Boiler installation construction organization design of a university
This project is a gas boiler installation project of the Central Judicial Police College. The project includes: equipment installation: (1) installation of three WNS5.6-0.7/95/70-Q gas-fired hot water boilers, two WNS2.1-1.0/95/70-Q gas-fired hot water boilers, four CLHS0.23-100/10-Q vertical normal pressure gas-fired boiler and its accessories, and chimney; (2) Installation of one water softener, one plate heat exchanger, three primary water circulating pumps, two secondary water circulating pumps, two hot water supply pumps, three heating circulating pumps, one water distributor, one water collector, two heating surge tanks, two make-up pumps and other equipment; (3) Fabrication and installation of softened water tank, sanitary hot water tank, open water tank and make-up water tank; Process pipeline: the installation of heating supply and return water, sanitary hot water, soft water, tap water, make-up water, sewage overflow and other pipelines involved in the project, of which the heating supply and return water, sanitary hot water pipelines need to be insulated. Electrical part: (1) power cabinet and maintenance box required by the project; (2) Power supply of boiler burner and water pump; (3) The cable from the power distribution room to the boiler room shall be laid on the cable tray required for installation; (4) Patrol inspection parameters of the boiler room duty room and electrical installation of electrical self-control.