Uploaded on: 2021-05-08 15:32:28 come from: Water supply and drainage / Water supply and drainage construction design / construction plan
zero
3 points

When the replacement method is adopted in this project, the unsuitable materials on the foundation surface shall be thoroughly cleaned up first, and then the replacement materials shall be paved. The loose paving thickness of each layer shall not be greater than 300mm. During paving, bulldozers shall be used to bulldoze, and then road rollers shall be used to roll, with manual cooperation, so that the compactness is greater than 95% and the flatness is less than 15mm.

 Design and construction scheme of prestressed reinforced concrete capping beam - Figure 1

Design and construction scheme of prestressed reinforced concrete capping beam - Figure 1

 Design and construction scheme of prestressed reinforced concrete capping beam - Figure 2

Design and construction scheme of prestressed reinforced concrete capping beam - Figure 2

 Design and construction scheme of prestressed reinforced concrete capping beam - Figure 3

Design and construction scheme of prestressed reinforced concrete capping beam - Figure 3

 Design and construction scheme of prestressed reinforced concrete capping beam - Figure 4

Design and construction scheme of prestressed reinforced concrete capping beam - Figure 4

 Design and construction scheme of prestressed reinforced concrete capping beam - Figure 5

Design and construction scheme of prestressed reinforced concrete capping beam - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment