Items in the bill of quantities of decoration works and calculation rules - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
This document is the general description of the items and calculation rules of the bill of quantities of construction projects in Hunan Province. The contents are complete and can be downloaded
This data is the evaluation method of the unit price of the bill of quantities. In view of the problem that only the total quotation of the award is evaluated while the unit price of the bill of quantities is ignored in the current bidding and awarding work, this paper introduces a method and standard for evaluating the unit price of the main items of the bill of quantities, which provides a decision-making basis for selecting the best contractor in the bid evaluation.The content is detailed and worth downloading.
This material is a handout of comprehensive unit price of BOQ items, including: pricing unit price, group price of comprehensive unit price in the list mode, determination of comprehensive unit price in the list mode, etc. The content is detailed and can be used for reference.
This document is a detailed and clear list of railway engineering bill of quantities and measurement rules, with high reference value, which can be downloaded for reference.
[Introduction] Rules and methods for calculation of quantities of decoration engineering doc format 8 pages are calculated by area according to the size shown in the design drawing① Deduct the area of protruding ground structures, equipment foundations, indoor railways, trenches, etc., ② do not deduct the area of partition walls and ≤ 0.3 ㎡ columns, stacks, wall attached chimneys and holes.③ The opening of door opening, hollow ring, heating package slot and niche will not increase the area.④ The partition wall refers to the wall whose thickness is ≤ 120mm.
[Introduction] Rules for calculation of quantities of decoration works PPT format Page 15 [Table of Contents] I. Relevant knowledge of floor works II. Description of floor works III, calculation rules of floor works IV, calculation and analysis of floor works
The common part of the two calculation rules of bill and quota of quantities summarizes the outward transportation of earth and stone: excavation volume - backfill volume - foundation masonry - cushion volume Site backfill: backfill area × average thickness Indoor backfill=S net * (indoor and outdoor height difference - floor thickness).
Those who know about cost know that quota and list are two mountains in the field of cost.It is a knowledge system that we cannot fail to understand in our work.However, quota and list have the same function but different rules.Many students who have just entered the cost industry are always confused, or only know one thing but not the other.
This material is: project settlement material. This article is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
1. Scope of work: demolition/dust control/cleaning/transportation inside and outside the slag yard2. Position: demolition and cleaning of the ground, ceiling, wall, stairs, walls, doors and windows, toilets, strong and weak electricity, plumbing and other parts in the office area. See the drawings and the site for specific parts;The specific removal parts shall be in accordance with the drawings and the actual site conditions.3. The construction unit shall be responsible for the removal and disposal of the demolished construction waste, and the formed construction materials shall be handed over to Party A for disposal;The original building structure shall not be damaged during demolition, and the non demolished parts shall be protected. If there is any damage during demolition or construction, the construction unit shall be responsible for it.
[Introduction] How to calculate the quantities of architectural decoration works?"PPT format"?? Page 69 [Contents] Overview of Quantity Calculation of Building Area Building Decoration Engineering Quantity Calculation Rules 1. Concept of Quantity and Basis for Calculation 2. Precautions for Quantity Calculation 3. Role of Building Area
The subgrade works in this chapter include: clearing and excavation, subgrade excavation, subgrade filling, subgrade treatment in special areas, drainage facilities, slope protection, retaining wall, mesh slope protection, prestressed anchor cable and anchor plate, anti slide pile, riverbed and slope protection paving works.
[Nationwide] Project setting and pricing of fire engineering bill of quantities (39 pages in total), main contents of PPT format: Section I Basic professional knowledge Section II Relevant cost standards Section III Pricing of fire engineering bill Section IV Construction drawing identification and engineering examples of fire engineering
This data is a summary of the item costs of the bill of quantities of subdivisional works, including: earthwork (stonework), masonry, concrete and reinforced concrete, roofing and waterproof works, etc. The contents are detailed and can be used for reference.
This summary table includes: project name and description, quantities, comprehensive unit price, labor cost, material cost, management cost, profit, etc.
The calculation rules for quantities of land improvement projects (implemented on August 1, 2013), the latest standard, can be downloaded for reference.
This case has three parts according to the actual situation. The first part is the bill of quantities, the second part is the bidding control price, and the third part is the bidding quotation.The fourth part is the completion settlement, which can be made accurately according to the actual situation in the construction process, so this case does not include this part.
This data is the comprehensive unit price calculation table of the bill of quantities of divisional and subdivisional works. The quantities are calculated from AD0885 replacement of cast-in-place component reinforcement, fabrication and installation of round steel (≤ Φ 10), total price of the list items, comprehensive unit price of the list items, etc., which can be downloaded for reference.
This document is the calculation of quantities of other decoration and measure items, including railings, handrails, comprehensive scaffolding, full scaffolding, etc., which can be downloaded for reference.