Construction Scheme for Bored Pile of Auxiliary Bridge in Bid Section B2
Contents 1 Preparation Basis 4 2 Project overview 5 2.1 Overview 5 2.2 Geological conditions 10 2.3 Hydrological conditions 17 2.3.1 Flow speed 17 2.3.2 Water level data 17 2.3 3 Groundwater data 17 3 Construction of φ 2.0m bored pile foundation for 25 #~34 # piers 18 3.1 Construction scheme for pile foundation 18 3.2 Main construction methods 20 3.2.1 Construction process 20 3.2.2 Construction preparation 21 3.2.3 Positioning of drilling machine and embedding of steel casing 27 3.2.4 Drilling and hole forming 29 3.2.5 Hole cleaning and detection 38 3.2.6 Lifting and moving machine 39 3.2.7 Hole forming detection methods and standards 39 3.2.8 Fabrication, installation and transportation of reinforcement cage 39 3.2.9 Conduit placement 50 3.2.10 The second hole cleaning 51 3.2.11 Bored cast-in-place pile construction 51 3.2.12 Pile foundation detection 57 3.2.13 Detection pipe grouting 58 4 Construction of φ 1.80m bored pile foundation for 35 #~49 # piers 59 4.1 Construction scheme for pile foundation 59 4.2 Main construction methods 60 4.2.1 Construction process 60 4.2.2 Construction preparation 60 4.2.3 Drilling machine in place and steel casing embedding 64 4.2.4 Drilling and hole forming 64 4.2.5 Hole cleaning and detection 68 4.2.6 Drilling and moving machine 68 4.3.7 Hole forming detection method and standard 68 4.2.8 Reinforcement cage fabrication, installation and transportation 68 4.2.9 Conduit placement 73 4.2.10 Second hole cleaning 73 4.2.11 Bored pile construction 73 4.2.12 Pile foundation detection 77 4.2.13 Detection pipe grouting 77 5 Karst cave treatment measures 77 5.1 Construction preparation 77 5.2 Karst cave treatment during drilling 77 5.3 Karst cave treatment during concrete pouring 78 6 Treatment plan for broken pile 78 6.1 Reasons for broken pile 79 6.2 Preventive measures 79 6.3 Several methods for handling broken pile 80 7 Construction assurance measures 81 7.1 Process assurance measures 81 7.1.1 Measures to accelerate the hole forming below the bottom opening of the pile casing 81 7.1.2 Measures to ensure the completion of reinforcement cage and conduit installation as soon as possible 81 7.1.3 Measures to improve the speed of hole inspection and hole cleaning 81 7.1.4 Measures to improve the efficiency of concrete pouring 81 7.1.5 Measures to prevent inclined holes, reaming Hole collapse measures 81 7.1.6 Measures to prevent hole shrinkage 82 7.1.7 Measures to prevent drill drop 82 7.1.8 Measures to prevent sediment from being too thick or hole cleaning from being too deep 83 7.1.9 Measures to prevent the bottom of the acoustic pipe from being blocked and ultrasonic detection from not being in place 83 7.1.10 Measures to prevent pipe plugging Measures for pile breaking 83 7.1.11 Measures for preventing bored pile from connecting 83 7.1.12 Measures for preventing reinforcement cage from floating 84 7.2 Quality assurance measures 84 7.2.1 Quality assurance organization 84 7.2.2 Management measures 85 7.2.3 Technical measures 85 7.3 Progress assurance measures 86 8 Safety and environmental protection 86 8.1 Safety 86 8.1.1 Organization 86 8.1.2 Construction structure safety 88 8.1.3 Construction site safety 88 8.1.4 Lifting safety 89 8.2 Environmental protection 89 8.2.1 Peripheral environmental protection measures 89 8.2.2 Environmental responsibility system 90 8.2.3 Water and soil conservation measures 90 9 Civilized construction on site 90 10 Equipment and personnel 91 10.1 Construction organization personnel 91 10.2 Quantity of main materials 92 10.3 Quantity of main mechanical equipment 92
-
Construction Scheme for Bored Pile of Auxiliary Bridge in Bid Section B2
