Uploaded on: 2021-10-20 16:37:58 come from: HVAC / HVAC construction design / construction plan
zero
4 points

The fourth project department of Lot 2 of Linhe Baigedada (Mongolia Gansu border) Highway Project of Beijing Xinjiang Expressway undertaken by China Railway Erju Engineering Group Co., Ltd. is located in Tamsu Prague Sumu, Youqi, Alashan League, Inner Mongolia. The starting and ending mileage of the line is K363+500 ~ K405+949, with a total length of 42.449km (divided into left and right ranges). The total length of subgrade construction is 41.91km. The main divisional works include foundation treatment, roadbed and embankment cutting Subgrade drainage and subgrade slope protection.

 Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 1

Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 1

 Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 2

Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 2

 Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 3

Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 3

 Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 4

Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 4

 Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 5

Subgrade construction scheme of Beijing Xinjiang Expressway - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment