The construction organization design of weak current system is prepared according to the construction drawings provided by the construction unit, the construction schedule in the bidding document and the on-site survey results, in combination with the relevant specifications and standards issued by the state, the quality assurance system documents of our company and the relevant regulations and standards of our company.
Uploader:Upload time:2021-10-26 09:18:11Document format:docxNumber of collections:zerothe number of pages:eighty-threeComments:zero
Construction Scheme of a Weak Current Project in Chengdu - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
The construction process of each system is as follows: drawing review → embedded conduit, trunking laying and embedded, pre laid and reserved holes of supporting parts and fixtures → pipe trunking treatment → cable laying → cable testing → equipment installation → commissioning → networking commissioning of all subsystems → joint commissioning of the whole network → completion acceptance.
Design, supply, engineering installation, commissioning, detection and maintenance of the following weak current systems:?Telephone system?TV system?Electronic perimeter anti crossing alarm subsystem?CCTV CCTV monitoring subsystem?Building visual intercom subsystem?Background music system?Three meter remote transmission system?Generic cabling subsystem?Computer network subsystem?Parking lot management subsystem?Access control all-in-one card system
The scope of this construction mainly includes the following subsystems: 1. CCTV monitoring system 2. Telephone communication system 3. Computer network system
During the implementation of the project, the quality analysis meeting shall be held regularly. In case of major problems, the quality analysis meeting can be held temporarily to check the project quality, progress, etc., and make records. After the meeting, the minutes of the meeting shall be distributed to relevant personnel in a timely manner.
This material is the construction organization plan for the weak current project of XX Building, which is detailed and practical. Welcome to download it for reference.
Construction organization scheme for weak current project of XX building Construction organization scheme for weak current project of XX building Construction organization scheme for weak current project of XX building
The project is a fine decoration project. The scope of this construction mainly includes the following subsystems: 1. CCTV monitoring system 2. Telephone communication system 3. Computer network system.This data is the construction organization design scheme of the weak current project of the office building, 98 pages in total.
This scheme is the construction organization design scheme for the weak current project of a high-rise residential building in Chengdu. The content is detailed, for professional reference. PDF file, 79 pages.
This project is the construction scheme of weak current project for the central building of a science and technology park in [Henan].Construction scope: building functions of indoor ventilation and smoke exhaust engineering: the building functions designed on the first floor are reception, service center, property management room, incubation area and hall, and above the second floor are incubation areas (incubation area refers to the base for professional technical training to train managers of small and medium-sized enterprises).Construction organization system: the project adopts the project method construction management mode to organize the construction, and sets up the installation project manager department, which is under the unified leadership of the project manager to deal with all aspects of the problems in the construction, internally coordinate the construction of various professional types of work, and be fully responsible for the project production, technology, quality and safety work.Telephone system: HYV22-1000 * (2 * 0.5) is selected for the telephone trunk line of this project, which is buried outside the underground garage and laid along the bridge after entering the underground garage;Telephone junction boxes are set in weak current wells on each floor above the ground.Broadband network system: the broadband network trunk line of the building uses broadband access optical fiber, and the broadband network branch line uses category 5 UTP, which is concealed along the wall and plate through P20 pipes. Video monitoring system: monitoring camera machines are set at the main channel of the underground garage of the project, each entrance on the first floor and in the elevator car, the elevator lobby, and the main walkways on other floors to monitor the safety of these places.
On the premise of ensuring the project quality and duration, establish the environmental awareness of all employees on site, consciously protect municipal facilities, and minimize environmental pollution.And ensure orderly logistics, smooth construction and civilized construction to ensure that the site management meets the requirements of the owner's management
Main systems of the project: integrated pipeline system, integrated wiring system, computer network system, cable television system, machine room project, intelligent dimming system, intelligent conference system, information release system, video monitoring system, anti-theft alarm system and all-in-one card system
Cable embedding construction scheme for weak current engineering of a building Cable embedding construction scheme for weak current engineering of a building
Weak current project management construction scheme Integrated wiring system (telephone, network) Cable TV receiving system CCTV monitoring system Black and white visual intercom system Parking lot management system Offline patrol management system Background music system
The comprehensive construction scheme of weak current project in a community, * * located in Changsha City, Hunan Province, covers an area of 60 mu. In view of the actual situation of the "* * *" intelligent community, the intelligent system of the community is designed according to the two star standard in the Ministry of Construction's Key Points and Technical Guidelines for the Construction of the National Residential Community Intelligent System Demonstration Project.The scheme includes the following partsCommunity security system: CCTV monitoring, perimeter protection, and background music system
According to the requirements of the construction unit, our company actively cooperates with the progress of civil engineering, decoration and other construction units to ensure the completion of installation and commissioning within the construction period.
