Construction Scheme of Expressway Subgrade Slope Protection along the River

The starting point of the contract section A7 of Tongxin Haiyuan Highway from the provincial highway 103 to the contract section of Haiyuan Highway is K38+500, which is located behind Hejiabao Village, along Zhuangzishang and Miaoergou to Xinzhuang, and then through Wangjiajing, the toll station of the main line is set near Wangjiajing, then Wangjing Bridge is set to connect with Tonghai Road, and the main line with Tonghai Road is set at K46+600, after passing the level crossing, the toll station of the main line is set at the end point, and the old road of Tonghai is expanded along the old road of Tonghai. The end point is level crossing with Heihai Road, and the stake number of the end point of the project is K48+392.523. The total length of the route is 9.893 km.

Uploader: Upload time: 2021-07-02 15:05:04 Document format: docx Number of collections: zero the number of pages: sixteen Comments: zero Category label: Road and bridge municipal administration / Road and bridge construction design / construction plan
Detailed introduction Related recommendations Content comments
Detailed introduction
 Construction Scheme of Expressway Subgrade Slope Protection Works along the River - Figure 1

Construction Scheme of Expressway Subgrade Slope Protection Works along the River - Figure 1

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Related recommendations
Click to see more
All comments I want to comment
No comment