Construction material mobilization acceptance system (page 66)
This document is the construction material mobilization acceptance system, in word format, 69 pages in total. Inspection of cement quality certification materials: (1) The materials include: production license, quality sampling inspection report valid within one year, factory inspection sheet and certificate of conformity; (2) The inspection report includes: factory, brand, variety, test number, strength grade, factory number and date, compressive strength, flexural strength, initial setting time, setting time, stability, chloride content test items, etc.