Construction scheme of eps board external insulation system for external wall of a project
1) During the construction period, according to the machinery selection plan and the actual demand, the construction machinery and equipment shall be organized to enter the site in a timely manner, and shall be placed safely according to the location of the construction plane layout plan. 2) After the mechanical equipment enters the site and is in place, professional personnel shall be organized to install and debug the equipment in time, and the equipment can only be used after being accepted by the machine management and safety departments. 5. Main construction equipment Electric heating wire cutter, scale, slotter, wallpaper knife, screwdriver, scissors, hacksaw blade, ink fountain, brown brush, roving paper larger than 20 grain size, 700~1000r/min electric mixer, plastic mixing bucket, impact drill, electric hammer, trowel, pressure bar, internal and external corner clamp, wire support board, 2m guiding rule, etc.