2. Design load: highway - Class I 3. The upper span of this bridge is composed of 3x50+(115+220+115)+5x50+25m, of which the 50m span is fabricated prestressed concrete continuous T-beam, the main bridge is prestressed concrete continuous rigid frame, and the 25m span is prestressed concrete cast-in-place box girder. The substructure is hollow thin-walled pier and pile column pier, the abutment is rib slab abutment and column abutment, and the whole bridge foundation is bored pile. 4. The seismic peak acceleration of the bridge site is 0.05g. 5. Pier beam consolidation is adopted for No. 2, 7, 8, 9 and 10 piers of this bridge.