2.1.2 Organization and management mode of the project management department 1) Organization chart of the project management department 2) According to the situation of the project, we will adopt the two-level management mode of the important project headquarters and the project management department to ensure the successful completion of the project.The headquarters of important engineering projects is the highest responsible department of the project. It fully supports the work of the on-site project management department, uniformly allocates various resources within our party, coordinates the actions of various departments, establishes a quick response and emergency handling mechanism, and ensures the successful completion of the project. The headquarters is composed of the deputy general manager, the chief engineer, the manager of the engineering department, and the business and legal principals.
This time, thanks to the love and trust of the real estate, our company is deeply honored and grateful for giving us the opportunity to participate in the construction of the intelligent system.We promise to provide more detailed technical support, engineering advice and other comprehensive services for your project construction, and continue to deepen and optimize the design scheme and construction drawings according to your actual application.
Operating procedures for installation of intelligent buildings.The operating procedures are the operating technical specifications formulated to ensure the process quality and must be strictly implemented
Construction tasks shall be uniformly arranged and specifically planned on site.The construction shall be carried out according to the principle of first front end and then end, first monomer and then summary, and first part and then whole.The intercom system shall be constructed first by covering the inter floor box and the main box. The intercom integrated cable shall be laid from the inter floor box to the user's extension point. At the same time, the mark shall be made. After the self inspection is qualified, the intercom main line in the unit shall be laid.
The weak current system construction organization design of a printing factory is prepared according to the construction drawings provided by the construction unit, the construction schedule in the invitation for bids and the on-site survey results, in combination with the relevant specifications and standards issued by the state, the quality assurance system documents of our company, and the relevant regulations and standards of our company.
The reconstruction of sewage pipe network covers about 2.4 kilometers of Sanhe District, mainly including dredging of original channels, new channels and reconstruction channels.In the upstream section of Dongwei Jigou, measures such as channel desilting and channel reconstruction are adopted;In the downstream section of Dongwei Jigou, measures such as channel desilting and channel reconstruction shall be taken;In the section along the river, the railing weir adopts measures such as channel desilting and channel reconstruction to intercept the direct outlet of sewage along the river, so that the sewage can enter the Sanhe Sewage Treatment Station
The construction scheme of the steel structure project of a hospital in Chengdu is rich and detailed, and can be downloaded for reference and study by netizens.
Construction Scheme of a Land Consolidation Project in Chengdu Construction Scheme of a Land Consolidation Project in Chengdu Construction Scheme of a Land Consolidation Project in Chengdu
Construction Scheme of Weak Current Project in New Campus of a High School in Wuxi Construction Scheme of Weak Current Project in New Campus of a High School in Wuxi
In the construction scheme of a transformation and distribution project in a certain place, the installation location of high-voltage switchgear and low-voltage distribution cabinet transformer is within XX, and two municipal 10KV cable lines are respectively from XX stationF3XX outdoor ring main unit and F59 of XX substation are introduced.2. Construction drawing design of transformer and distribution project and 10KV cable line project of XX building has been completed
Construction scheme of a high-voltage power transformation and distribution project Construction scheme of a high-voltage power transformation and distribution project Construction scheme of a high-voltage power transformation and distribution project
1. This scheme is prepared according to the drawings of * * Provincial Electric Power Design Institute, the drawings of Hangguo Engineering Co., Ltd. and some accompanying data, as well as the electrical construction and acceptance specifications.2. This scheme includes the installation of the electrical works of the whole power plant, static commissioning of electrical equipment and system loop commissioning.3. The scheme does not include the items and methods of joint startup, operation and commissioning of generator system and its auxiliary equipment.4. This project is designed by * * Electric Power Design Institute and Hangguo Engineering Co., Ltd;The supervision company is * * management company;Constructed by * *.Because some drawings and equipment data are incomplete, some construction methods and requirements in the scheme will be specifically prepared in the technical disclosure.
