300 pages of municipal road engineering supervision outline (including roads Drainage pipeline , greening works, etc.)
Construction scale: The total investment of the project is about 48 million yuan, including about 25 million yuan for the municipal works of Dongle East Road, 23 million yuan for Dongle Middle Road, and about 1400 meters for the total design length of the road, including 600 meters for Dongle East Road, 800 meters for Dongle Middle Road. The maximum diameter of the water supply pipe is DN600, and the maximum diameter of the drainage pipe is Φ 1350. Project design function: as the main traffic road in the near east area of Daliang Cloud, the project is the connection hub between the area and the old city and the new city. Through the connection of Dongle Road, Jurong Road, Huanshi East Road and Nanguo East Road, the traffic problem in the area can be solved; The project design reflects the people-oriented spirit, and people, bicycles, motorcycles and cars go their own ways; Set up roadside parking spaces for motor vehicles and parking spaces for bicycles and motorcycles, and combine the use functions of parking spaces with sidewalks and surrounding land; Highlight the design concept of landscape and nature. Slow traffic such as pedestrians and bicycles shuttles between greening, so as to coordinate the traffic with the natural environment; The development of public transport has also been fully taken into account, and harbor type stops have been set up. Scope of supervision work: supervision during the construction and warranty period of the municipal works of Dongle Middle Road and Dongle East Road near the East District of Daliangyun, Shunde District, including urban road works, water supply and drainage building installation works, etc.