service area
Lixian County
/
Entrance and exit
Lixian County
G240 Baoding Taishan Highway (Wenliu Road)
Boye County
Hiroto
Connection line of Fanli West Road of Huangyu Line
Interchange
Nanyang Hub
Anguo
service area
Anguo
/
Entrance and exit
An Guonan
Dingzhou
Dingzhou East
Connecting line of Xingwei Road
Shijiazhuang City
Shenze County
service area
/
Under construction
Entrance and exit
Deep marsh
Bathymetric line
Wuji County
service area
Electrodeless
/
Entrance and exit
Electrodeless
G515 interconnection line, Mudaogou Bridge interconnection line
Gaocheng District
Interchange
Dujiazhuang Hub
Entrance and exit
Airport South
Zhengding County
Interchange
Corner paving hub
reference material: [23]

Line parameters

The construction mileage of the main line is 169.807 km, and the main line (including the main interchange bridge and the main line overpass separation overpass) has a total length of 26429.5 m/79 super large and medium-sized bridges, accounting for 15.56% of the total length of the line. Among them, there are 8 super large bridges 11918m long, 42 major bridges 12787m long, 24 medium bridges 1599m long, 5 small bridges 125.5m long and 347 culverts; 16 interchanges, 27 separated interchanges, 278 channels and 32 overpasses; There are 1 main line toll station, 12 ramp toll stations, 4 service areas, 1 parking area and 4 maintenance work areas. The main line adopts the standard of two-way six lane expressway, the design speed is 120 km/h, and the road width is 33.5 meters [4]
  • Haibin Avenue to Changshen Expressway,
It consists of the main line of the project and Rongwu connecting line.
(1) The main line starts from the Nangang Industrial Zone in Binhai New Area, connects the existing Haibin Avenue and Gangbei Road in Nangang Industrial Zone, passes through the south and Dongtaizi of Dagang Power Plant, and ends near Xiaozhangzhuang, Xiqing District, connecting the existing Tianjin Shijiazhuang Expressway and Changshen Expressway.
(2) The connection line of Rongwu Expressway is about 5.2km long.
The main line and connecting line are constructed in accordance with the standard of two-way four lane expressway, with a design speed of 100km/h and a subgrade width of 27.5m.
The main line is set with four interchanges, namely Nangang Industrial Zone, Dagang Oilfield, Dongtaizi and Xiaozhangzhuang. The connection line of Rongwu Expressway is provided with one Xiaobo interchange.
The estimated total investment of the project is about 7.62 billion yuan [13]

Value significance

Announce
edit
Tianjin Shijiazhuang Expressway will become a major traffic channel connecting Shijiazhuang, the capital of Hebei Province, with Tianjin directly, which is of great significance for promoting the coordinated development of Beijing, Tianjin and Hebei and the construction of Xiong'an New Area [12] Comments of China Power Construction Jijiao Expressway Investment Development Co., Ltd.)
The completion of the project will effectively connect the eastern area of Shijiazhuang City, Zhengding New Area, Airport Industrial Park and Shijiazhuang Zhengding International Airport, accelerate the conversion of land and air traffic, greatly facilitate people's travel, and is of great significance in improving the regional road network, optimizing the regional investment environment and promoting regional economic development [18] Hebei Radio and Television Review