Contents Chapter I Preparation Basis and Description 1 Chapter II Project Characteristics 3 Chapter III Construction Organization and Management 4 Section I Construction Organization and Management Organization 4 Section II Project Management System 7 Section III Efficient Operation of Construction Organization 8 IV Construction Preparation 10 Chapter V Construction Technology 12 IPre construction material inspection 12 Cable inspection requirements 12 Connector and equipment inspection requirements 12 Process requirements 12 Equipment installation 12 Cable laying 14 Piping laying 16 Chapter VI Temporary facilities for construction 19 Chapter VII Construction equipment allocation 20 Section I Construction equipment allocation plan 20 Section II Use of construction equipmentMaintenance 21 Chapter VIII Labor Arrangement Plan 22 Section I Organizational Measures for Labor Arrangement 22 Section II Labor Demand Plan for Installation Works 22 Chapter IX Safe and Civilized Construction Measures 24 Section I Technical Measures for Safe and Civilized Construction 24 Section II Management Measures for Safe and Civilized Construction 33 Chapter X Coordination Measures for Weak Current Engineering Construction 35 Section I Foundation and Main Body ConstructionStage installation and construction cooperation measures 35 Section II Installation and construction cooperation measures in decoration construction stage 37 Chapter XI Construction period and schedule 39 Section I Overall arrangement of project construction 39 Section II Total construction period objective 39 Section III Construction schedule 39 Section IV Technical organization measures to ensure construction period 39 Chapter XII Technical measures to ensure project quality 43Section I Basis for Quality Inspection and Assessment 43 Section II ToolsTechnology and Methods43 Section III Quality Management of Construction Preparation44 Section IV Quality Management Work Procedures45 Chapter XIII Quality Assurance System46 Section I Composition of the Company's Quality System46 Section II Operation of the Company's Quality System 46 Section III System Engineering Quality Assurance System47 Section IV Quality Assurance Measures 49 Section V Process Quality Inspection and Quality Control 49 Section XChapter III Project Training and After sales Service 51 Section I User Training 51 Section II Project After sales Service Scheme 52 Section III Timely Handling of Emergency Abnormal Situations 52 Schedule 55
The total construction area of the project is 55328 ㎡ (including 50701.7 ㎡ dormitory building and 4626.3 ㎡ information center).The above ground building area is 50743.05 ㎡ (including 46973.7 ㎡ dormitory building and 3769.35 ㎡ information center), and the underground building area is 4584.95 ㎡ (including 3728 ㎡ dormitory building and 856.95 ㎡ information center).The student dormitory has six floors above the ground (four floors locally) and one floor underground.Above the ground are dormitory rooms, activity rooms and auxiliary rooms, and the floor height is 3.6m.The ground floor is a sunken courtyard, bicycle parking lot and equipment room, with a floor height of 3.6m (4.5m at the equipment room).The information center building has four floors above the ground (partial first floor), which is used by the security office and the information center. The first and second floors are 4.5 meters high, and the third and fourth floors are 5.4 meters high.The underground floor is the equipment room, with a floor height of 5.4 meters.
Intelligent weak current general contracting construction scheme Intelligent weak current general contracting construction scheme Intelligent weak current general contracting construction scheme
**The hotel is located in * *, invested and constructed by * * Real Estate Development Center, with a total investment of 780 million yuan.After the project is completed, it will be an important office building and a five-star reception hotel.
This material is a summary of the weak current and intelligent engineering construction scheme of a college, 107 pages in total, which is detailed for reference.
This data is the 52 page project overview of the weak current system engineering design scheme of the power house. This project is a weak current system engineering, including the peripheral monitoring system of two buildings and the weak current system of the office on the fifth floor of one building.The project includes the following parts: (1) generic cabling system (2) access control system, (3) video monitoring system, (4) computer network system, (5) program-controlled switch system, (6) machine room (including UPS).The project will fully realize office automation, communication automation, security and management automation to meet the requirements of modern information. The overall function of the weak current system must meet the security needs of the office building and factory building. The overall design of the system must be people-oriented and designed on demand, with the most reasonable investment, the most advanced meansThe most scientific management meets the functional requirements of the above different types of buildings and provides safe, reliable and efficient services for the flow of people, logistics and information in the building cluster.In a sense, design is the foundation of success or failure of engineering projects, and it is a very important and challenging work. An excellent weak current design scheme is the premise and guarantee of high-quality projects.Therefore, after receiving the requirements and drawings of the weak current system, we have determined the design objectives of the weak current system from the aspects of function, performance, implementation and cost by carefully analyzing the use requirements, drawing layout, and combining with the building application situation to clarify and quantify your needs,So the System Engineering Design Scheme is designed and submitted to you for reference and selection.
Construction organization design scheme of weak current project of a building Construction organization design scheme of weak current project of a building