Contents 1 Preparation Basis 4 2 Project overview 5 2.1 Overview 5 2.2 Geological conditions 10 2.3 Hydrological conditions 17 2.3.1 Flow speed 17 2.3.2 Water level data 17 2.3 3 Groundwater data 17 3 Construction of φ 2.0m bored pile foundation for 25 #~34 # piers 18 3.1 Construction scheme for pile foundation 18 3.2 Main construction methods 20 3.2.1 Construction process 20 3.2.2 Construction preparation 21 3.2.3 Positioning of drilling machine and embedding of steel casing 27 3.2.4 Drilling and hole forming 29 3.2.5 Hole cleaning and detection 38 3.2.6 Lifting and moving machine 39 3.2.7 Hole forming detection methods and standards 39 3.2.8 Fabrication, installation and transportation of reinforcement cage 39 3.2.9 Conduit placement 50 3.2.10 The second hole cleaning 51 3.2.11 Bored cast-in-place pile construction 51 3.2.12 Pile foundation detection 57 3.2.13 Detection pipe grouting 58 4 Construction of φ 1.80m bored pile foundation for 35 #~49 # piers 59 4.1 Construction scheme for pile foundation 59 4.2 Main construction methods 60 4.2.1 Construction process 60 4.2.2 Construction preparation 60 4.2.3 Drilling machine in place and steel casing embedding 64 4.2.4 Drilling and hole forming 64 4.2.5 Hole cleaning and detection 68 4.2.6 Drilling and moving machine 68 4.3.7 Hole forming detection method and standard 68 4.2.8 Reinforcement cage fabrication, installation and transportation 68 4.2.9 Conduit placement 73 4.2.10 Second hole cleaning 73 4.2.11 Bored pile construction 73 4.2.12 Pile foundation detection 77 4.2.13 Detection pipe grouting 77 5 Karst cave treatment measures 77 5.1 Construction preparation 77 5.2 Karst cave treatment during drilling 77 5.3 Karst cave treatment during concrete pouring 78 6 Treatment plan for broken pile 78 6.1 Reasons for broken pile 79 6.2 Preventive measures 79 6.3 Several methods for handling broken pile 80 7 Construction assurance measures 81 7.1 Process assurance measures 81 7.1.1 Measures to accelerate the hole forming below the bottom opening of the pile casing 81 7.1.2 Measures to ensure the completion of reinforcement cage and conduit installation as soon as possible 81 7.1.3 Measures to improve the speed of hole inspection and hole cleaning 81 7.1.4 Measures to improve the efficiency of concrete pouring 81 7.1.5 Measures to prevent inclined holes, reaming Hole collapse measures 81 7.1.6 Measures to prevent hole shrinkage 82 7.1.7 Measures to prevent drill drop 82 7.1.8 Measures to prevent sediment from being too thick or hole cleaning from being too deep 83 7.1.9 Measures to prevent the bottom of the acoustic pipe from being blocked and ultrasonic detection from not being in place 83 7.1.10 Measures to prevent pipe plugging Measures for pile breaking 83 7.1.11 Measures for preventing bored pile from connecting 83 7.1.12 Measures for preventing reinforcement cage from floating 84 7.2 Quality assurance measures 84 7.2.1 Quality assurance organization 84 7.2.2 Management measures 85 7.2.3 Technical measures 85 7.3 Progress assurance measures 86 8 Safety and environmental protection 86 8.1 Safety 86 8.1.1 Organization 86 8.1.2 Construction structure safety 88 8.1.3 Construction site safety 88 8.1.4 Lifting safety 89 8.2 Environmental protection 89 8.2.1 Peripheral environmental protection measures 89 8.2.2 Environmental responsibility system 90 8.2.3 Water and soil conservation measures 90 9 Civilized construction on site 90 10 Equipment and personnel 91 10.1 Construction organization personnel 91 10.2 Quantity of main materials 92 10.3 Quantity of main mechanical equipment 92
-
There are seven B2.V1-12 orthogonal shaft gearbox models. The gearbox is an important mechanical component widely used in wind turbines. Its main function is to transmit the power generated by the wind wheel under the action of wind to the generator and make it get the corresponding speed
-
Gearbox is widely used in motors, which is often used in wind turbine generator sets. It is an important mechanical component of the DC gearbox, whose main function is to transmit the power generated by the wind wheel under the action of the wind to the generator and make it get the corresponding speed. Usually, the speed of the wind turbine is very low, far from the speed required by the generator for power generation. It must be achieved through the speed increase effect of the gearbox gear pair, so the gearbox is also called the speed increase box
-
Folder encryption super master V10.50
Now the author recommends a very professional encryption software - folder encryption super master. It has the functions of folder encryption, file encryption, folder camouflage, complete hiding of disk partitions, prohibition or read-only use of USB storage devices, shredding and deletion of files and folders, and system security, optimization settings and system garbage cleaning, It can be said to be a powerful encryption software.
