Calculation Rules for Boiler Installation Engineering (Mongolia 2017 Norm)
The contents of this chapter include boiler steel structure (furnace frame, platform, escalator, handrail, metal structure, stainless steel structure), steam drum, water cooling system, superheater system, economizer system, air preheater system, body piping system, soot blower, grate, combustion device, installation of ash and slag removal device in the furnace and boiler hydraulic test, boiler air pressure test, oven drying, boiling, acid cleaning Steam tightness test, safety valve adjustment and other installation works. It does not include special protective measures for outdoor boilers, furnace wall masonry and insulation work.