Construction organization of industrial plant design scheme model
220KVXX substation is located in YY County, XX County, Hubei Province. The party of this bid is Hubei ZZ Company, and the design unit is Hubei WW Design Institute. Bid A of this bidding includes the main control building and communication building, 220KV outdoor power distribution device, complex building, gatehouse, fire fighting room, pump room and pool, and station roads. The station is located in the southeast of XX Chengguan. It is located on the hillock about 100m away from the northeast side of XX Shaxiang Highway, about 3km away from the center of Chengguan. The entrance road is connected to XX and Shaxiang Highway, 80m long. At present, the road from Wuhan to XX is under construction and can only travel one way. There are many traffic jams in the daytime. The station site area is farmland with fragmented terrain and large elevation difference. The natural elevation is 36-45M (Yellow Sea elevation system, the same below), and the leveling elevation is 41.2m, which is higher than the historical highest water level of the Yangtze River in Jiayu section of the Yangtze River and the historical highest waterlogging level of the region. Organized drainage is adopted in the station area. Its process is: the site is discharged to the road, the road is discharged into the rain castor well, and finally discharged out of the channel through the pipeline. The basic seismic intensity is 6 degrees, and the foundation soil layer is partially backfilled.