-
-
Super rabbit magic setting 7.20 personal version
-
China's super steel pipe for water delivery -- an important role of low-carbon drainage
The material of super water delivery steel pipe is about half of the traditional steel pipe. The connection adopts the flexible interface of self-aligning rubber ring, which is more convenient than the ductile iron pipe. It is safer and more economical than the prestressed concrete pressure pipe, and can be used to build a pipe network transportation system with a stronger water delivery capacity at a lower cost; China's steel pipe technology for water transmission has missed a step in the process of reform and opening up. It is relatively backward, but it has also accumulated leaping energy. China's super steel pipe for water transmission is already in action.
-
It is a very convenient tool to insert trees (blocks) along the line or POLYLINE path, which is used in urban planning to improve the drawing efficiency. The program provides 11 predefined blocks, which can also be easily defined by yourself.
-
-
Architecture CAD Super Drawing King V4.1 Download
Under normal circumstances, the drawing of a building plan is quite complicated. A large number of wall lines need to be drawn in proportion, the positions of a large number of doors and windows need to be positioned in proportion, and the drawing of marking lines is trivial and troublesome. The super drawing king provides two tools to make this work easy and simple: after the double axis function inputs the size of the room, the software automatically generates the wall lines and corresponding labels of each room. The user only needs to trim these wall lines briefly, and the main part of the whole plan is completed. The marking function will mark the place where the door or window needs to be opened. Under the direction of the mark, the user can draw the door, window (all can be drawn in one stroke) and other objects, and the whole drawing is completed.
-
Kujiale Super House 7.0 Official Version
The Kujiale Super House is a necessary house design tool for your decoration. The Kujiale Super House will create your perfect home. This house type design software has a large number of free house type drawings. You can also customize the design and transformation of the house type, display the decoration effect online, provide the CAD import function, or directly import CAD to generate house type drawings. The software is simple to use, and provides detailed learning tutorials, which is very suitable for owner users to design their own home decoration.
-
CAD Super Gallery V6.0 official version download
The latest product, CAD Super Map Library, was released by CAD, and the applicable CAD version is AutoCAD2007-2012. It contains common cad blocks and libraries in dwg format, and is the most complete and largest CAD library at present.
-
CAD Super Gallery 5.0 official version download
CAD super library is the latest product of CAD, which mainly provides some cad blocks and libraries in dwg format. Known as the most comprehensive and largest CAD drawing library, it is developed based on AutoCAD2007-2012!
-
-
-
Construction organization design of a supermarket in Harbin
Reinforced concrete civil works, water supply and drainage works, heating works, ventilation and air conditioning works, lighting power works, elevator installation works, building automation and security monitoring works, integrated wiring, television and telephone works, fire water works, etc. in the main civil works of the project. Excluding: equipment and installation of power transformation and distribution room, fire power engineering and natural gas engineering.
-
The hydraulic motor is an executive component of the hydraulic system, which converts the hydraulic pressure energy provided by the hydraulic pump into the mechanical energy (torque and speed) of its output shaft. Liquid is the medium to transfer force and motion. Hydraulic motors, also known as oil motors, are mainly used in injection molding machinery, ships, hoists, engineering machinery, construction machinery, coal mining machinery, mining machinery, metallurgical machinery, ship machinery, petrochemical, port machinery, etc
-
The fixed casters have no rotating structure and cannot rotate. Usually, the two casters are used together. For example, the structure of the trolley is two fixed wheels at the front, and two universal wheels are near the pushing handrail at the back. Casters are made of various materials, such as cast iron wheels, nylon wheels, etc
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Villa 01 B2 Floor Plan Elevation CAD Drawing.dwg
This document is the plan elevation CAD drawing of B2 floor of Villa 01, including the original building plan, furniture layout, ceiling reflection, integrated ceiling reflection, partition size plan, interior decoration information, floor finish, switch wiring diagram, electromechanical plan, sanitary ware positioning diagram, elevation, etc. Welcome to download!
-
11 models of double piston rod cylinder (XQGA2 (B2) series), composed of pistons, piston components include: piston, piston ring, support ring, piston rod, etc. According to the different structural forms, pistons can be divided into cylindrical piston (length is larger than diameter), disc piston (length is smaller than diameter), differential piston, combined piston and plunger piston
-
AutoCAD Seven Days Super Rapid Method Version 2.0
-
AutoCAD 7-day Super Express V2.0 Instance.zip