Quality on-site supervision plan (prepared in 2014)
Main contents: requirements for implementing site supervision 1. The Project Supervision Department shall determine the specific implementation contents of site supervision for each project within the scope of site supervision and in combination with the characteristics of its own project. For the process or link without on-site supervision, the supervision work shall be done in the form of parallel inspection or patrol inspection. 2. The Project Supervision Department shall, in combination with the characteristics and difficulties of the project, define the objectives, propose methods and measures, and prepare a targeted and operable on-site supervision scheme. 3. The construction contractor is required to notify the Project Supervision Department in writing 24 hours before the construction of the key parts and processes requiring site supervision according to the Site Supervision Plan, and the director of the Project Supervision Department will arrange supervisors to carry out site supervision. At the same time, it is required that the construction contractor must arrange construction technicians to follow the shift on site to command the construction Site supervision personnel arrangement and job responsibilities 1. Check the on-site quality inspection personnel of the construction contractor, special type of work personnel with certificates, and the preparation of construction machinery and building materials. 2. Supervise the construction implementation of key parts and processes, construction schemes and mandatory standards for project construction. 3. Check the quality inspection report of the mobilized building materials, components, fittings, equipment and commercial concrete, and supervise the construction contractor on the site for inspection or entrust a qualified third party for re inspection.