Main temporary works, prestressed concrete box girder prefabrication

 Prefabricated box girder supervision operation instruction design - Figure 1

Prefabricated box girder supervision operation instruction design - Figure 1

 Prefabricated box girder supervision operation instruction design - Figure 2

Prefabricated box girder supervision operation instruction design - Figure 2

 Prefabricated box girder supervision operation instruction design - Figure 3

Prefabricated box girder supervision operation instruction design - Figure 3

 Prefabricated box girder supervision operation instruction design - Figure 4

Prefabricated box girder supervision operation instruction design - Figure 4

 Prefabricated box girder supervision operation instruction design - Figure 5

Prefabricated box girder supervision operation instruction design - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Subgrade supervision Instruction Design organization scheme
    In this project, the items subject to technical inspection in the Inspection Standard shall be inspected according to the qualified point rate of the total spot check points.
  • Site supervision Instruction Design organization scheme
    The safety supervision diary of the Project shall be written in a standard manner, and the words used shall be accurate, rigorous, appropriate and concise. The record should use professional terms as far as possible, not too many modifying words, not to exaggerate.
  • Supervision data operation Instruction Design and construction scheme
    The quality accident handling of the project shall be carried out according to the procedure, and a complete record shall be formed; Follow up the handling of quality accidents and form supporting documents; The causes of quality accidents shall be analyzed practically.
  • Subgrade supervision Instruction Design planning scheme
    Before concealment of the project, the construction unit shall notify the supervision unit to organize acceptance and form acceptance documents. The survey and design unit shall send personnel to participate in the acceptance of important divisional works such as foundation treatment.
  • Site supervision Instruction Design and construction scheme
    Report for approval of mechanical equipment entering the site of the project: the report system shall be implemented for the mechanical equipment, machines and tools and their safety facilities and devices entering the site. The supervisor shall check the quality of the mechanical equipment, machines and tools and their safety facilities and devices entering the site according to relevant regulations, and the quality assurance data shall be complete, complete and effective.
  • Site supervision Instruction Construction design scheme
    This project mainly describes the test and inspection related to the side station during the side station process, such as the determination of the concrete slump of the manually dug cast-in-place pile, the sampling of concrete test blocks, the measurement of concrete raw materials, and the sampling of steel welding parts.
  • Supervision (VII) Construction organization design review Instruction
    The construction organization design is the overall plan for organizing the construction of the project and the guiding document for the contractor to organize the construction. The review of the construction organization design is mainly for the purpose of organizing the construction reasonably, managing scientifically, using manpower and material resources effectively, arranging time and space, and making the project construction meet the construction intent of the construction unit.
  • It is used for comprehensive management of supervision office data.
  • Supervision of communication base tower project Instruction
    Process name Process work content Supervisor's responsibilities Achievements refer to standards Other remarks 1. Project commencement 1. Organize and hold the first site meeting; 2. Approve the Construction Organization Design; 3. Approve the Project Commencement Report; 4. Prepare supervision rules 5. Qualification review of subcontractors 6. Engineering positioning survey 7. Material mobilization inspection 8. Review the construction schedule 1. Attend the meeting and assist the supervising engineer to make relevant preparations; 2. Understand the review points of Construction Organization Design and assist in the review; 3. Understand the review points of the Project Commencement Report and assist in the review; 4. Understand the key points of preparation of Supervision Rules 5. On site inspection and understanding of subcontractors 6. Be familiar with the drawings, exploration reports and relevant specifications for field measurement 7. Inspect the mobilized materials, components, fittings and equipment, and the unqualified products shall not be used in the project 8. Understand the construction schedule, track the project progress, and understand the process requirements of each process. 1、 minutes of the meeting 2. Review Record of Engineering Technical Document Approval Form 3. Review Record of Project Commencement Approval Form 4. Key points of supervision details 5. Review Record of Subcontractor Qualification Review Form 6. Inspection Record of Application Form for Construction Surveying and Setting out 7. Inspection Record of Inspection Application Form for Mobilization of Engineering Materials 8. Review Record of Construction Schedule Approval Form 1. Prepare according to the preparation requirements of the company's meeting minutes; 2. Supervision specifications; 3. Supervision specifications; 4. Supervision specifications and regulations of the company; 5. Supervision specifications; 6. Refer to the requirements of drawings, exploration reports and element tables 1. The Minutes of Meeting shall be completed and distributed to the participants the next day after the meeting; 2. Keep supervision log every day. 2. Acceptance of foundation trench 1. The construction unit shall fill in the acceptance data of sub divisional/divisional works construction inspection application form, and the acceptance records include: 1) Engineering positioning survey record 2) Foundation trench line inspection record 3) Foundation trench inspection record 4) Foundation treatment records (used in special cases) 5) Review and inspection application materials of foundation drilling exploration records (as required) 2. Site acceptance (including the following) A、 Dominant items: a, elevation, b, length and width, c, slope B、 General items: a. Surface flatness; b. Low soil property of foundation 3. The supervising engineer signs for approval 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction unit; 3. Inspect the construction site and check whether the construction unit has constructed according to the drawings, including checking the position, plane size and bottom elevation of the foundation pit; 4. Check the soil quality and groundwater of foundation pit according to the geological exploration report; 5. Check whether there are holes, ancient tombs, ancient wells, air defense shelters and underground buried objects at the bottom of the foundation trench, as well as the position, depth and shape of the above objects. 1、 Foundation trench line inspection record 2. Foundation trench inspection record A、 Dominant items: a, elevation, b, length and width, c, slope B、 General items: a. Surface flatness; b. Low soil property of foundation 3. Foundation treatment records (used in special cases) 4. Foundation drill rod exploration record Code for Acceptance of Construction Quality of Building Foundation Engineering GB50202_2002 6.2.1, 6.2.2 and 7.1.3 The supervisor shall inspect the reliability and authenticity of the materials reported by the construction company according to the on-site measurement of the specifications. Foundation treatment includes: Quicksand, silt and other conditions shall be reported to the supervising engineer in time, and the supervising engineer's guidance, suggestions and opinions shall be listened to. 3. Reinforcement works 1. Filled in by the construction unit 1) Inspection Application Form for Mobilization of Engineering Materials 2) Steel product certificate, delivery inspection report, mobilization re inspection report 3) Inspection records of concealed works, 2. Review the inspection application materials 3. Qualified in site acceptance 4. Signature and approval of supervising engineer 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. On site inspection and on-site verification of the mechanical properties of steel, the measured value of the strength of seismic reinforcement, chemical composition and other special inspections, the hook and bend of the load-bearing reinforcement, the hook form and appearance quality of the stirrup, the net size of the load-bearing reinforcement along the length direction, the net size in the stirrup, the connection method of the longitudinal load-bearing reinforcement, the load-bearing reinforcement and its type, grade, specification and quantity, The length and width and mesh size of the binding reinforcement mesh, the length, width and height of the binding reinforcement skeleton, the spacing, row spacing and thickness of the protective layer of the stressed reinforcement, and whether the construction unit has constructed according to the drawings and specifications; 1、 Fill in the relevant contents of the acceptance record of reinforcement processing inspection lot I II on site 2. Fill in the supervision log, including: on-site inspection records of reinforcement works, project progress, and relevant dynamics of on-site workers, materials, and machines. Code for Acceptance of Construction Quality of Concrete Structures (GB50204_2002) 5.1.1, 5.2.1, 5.2.2, 5.5.1 The supervisor shall report the quality problems to the supervising engineer in time, listen to the guidance of the supervising engineer, and carry out the on-site supervision work in strict accordance with the requirements of the guidance. 4. Installation of embedded parts 1. The construction unit shall fill in the inspection application materials (including), construction tables and acceptance records of subdivisional/divisional works: 1) Inspection application record of engineering materials mobilization 2) Steel Product Certificate Inspection Record 3) Inspection record of concealed works 2. Review the inspection application materials 3. Qualified in site acceptance 4. The supervising engineer signs for approval 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check the specification, model, installation elevation, flatness, center distance, diagonal dimension and rust and dirt removal of the embedded parts, fill in the supervision log, including: specification, model, installation elevation, flatness, center distance, diagonal dimension and rust and dirt removal of the embedded parts, project progress, relevant developments of on-site workers, materials and machines Code for Acceptance of Construction Quality of Steel Structures GB50205-2001 4.2.1, 4.3.1, 4.4.1, 5.2.1, 5.2.4 The supervisor shall report the quality problems to the supervising engineer in a timely manner, listen to the supervising engineer's guidance, and carry out the on-site supervision work in strict accordance with the requirements of the guidance 5. Formwork 1. The construction unit shall fill in the inspection application materials, including: construction inspection application form for divisional/sub divisional works; Acceptance records include: 1) Inspection application record of engineering materials mobilization 2) Engineering pre inspection record (formwork engineering) 2. Review the inspection application materials 3. Qualified in site acceptance 4. The supervising engineer signs for approval. 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check the geometric dimension, centerline, elevation, firmness of formwork, tightness and strength of joints, rigidity, cleaning inside the formwork, painting of release agent, etc. of formwork erection. 1、 Carry out on-site inspection and fill in the relevant contents of the main control items and general items in the Inspection Lot Quality Acceptance Record Form I of Formwork Installation Works; 2. Fill in the supervision log, including: on-site inspection, on-site inspection records, project progress, relevant dynamics of on-site workers, materials and machines Code for Acceptance of Construction Quality of Concrete Structures GB50204_2002 4.11 、 4.13 The supervisor shall report the quality problems to the supervising engineer in time, listen to the supervising engineer's guidance, and carry out the on-site supervision work in strict accordance with the requirements of the guidance 6. Concrete works 1. The construction unit shall fill in the inspection application materials, including: construction table of subdivisional/divisional works; Acceptance records include: 1) Inspection application form for engineering materials mobilization, including cement: certificate of conformity, ex factory inspection report, cement test report; Sand: sand test report; Stone: acceptance record of crushed (pebble) stone test report. 2) Acceptance records of concrete mix proportion and concrete opening identification data. 2. Review the inspection application materials 3. Qualified in site acceptance 4. The supervising engineer signs for approval. 1. The supervisors at this control point must be present and conduct 24-hour on-site supervision; 2. Assist the Supervisor i to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check the cement certificate, factory inspection report and cement test report; Sand: sand test report; Stone: acceptance record of crushed (pebble) stone test report. Concrete factory certificate, mix proportion application form, opening appraisal, and on-site witness sampling shall be recorded. Appearance quality and curing of concrete 1. Site supervision records. 2. Fill in the supervision log, including: on-site inspection, on-site inspection record, project progress, relevant dynamics of on-site workers, materials and machines 3. According to the on-site inspection results, fill in the concrete construction inspection lot quality acceptance record form II related contents of main control items and general items Code for Acceptance of Construction Quality of Concrete Structures GB50204_2002 7.2.1, 7.2.2, 7.4.1, 8.2.1, 8.3.17.4.1 The supervisor shall report the quality problems to the supervision engineer in time, listen to the guidance of the supervision engineer, and carry out the on-site supervision work in strict accordance with the requirements of the guidance 7. Backfill 1. The construction unit shall fill in the inspection application materials, 2. Review the inspection application materials 3. Qualified in site acceptance 4. Signature and approval of supervising engineer 1. Supervisors at this control point must be present 2. Focus on the quality control of backfill, Code for Acceptance of Construction Quality of Building Foundation Engineering GB50202_2002 6.3.1, 6.3.2, 6.3.3 The supervisor shall report quality problems to the supervising engineer in a timely manner, listen to the supervising engineer's guidance, and carry out on-site supervision work in strict accordance with the requirements of the guidance 8. Ground resistance test 1. The construction unit fills in the inspection application materials 2. Review the inspection application materials 3. Qualified in site acceptance 4. Signature and approval of supervising engineer 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check whether the construction unit conducts construction according to the drawings and specifications on site; 4. The ground resistance measurement value must be recorded truthfully, and the acceptance record of the construction inspection application form of sub divisional/divisional works must be recorded; Acceptance records include: 1. Inspection application record of engineering materials mobilization 2. Product certificate, factory inspection report, salt adding record 3. Inspection records of concealed works comply with Code for Design of Lightning Protection of Buildings GB50057_94 4.3.1 to 4.3.8, and at the same time, the resistance shall meet the design requirements. The supervisor shall report quality problems to the supervising engineer in a timely manner, listen to the supervising engineer's guidance, and carry out on-site supervision work in strict accordance with the requirements of the guidance 9. Commencement of tower steel structure project 1. Organize and hold the first site meeting; 2. Approve the Construction Organization Design; 3. Approve the Project Commencement Report; 4. Prepare supervision rules; 5. Review the tower construction schedule. 1、 Be familiar with design documents and project overview; Attend the meeting and assist the supervising engineer to make relevant preparations; 2. Understand the review points of the Construction Organization Design, and assist in reviewing the Construction Organization Design of the tower prefabrication and installation project submitted by the construction unit; 3. Understand the review points of the Project Commencement Report and assist in the review; 4. Understand the key points in the preparation of Supervision Rules, Assist in preparation; 5. Understand the overall project progress, and assist in reviewing the tower fabrication and installation schedule. 1、 Work records and minutes of site meetings; 2. Review records of key points of Construction Organization Design; 3. Review record of Project Commencement Report; 4. Work records; 5. Review record of construction schedule review form. 1. Work records and minutes of site meetings; 2. Supervision specifications; 3. Company regulations; 4. Refer to the construction requirements of the Employer. 