Subcontracting of HVAC professional installation works
Subcontracting and integration of HVAC professional installation works. Project overview Project name: Public HVAC professional installation works (hereinafter referred to as "the project" and "the project") Project overview: The total construction area of public buildings is 71797m2, with frame core tube structure, including two underground floors, and the underground construction area is 13880m2; Thirty seven floors above the ground (including four floors of podium), with a total floor area of 57917 m2; The total building height is 154.6 m. Project location: II. Project contracting mode and scope Project contracting mode: this project implements the contract of labor and materials, contract of work period, contract of quality, contract of safety, and contract of civilized construction. Scope of project contracting: material supply, installation and commissioning, detailed design, drawing review, construction, acceptance, testing, warranty service, etc. of HVAC engineering of fresh air supply and exhaust system, air-conditioning air system, air-conditioning water system, etc. 3、 Contracting method 1. All projects within the scope of this project are contracted in the form of labor, materials, duration, quality and safe and civilized construction, and are included in the general contracting management scope of Party C. 2. This project is a professional subcontracting project, which shall not be subcontracted or subcontracted separately. In case of subcontracting, subcontracting or subcontracting in disguised form, Party A has the right to terminate the contract, and Party B shall pay 10% of the contract price to Party A. 4、 Construction team 1. The project manager and on-site technical and management personnel specified in Party B's bidding documents shall not be changed or replaced at will after being assessed and approved by Party A and Party C. If it is necessary to transfer due to work needs, it must be approved by Party A and Party C in advance. If Party B replaces the contract without the consent of Party A and Party C, once found, Party A has the right to terminate the contract and confiscate the corresponding performance bond.