Content introduction [Project overview] Superstructure: the superstructure of the approach bridge on both banks is prestressed concrete continuous box girder, and the bridge span is arranged as a 5X30m double width bridge; The main bridge adopts through concrete-filled steel tube tied arch, and the bridge span is (51+80+51) m double width bridge; Substructure of the bridge with a total length of 488m: φ 140 reinforced concrete three column pier shaft and φ 150 reinforced concrete bored pile foundation are used for the approach pier; The abutments on both banks are rib abutments, with bored pile foundation. The piers of the main bridge are thin-walled portal frame piers, and the φ 200 reinforced concrete bored pile foundation box girder structure: the center height of the box girder is 1.5 meters, the beam center distance is 2.99 meters, the prefabricated width of the middle beam of the carriageway slab is 2.2 meters, the prefabricated width of the side beam is 2.75 meters, and the width of the wet joint is 0.79 meters. The middle web and bottom plate of the box girder span are 0.18 m thick, and the end web and bottom plate are 0.28 m thick. The main arch rib: the middle hole arch rib is a vertical dumbbell shaped section composed of two φ 900 × 14 mm round steel tube concretes, which are poured in the pipe, pumped and filled with 50 # concrete. Between the two arch ribs, three straight braces are set, which are composed of two φ 600 × 8 mm round steel tubes and steel webs; The side hole arch rib is a vertical dumbbell shaped section composed of two φ 750 × 12mm round steel tube concrete, and 50 # concrete is pumped and filled in the pipe. Two zigzag transverse braces are set between the two arch ribs, which are composed of two φ 500 × 8mm round steel tubes and steel webs [Design standard] 1 Design flood frequency: 1/100 of the bridge; 2. Deck width: main bridge: 2 × (0.25m railing+1.5m sidewalk+0.9m arch rib+0.5m crash barrier+net 16m carriageway+0.5m crash barrier+0.9m arch rib), with double width spacing of 1m; Approach bridge: 2 × (0.25m railing+1.5m sidewalk+16m clear carriageway+0.5m crash barrier), with double width spacing of 4.0m; 3. Basic seismic intensity: VII, fortification based on VIII; 4. Bridge longitudinal slope: the main bridge falls on the vertical curve of R=12000 m, and the left and right sides of the bridge deck elevation are all symmetrical. West bank longitudinal slope i=1.0%, east bank longitudinal slope i=- 1.0%; 5. Bridge deck cross slope: 2.0%. 6. Navigation standards: Consider the layout of navigable small yachts [Data content], the layout of the bridge type, the layout of the superstructure of the main bridge, the coordinate map of the middle arch rib, the coordinate map of the side arch rib, the structural map of the middle arch rib, the structural map of the side arch rib, the structural map of the arch rib joint, the structural map of the middle arch transverse brace, the structural map of the side arch transverse brace, the structural map of the suspender General structural drawing of suspender beam, prestressed steel tendon drawing of suspender beam, detailed structural drawing of prestressed anchor sealing end of suspender beam, ordinary reinforcement drawing of suspender beam, reinforcement structural drawing of stiffening longitudinal beam, tie bar structural drawing, tie bar trough frame structural drawing, general structural drawing of bridge deck, structural drawing of steel reinforcement of bridge deck A, structural drawing of reinforcement of bridge deck B, structural drawing of deck pavement of main span Main bridge carriageway Π - shaped plate support, construction loading procedure drawing, general structural drawing of upper part of 30m span box girder, layout plan and structural reinforcement drawing of sidewalk cover plate of approach bridge, structural reinforcement drawing of main bridge railing, structural reinforcement drawing of approach railing, structural drawing of main bridge drain pipe, structural drawing of approach drain pipe, general structural drawing of crash barrier I, structural drawing of crash barrier I reinforcement General structural drawing of anti-collision guardrail II, structural drawing of anti-collision guardrail II reinforcement, structural drawing of anti-collision guardrail I foundation reinforcement, structural drawing of 8m approach slab, structural drawing of mat reinforcement at the end of approach slab, general structural drawing of 5 #, 8 # piers, structural drawing of 5 #, 8 # pier arch nodes, 5 #, 8 # pier shaft reinforcement drawing, 5 #, 8 # pier arch foot structural reinforcement drawing, 6 #, 7 # pier general structural drawing Structural Drawing of Arch Node of 6 # and 7 # Piers, Reinforcement Drawing of 6 # and 7 # Piers, Reinforcement Drawing of Arch Foot of 6 # and 7 # Piers, Reinforcement Drawing of Walkway Cantilever and Seismic Retaining Block of 5 #~8 # Piers, Reinforcement Structural Drawing of Bearing Platform of 5 #~8 # Piers, Reinforcement Structural Drawing of Pile Foundation of 5 # and 8 # Piers, Reinforcement Structural Drawing of Pile Foundation of 6 # and 7 # Piers, 1 #~4 # Piers General Structural Drawing of 9 #~12 # Piers...... There are more than 150 CAD drawings in total. Structural Drawing of Side Arch Rib Structural Drawing of Side Arch Transverse Brace Structural Drawing of Suspender Beam General Structural Drawing of Arch Rib Structural Drawing of Suspender Beam Prestressed Steel Strand Diagram of Steel Pipe Arch Rib Installation Schematic Diagram of Arch Rib Joint Structural Drawing of Cross bridge Water Pipe Support Tie Bar Structural Drawing of Approach Section Railing Data Including General Structural Drawing of Pier