1. The meeting should be held together with tower foundation and foundation works. 10. Recheck the tower foundation and bearing surface 1. The construction unit fills in the inspection application data; 2. Site acceptance is qualified; 3. The supervising engineer shall sign for confirmation. 1、 The construction unit shall fill in the inspection application data (registration form) after detecting the axis and elevation of the tower foot foundation, the support surface, the specification and location accuracy of the anchor bolts; The supervisor reviews whether the inspection application data are complete and complete; 2. The supervisor shall be present to review whether the data meet the design and specification requirements; 3. After the supervisor passes the field inspection, it shall be countersigned by the professional supervision engineer. Registration form of tower foundation and bearing surface recheck test data Code for Acceptance of Mobile Communication Engineering Steel Tower and Mast Structure YD/T5132-2005: Article 8.2. See Attached Table TY-1 for the format of registration form 11. Structure Incoming acceptance of components 1. Raw material inspection; 2. Processing inspection of parts and components (including inspection of outsourced parts such as fasteners); 3. Welding engineering inspection; 4. Inspection of anti-corrosion works. When transporting tower components to the installation site, supervisors must enter the site to inspect and accept the component quality: 1. Measure whether the raw materials used for main materials and other components conform to the design and specifications; 2. Check whether the processing elements of parts and components are consistent; 3. Meet the design and specification requirements; 4. Check the factory quality inspection records of welding appearance quality and internal defects of welded components; 5. Check whether the quality of hot-dip galvanizing and other anti-corrosion measures meet the design and specifications. 1、 Member mobilization quality acceptance record form (including 1-4 items); 2. Factory quality acceptance record of inspection lot of tower steel structure subdivisional works: including processing of parts and components (including raw material qualification certificate and re inspection report); Welding engineering; Quality acceptance records of three subdivisional works of anti-corrosion works (provided by the construction unit). Code for Acceptance of Mobile Communication Engineering Steel Tower and Mast Structure (YD/T5132-2005). 1. Raw material: YD/T5132-2005 Articles 4.2.1-5, 4.3.1-2 and 4.4-6; 2. Processing: YD/T5132-2005 Section 6.2-6. 3. Welding: Article 5.1 and 5.2 of YD/5132-2005; The welding of single pipe tower shall also meet Article 7.7.9 of CECS236:2008. 4. Corrosion prevention: Article 7.2.2-5 and 7.3.1-2 of YD/5132-2005; 1、 See Attached Table TY-2 for the format of component mobilization quality acceptance record; 4. Factory quality acceptance record of inspection lot of tower steel structure subdivisional works: as per YD/T5132-2005 12 Installation of tower components 1. Approve the tower installation commencement report; 2. Safety inspection on installation site; 3. Component installation: 3.1 Connection of fasteners; 3.2 The tower components shall meet the design requirements and be installed smoothly; 3.3 Connection of flange plate; Joint rate of gusset plate connection (in case of bolt shear connection); 3.4 Installation of steel platform and antenna support; 3.5 Installation of ladder, cable rack and bridge; 3.6 Installation of mast stay wire and clamp; 3.7 Overall verticality; 3.8 Installation of single pipe tower socket; 3.9 Installation of lightning protection structure. 1. According to the approved Construction Organization Design Check the installation conditions according to the requirements of the specification The installation shall be confirmed by the supervising engineer; 2. It is required to improve the installation and construction management system Organization and implementation; Wear safety helmet and safety belt during construction There are warnings in the operation area; Operators shall work with certificates; Those without climbing permit are forbidden to work on the tower; Ensure the safety management in place and civilized construction on site; 3. Be familiar with design documents; Check whether the installation quality of each part of the tower and mast and the overall structure meets the design and specification requirements; 4. Supervise the construction unit to organize according to the approved construction Design operation; Construct according to design requirements and specifications; Stop on-site fire cutting or forced installation; When hoisting other components and equipment with the installed structure, the strength and stability calculation results shall be submitted, and the components that are easy to deform shall be reinforced with the consent of the design unit. 1. Tower installation commencement report; 2. Safety inspection record form; 3. On site inspection record of tower installation subdivisional works. 1. Code for Acceptance of Mobile Communication Engineering Steel Tower and Mast Structure (YD/T5132-2005:8.1.3); 3.1 YD/T5132-2005: Article 8.3; 3.2 YD/T5132-2005: Article 8.4.1; CECS80-2006: Article 9.5; 3.3 YD/T5132-2005: Articles 8.4.6 and 8.4.7; 3.4 YD/T5132-2005: Articles 8.4.8 and 8.1.6; 3.5 YD/T5132-2005: Articles 8.4.4 and 8.1.11; 3.6 YD/T5132-2005: Articles 8.3.4, 8.4.3, 8.1.4 and 8.1.5; 3.7 YD/T5132-2005: Article 8.4.2; 3.8 CECS 236:2008: Article 8.6; 3.9 Lightning protection structure shall be installed according to design requirements 2. See Attached Table TY-3 for the format of safety inspection record form; 3. See Attached Table TY-4 for the format of on-site inspection record of tower installation subdivisional works.
  • Supervision parallel detection Instruction (Attached table)
    Construction unit: Design unit:; Survey unit: Civil engineering and pile foundation construction unit:. The commencement date of the project is MM/DD/YYYY, the completion date is MM/DD/YYYY, and the total calendar days of the total contract duration are days.
  • Improved soil engineering supervision Instruction
    Construction process requirements 5.2.1 Before the acceptance of the filling of the lower bearing layer, the geometric dimensions of the base should be checked, and the compaction standard should be checked (the detection and acceptance of the relevant processes should be carried out). The base that does not meet the standard should be treated to make it meet the acceptance standard. 5.2.2 Survey and setting out shall introduce temporary benchmarks near the construction site, report to the supervisor for approval, and strictly control the elevation; The amount of filler shall be controlled by the square grid on the subgrade. The longitudinal pile spacing of the square grid shall not be greater than 10m. The square grid piles shall be set on both sides of the subgrade and at the center of the subgrade in the transverse direction. Indicator piles shall be set outside the edges of road shoulders on both sides, and the dumping density of dump trucks shall be controlled with lime points in the grid to control the paving thickness of each layer. 5.2.3 Stabilized soil mixing equipment shall be used for mixing improved soil mixture in the mixing plant, and soil crushing equipment shall be equipped to remove soil lumps. Calibrate the measuring equipment, adjust the discharge amount per unit time at the discharge outlet, so that all kinds of materials entering the mixing equipment meet the requirements of mixing ratio; In addition, special attention shall be paid to whether the discharge volume per unit time at the discharge outlet is basically the same as that during calibration, and whether there are abnormal conditions such as blockage of the discharge outlet during formal mixing. When mixing the improved soil mixture in the mixing equipment, it is required to mix evenly, and the mixture shall not contain more than 10mm of soil blocks and undigested lime particles; The composition and moisture content of the mixture (the relationship between the moisture content during mixing and the optimal moisture content during rolling shall be adjusted according to the weather conditions) shall meet the specified requirements. Before formally mixing the improved soil mixture, the plant mixing equipment must be commissioned, and the plant mixing process parameters must be further reasonably adjusted and determined through various construction parameters summarized from the trial mixing and trial paving of the test section 5.2.5 Paving Calculate the paving area of each truck of mixture according to the loose paving thickness, and determine the stacking density. At the filling site, according to the quantity and paving thickness of each vehicle of earthwork, use lime points to control the dumping density of dump trucks, and at the same time, bury piles and hang lines to mark the loose paving thickness; After paving the mixture, first use a grader for initial leveling and shaping, and then use a roller to quickly roll it for 1-2 times. The pits shall be leveled. The mixture shall be initially leveled and then finely leveled. Special personnel shall be assigned to timely remove the segregation mixture and add new mixture. The compaction thickness of layered filling shall be carried out according to the compaction equipment and the method determined by the test section, and generally should be controlled within 20~28cm...... ⑶ Before filling the improved soil, indoor test shall be carried out according to the ratio provided by the design to determine the construction mix ratio. The mix proportion of improved soil shall ensure that the unconfined compressive strength and compaction quality of the mixture can meet the design requirements. The type and technical conditions of admixture outside the improved soil shall meet the design requirements. The mixture shall not contain more than 10mm soil blocks, undigested lime particles and plain soil layers. The improved soil shall have uniform color and luster, and be free of ash strips and lumps. The allowable deviation of modifier dosage is - 0.5%~+1.0% of the test mix proportion. ⑷ The shrinkage cracks of the improved soil will cause damage to the drainage surface, which is easy to cause water intrusion into the subgrade. Strictly control the compaction moisture content, ensure the compaction degree, and pay attention to curing to control the shrinkage cracks of the improved soil itself. The optimal water content control scheme is to spray water evenly into the improved soil when mixing with the plant mixing equipment when the natural water content of the soil is close to the optimal water content; If the difference between the natural water content of the soil and the optimal water content is large, it is considered to irrigate and stew the soil in blocks in the borrow area
  • Water supply and drainage operation of a supervision company in Xiamen Instruction
    This document is the water supply and drainage operation instruction of a supervision company in Xiamen, including: content introduction This detailed rules is applicable to the supervision and management of the construction and acceptance of the indoor water supply and drainage works of industrial and civil buildings and the outdoor water supply and drainage works of building groups (communities).
  • Operation of project supervision organization Instruction (PPT)
    This document is the operation instruction of the project supervision organization, in PPT format, 58 pages in total. Contents: I. Responsibilities of project supervision organization and supervisors II. Supervision work instructions in construction preparation stage III, quality control IV, progress control V, project cost control VI, completion acceptance and warranty stage control VII, contract management VIII, supervision data and information management IX, organization and coordination X, safe and civilized construction management XI Supervision Facilities and Internal Management XII. Quality Assessment of Project Site Supervision
  • Supervision of concrete mixing station Instruction
    This document is the supervision operation instruction of concrete mixing station, word grid, 13 pages in total. Contents: I, General Provisions II, Supervisor Organization III, Supervision Procedures IV, Quality Control Indicators and Control Measures
  • Project supervision contract management Instruction
    This document is a work instruction for project supervision contract management, word case, 6 pages in total. Contents: 1. Principles and contents of contract management 2. Management of project suspension and resumption 3. Management of project delay 4. Mediation of contract disputes 5. Treatment of breach of contract
  • Supervision of prestressed works Instruction (word)
    This document is a work instruction for prestressed engineering supervision, in word format, 14 pages in total. Contents: 1. General rules 2. Operation guide objects 3. Basis for prestressed engineering supervision 4. Operation manual for prestressed engineering supervision
  • Preparation of supervision site plan Instruction
    This data is the operation instruction for the preparation of supervision site plan, in word format, 12 pages in total. Contents: I. Basis for preparation of site supervision scheme II. Responsibilities of site supervision personnel III. Scope, procedures and methods of site supervision IV. Contents and project list of site supervision V. Record requirements of site supervision VI. Site supervision scheme
  • Supervision work content and operation Instruction assembly
    4. Work Procedure 4.1 Establishment of the project supervision organization After the signing of the project construction supervision entrustment contract, the supervision company will determine the candidate for the project chief supervision engineer. After the approval of the manager of the supervision company, the official appointment document of the chief supervision engineer will be formed and copied to the construction unit and all contractors. The Chief Supervision Engineer of the Project, taking into account the project scale, project characteristics, construction site, disciplines involved, complexity and other factors, proposes the preparation plan of the Chief Supervision Engineer's representatives (when necessary), professional supervision engineers and supervisors, and formally determines the composition of the project supervision organization after the consent of the company's head, based on the principle of simplicity and efficiency, And establish the project supervision organization 4. Work Procedure 4.1 Establishment of the project supervision organization After the signing of the project construction supervision entrustment contract, the supervision company will determine the candidate for the project chief supervision engineer. After the approval of the manager of the supervision company, the official appointment document of the chief supervision engineer will be formed and copied to the construction unit and all contractors. The Chief Supervision Engineer of the Project, taking into account the project scale, project characteristics, construction site, disciplines involved, complexity and other factors, proposes the preparation plan of the Chief Supervision Engineer's representatives (when necessary), professional supervision engineers and supervisors, and formally determines the composition of the project supervision organization after the consent of the company's head, based on the principle of simplicity and efficiency, And establish the project supervision organization.
  • Digging pile supervision of a project in Chongqing Instruction
    1、 Work in the preparatory stage of construction 1. The Project Supervision Department must review the following data before starting the construction of foundation works: Table 1: Construction Preparation Report of Foundation Works Table 2: Control Chart of Digging Pile Construction of Foundation Works Table 3: Statistics of Basic Quantities of Foundation Works Table 2 Construction Process Supervision • Progress Control Table IV: Construction Progress Control Plan of Foundation Works of Building 1 # V: Actual Construction Progress Control of Foundation Works of Building 1 # Quality Control Investment Control Table VI: Statistics of Completed Quantities of Foundation Works of Building 1 # Table VII: Monthly Completed Investment Statistics of Foundation Works III Appendix I: Quality Standards for Foundation Engineering Construction Page 14
  • Construction supervision of asphalt middle surface course Instruction
    In order to ensure the smooth construction and production of the SBS modified asphalt medium grain asphalt concrete middle surface, further strengthen the project quality, implement effective dynamic management for the entire construction process, and make relevant requirements for the construction of the middle surface, the specific requirements are as follows: 1. Raw materials 1 Quality control of coarse aggregate 1) The shape of coarse aggregate for hot mix asphalt pavement is close to a cube, with edges and corners, and has sufficient strength and wear resistance. 2) Field inspection shall be carried out for the incoming coarse aggregate to ensure that it is clean, dry, free from weathering and impurities. The particle size of coarse aggregate shall meet the requirements. 3) The 4.75-9.5mm sized crushed stone used for the middle and lower layers must be subject to secondary axle breaking treatment. 2. Quality control of fine aggregate All fine aggregates below 4.75mm of asphalt mixture for surface course must use machine-made sand produced by high-quality limestone; Relevant quality shall meet the requirements of design documents and the No. 1 Document of the High tech Construction Bureau in 2008. 3. The quality control of filler is to add 32.5 ordinary Portland cement to the asphalt mixture to replace some mineral powder, and the cement consumption is 2% of the total mineral aggregate. The filler must be limestone ground mineral powder. The mineral powder must be kept dry and can flow freely from the stone powder bin. The dust recovered from the dust removal device of the asphalt mixture mixing station shall not be used as filler. The dosage of the two materials should be accurate. 4. Asphalt quality control 7 pages
  • Supervision work Instruction Supervision summary report
    Project supervision summary report, this quality supervision station requires the same unit project quality assessment report as the necessary annex to the completion acceptance report (I) Quality control: in the supervision work of this project, the supervision personnel always implement the quality centered policy, adhere to the quality policy of standardized management, strict monitoring, active participation, and enthusiastic service, and through initiative first, pre control first Dynamic management, tracking site supervision, careful inspection and other means strictly implement the current project specifications, procedures, standards, contracts, design documents and the content requirements of the company's ISO9002 quality system procedure documents issued by the state and governments at all levels. At the same time, according to the characteristics of the project, the supervision plan, supervision implementation rules, key processes and important parts, and the site supervision plan have been prepared, In order to achieve the overall goal of project quality and make the project quality qualified. The main work of project quality supervision and control is as follows: 1 The qualification of contractors was reviewed to ensure that they met the relevant regulations, so that the management personnel of the Project Department and personnel for special types of work could work with certificates, establish a sound and effective quality assurance system, review and sign copies of the construction organization design and sub divisional construction scheme, review and approve the general construction schedule, sign and approve A4.3 application forms for project payment, and A4.2 application forms for project cost claims. 2. For the mobilization of large construction machinery, the preparation and approval procedures of the assembly scheme must comply with relevant regulations. 3. Check and control the quality of raw materials and (components) required for the project. The main raw materials used in the project are mainly witness sampled, and can only be used after passing the retest, so as to control the use of materials. 4. The reinforcement joints, concrete and mortar test blocks shall be supervised by the supervising engineer according to relevant regulations, and the test results (all meet the requirements, or there are unqualified test blocks that have been identified (see the identification data for details) meet the design requirements. 5、 The supervision fee shall be paid in the same proportion for the extension of the supervision time according to the relevant provisions of Article 39 of the Supervision Commission Contract; According to the actual situation, the reason and quantity for increasing the supervision fee shall be proposed. This article shall first seek the opinions of the manager in charge, so as to be unified and coordinated. (According to different contract terms) Six suggestions from the supervision unit 1. The construction unit should use the policy and try not to violate the policy to adapt to the market management requirements. Suppliers and contractors designated by the owner for a certain need should determine the general contractor, so that the construction site can be managed uniformly and may violate the possible safety risks. 2. For the work of the construction unit, the contractor shall select a project team, especially the project manager, constructors, quality officers and other key personnel shall first understand or investigate, and the personnel in place shall be bound by the contract terms. 7 pages
