Construction organization design proposal for construction and installation works of a cement production line
This project is the construction project of the 5000t/d cement production line of Phase II of the Digang Conch Project, located in Digang Town, Fanchang County, Wuhu City, Anhui Province, with a civil engineering investment (estimated temporarily) of 52.05 million yuan. This bid project is the second phase expansion project of the cement plant. There are many sub projects of the production line, which are arranged near the south side of the first phase production line. There is local interference between the project construction and production. It is necessary to make overall organization and management, closely cooperate, be orderly and controllable, and maintain normal production and construction order. The structure types are mostly plain reinforced concrete frame, silo structure, and some steel structures; There are many horizontal and vertical (oblique) interfaces of each sub item along the production line, with strong relevance; The buildings are tall, the foundation is deep, the cylinder is huge, the structure is high, and there are many large equipment foundations and reserved holes. The construction process is complex, the quality standard is high, and the construction survey accuracy is required to be high. Most of the sub items are "high, precise, difficult, dangerous, and urgent". They must be carefully managed, and the construction technology guidance and quality inspection and control must be strengthened.