New 4S store project (decoration) Quantities List)
1. Scope of work: demolition/dust control/cleaning/transportation inside and outside the slag yard 2. Position: demolition and cleaning of the ground, ceiling, wall, stairs, walls, doors and windows, toilets, strong and weak electricity, plumbing and other parts in the office area. See the drawings and the site for specific parts; The specific removal parts shall be in accordance with the drawings and the actual site conditions. 3. The construction unit shall be responsible for the removal and disposal of the demolished construction waste, and the formed construction materials shall be handed over to Party A for disposal; The original building structure shall not be damaged during demolition, and the non demolished parts shall be protected. If there is any damage during demolition or construction, the construction unit shall be responsible for it.