[Shandong] Sample of Distribution Box Purchase and Sales Contract for Installation Project
Content Introduction [Shandong] Sample of Distribution Box Purchase and Sales Contract for Installation Project, in WORD format, 2 pages in total. Quality requirements and warranty period 3.1 The production, processing, components and quality of products must meet the requirements of drawings, national standards and local relevant regulations, and pass the national 3C compulsory certification. The complete set of distribution box must comply with the technical standards of the drawing design and the requirements of the local power supply bureau. 3.2 Product requirements: 3.2.2 The box is made of 1.2mm cold-rolled steel plate and sprayed with plastic inside and outside the box. 3.2.3 The configuration in the box and the use function of the distribution box (cabinet) must meet the technical and functional requirements of Party A's electrical drawing design, and must meet the requirements of the local power supply bureau. 3.3 Party B shall provide a 2-year warranty period for the distribution box provided, which shall be calculated from the date when the project is qualified. If any quality problem occurs during the warranty period, Party B shall be responsible for free maintenance and replacement. 3.4 During the construction of the project, Party B must send experienced engineering technicians to be responsible for the technical guidance and supervision of the construction process. Delivery regulation 4.1 Delivery method: after the goods arrive at the construction site, Party A, the Supervisor and the Owner shall review according to the contract and drawings, count and hand over on site, and issue the material receipt. Party B shall go through the account entry formalities at Party A's place with the official material receipt (uniform format) and receipt (Party A's account must be opened). 4.2 Place of delivery: 4.3 Date of delivery:? Supply to the construction site within days.