In addition to heating works, it also includes buildings, structures, water and electricity, and complete construction organization documents. The boiler room installation works include foundation setting out acceptance, boiler body installation, boiler leveling, electrical control box (cabinet) installation, water pump installation, pipeline valve and instrument installation, softened water equipment installation, frequency control and constant pressure water supply device installation, Trial operation, constant pressure of safety valve, installation engineering quality standards, etc
Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!
Collection
share
WeChat code scanning and sharing
Click to share