Hello, we are Yancheng * * * High altitude building maintenance anti-corrosion company:
Waterproof and leak stopping is one of the comprehensive enterprises integrating technology development, research and construction in China. In recent years, we have introduced foreign high-performance * * * hydraulic grouting tools. After years of construction experience, we have constantly improved the construction process of waterproof and plugging, as well as the innovation of * * plugging technology, * * * to control various underground engineering leakage, especially the leakage of cracks in mass concrete, tunnel engineering, and subsidence expansion joint With many years of experience in maintenance and treatment, and the ability to prevent water leakage with high difficulty, it is the plugging around you * * *! The construction performance spreads all over the country. * * * of the company is engaged in the construction of leak stoppage projects, and has gathered a group of * * * leak stoppage talents for many years*** Undertake: 1. Construction, settlement, expansion joints, and leakage prevention and leak stoppage of cracks at the bottom of the pool of expressway, seabed, river crossing, and underground * * * tunnel engineering structures. 2. Leakage and plugging construction of concrete structures such as underground foundation construction works, subway works, civil air defense works, sewage treatment pool, bottom plate, etc. 3. Basement, underground garage, underground passage, thermal power The Conduit , foundation pit and other underground works. 4. Pool Cable Trenches and pits, mine passages Elevator. Well and foundation pit works Construction joint Construction of leakage plugging with water. 5. Anti corrosion and leak stoppage construction for leakage treatment of concrete structure, cooling tower circulation channel, pipeline and sewage treatment pool works. 6. Leakage control and plugging construction of culverts, open caissons, pump houses, dams, bridge decks, roofs, tunnels, water intake and drainage works. 7. Grouting of reservoir dam body of water conservancy and hydropower projects, leak stopping and seepage prevention of water conveyance tunnel cracks, and seepage prevention and reinforcement of dam concrete cracks. 8. Coal conveying system, coal conveying bridge, drilling, oil well wall protection, and shaft concrete crack leakage water plugging and reinforcement of geological drilling engineering. Our company adheres to the people-oriented principle, follows the principle of "owners first, abides by contracts, and provides high-quality services"