Uploaded on: 2015-05-11 17:31:11 come from: Road and bridge municipal administration / Design and construction of bridge and culvert
zero
5 points

This document is the as built drawing of a 7X32m long simply supported box girder double track bridge prefabricated and erected in a mountainous and hilly area in Guangxi. The bridge is located on a curve. Double track bridge, jointless track, distance between tracks is 4.6m. Total length of the bridge: 243.66m, span arrangement: 7X32m whole hole prefabricated and erected simply supported box girder. The whole bridge pier and abutment are equipped with hanging baskets. Pay attention to the embedding of relevant embedded parts, and the bored pile foundation. The drawings include prestressed reinforcement layout, beam reinforcement quantity table, beam anchor sealing structural drawing, lifting point layout detail, support plate structure and support installation schematic diagram, ballast retaining wall structure and reinforcement layout, cable trough vertical wall, cover plate, shutter layout, etc. The contents are comprehensive and detailed, which can be used for your reference.

 [Guangxi] As built Drawing of a 7X32m Full span Prefabricated and Erected Simply Supported Box Girder Double track Bridge in a Mountainous and Hilly Area - Figure 1

[Guangxi] As built Drawing of a 7X32m Full span Prefabricated and Erected Simply Supported Box Girder Double track Bridge in a Mountainous and Hilly Area - Figure 1

 [Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 2

[Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 2

 [Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 3

[Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 3

 [Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 4

[Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 4

 [Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 5

[Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 5

 [Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 6

[Guangxi] As built Drawing of Double track Bridge with 7X32m Whole hole Prefabricated and Erected Simply Supported Box Girder in a Mountainous and Hilly Area - Figure 6

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment