Ningcheng Tianyi Town Landscaping Model project supervision outline
1. Project name: Ningcheng County 2016 Tianyi Urban Public Greening Project (PPP Project) Construction Supervision 2. Employer: Ningcheng County Housing and Urban Rural Development Bureau 3. Construction site: Tianyi Town, Ningcheng County 4. Construction scale: see the drawings for details. The project is a landscaping project, through tree planting, greening, footpath pavement, water supply and drainage, etc, Fully implement the idea of "harmonious coexistence of human and nature", and provide people with a recreation and leisure space with regional, cultural characteristics and a sense of the times. According to the characteristics of the project, the supervision work is as follows: 1) The project supervision organization, under the guidance of the project director, prepares the "supervision plan" and the "supervision implementation rules" for each discipline of the project, As a guiding and operational document for the supervision of the project; 2) Organize design technical disclosure and joint review of drawings; 3) Examine and approve the project commencement report, check the construction preparation, and review the qualification of the construction unit and the selected subcontractor; 4) Review the construction organization design and construction technical scheme submitted by the construction unit, and check the implementation; 5) Review the general project schedule, annual and monthly construction plans and project progress reports proposed by the construction unit. 6) Review and control the implementation of the fund use plan proposed by the construction unit for each stage, each year, quarter and month of the project. Review the project funds and certificates declared by the construction unit, and review the project settlement. 7) Supervise the construction unit to construct in strict accordance with the engineering technical standards, construction specifications and operating procedures by means of side standing, patrol inspection and parallel inspection; 8) Review the procurement plan of materials, components, fittings and equipment proposed by the construction unit, check their models, specifications and quality standards, strictly check the factory certificates and material reports of main materials, components, fittings and equipment, witness sampling and inspection of incoming materials, and control the incoming materials and equipment. 9) Be responsible for the coordination between all construction units and construction units. Preside over the regular project meeting. 10) Organize the preliminary acceptance of completion, review the completion acceptance data of the construction unit, and assist the owner in the completion acceptance and filing. 11) Responsible for coordination during warranty period and handling of quality accidents