canada-bwrx-300-rendering-flag.jpg

BWRX-300

Powered by commercially available fuel,the BWRX-300features an innovative and simplified configuration,resulting in less concrete and steel needed for construction。The BWRX-300is a cost-competitive solution that can be deployed for electricity generation and industrial applications,including hydrogen production,desalination,and district heating。It features up to 60%less capital cost per MW when compared with a typical water-cooled SMR,and using a combination of modular and open-top construction techniques,the BWRX-300can be constructed in 24-36 months while achieving an approximate90%volume reduction in plant layout。

预应力混凝土轴

In the news

Contact us

Want to learn more?