Uploaded on: 2006-05-09 09:57:05 come from: electrical / Auxiliary tools / Calculator class
two
4 points

This procedure is applicable to the calculation of three-phase short circuit of high-voltage network in various small and medium-sized projects. The program uses the node potential method to establish the admittance augmentation matrix, which can be solved to obtain the node potential, voltage drop and current of each branch. Then, according to different power supply types, the short circuit current flowing through each branch can be calculated by using the operation curve method of constant voltage (power grid) or unit (steam turbine generator and water turbine generator). The number of network branches or nodes cannot be more than 50. The function of large capacity motor near the short circuit point has been taken into account.

 Three phase short circuit calculation of high voltage network in small and medium-sized projects
Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments (2) I want to comment
  • eight

    wbear2 LV4

    Thank you very much. I learned

    2014-12-23 15:15:14
Click to view more discussions