  • Supervision of a foundation digging pile in Chongqing Instruction
    Operation Instruction for Construction Supervision of Foundation Engineering I. Work in the Preparatory Stage of Construction 1. The Project Supervision Department must review the following data before starting the construction of foundation engineering: Table 1: Construction Preparation Report of Foundation Engineering Table 2: Control Chart of Digging Pile Construction of Foundation Engineering Table 3: Statistical Table of Basic Quantities of Foundation Engineering Table 2. Supervision Progress Control of Construction Process 1 According to the progress plan of the approved construction organization design, quantify the work events in the construction scheme of the foundation part, and prepare the progress control plan for the construction of the foundation part (bar chart must be used to facilitate the comparison with the actual progress) Quality control 1. Review the quantity and rationality of manpower, materials and equipment allocation of the construction unit; Review and confirm the construction organization design, construction scheme (measures) and quality assurance systems at all levels; 2. Check and confirm whether the construction of each process, concealed works and other process operations in the construction process is carried out according to the specifications, design drawings and construction scheme, and sign the evaluation opinions on the corresponding process inspection application form. 3. Carry out parallel inspection (spot check) and tracking inspection for construction quality during construction; Fill in the supervision log in strict accordance with the requirements of the cover page of the supervision log, carry out on-site supervision on the concrete pouring process, etc., and fill in the on-site supervision record form in strict accordance with the requirements. 14 August 2003
  • Safety supervision of housing construction Instruction
    6. Deep foundation pit with construction site more than 1.5m or foundation pit engineering with excavation depth less than 5m (including 5m) but extremely complicated geological conditions, surrounding environment and underground pipelines inspected by the safety supervisor. 2. Hoisting (hoisting works and steel structure hoisting with a lifting capacity of 30T or a lifting height of 10m) 3. Assembly and disassembly of large machinery, lifting joint (tower crane passenger cargo elevator), derrick erection and disassembly 4. Temporary power supply at the construction site 5. Scaffold erection and disassembly works...... 1) The safety supervision engineer shall check the "three guarantees" For the protection of "four openings", the General Contractor shall be urged to do a good job in the protection of the edges and openings of the construction site. When there are no protective facilities at the edge of the construction face or the height of the enclosure facilities is less than 80cm, the construction unit shall be required to set up temporary protective railings. At the same time, the safety supervision engineer shall master the ground entrance of the project under construction and the upper part of the passageway where the construction site is densely populated, and set up protective sheds as required to prevent object strike accidents caused by falling objects (4) For the installation and removal of formwork more than 2 meters, scaffolding shall be erected and protective railings shall be set to prevent the operation from being conducted on the same vertical plane. For formwork with a height of more than 3m, diagonal bracing shall be set around and an operating platform shall be set. If the column formwork is more than 6m, several column formworks shall be connected as a whole. (5) The operator must walk on the sidewalk when climbing high. It is strictly prohibited to climb up and down with formwork support, and it is not allowed to walk on the wall top, independent beams and other high narrow and unprotected formwork surfaces (3) During the operation on each floor, it must be confirmed that it stops on this floor before entering the lift car, and it is not allowed to enter just by looking at the floor lights. Cut off the parking switch or power supply during pit operation. (4) When the power supply of the elevator changes, the phase sequence must be checked before power transmission again to prevent the elevator from losing control or the motor from burning. (5) For ladder test in winter, low-temperature gear oil shall be added to the traction machine. If the elevator is stopped for a long time and the lubricating oil is checked for condensation, measures must be taken before starting Insulated conductors must be used for overhead lines. The sectional area of overhead insulated copper core shall not be less than lOmm2, and the sectional area of overhead insulated aluminum core conductor shall not be less than 16mm2. Within the span spanning railway and pipeline, the sectional area of copper core conductor shall not be less than 16mm2, and the sectional area of steel core and aluminum strand shall not be less than 25mm2. The aluminum stranded wire shall not be less than 35 mm2, and the conductor shall not have joints.
  • Supervision work summary Instruction (word)
    Supervision organization form and supervision personnel allocation, performance of Supervision Contract and payment of supervision fee
  • Engineering survey supervision review Instruction programme
    The control survey of the project is divided into horizontal control survey and vertical control survey. For general projects, the level of the first level horizontal control network shall not be lower than the fourth level (including the fourth level), and the level of the internal construction horizontal control network (secondary encryption control) in the work area shall not be lower than the second level (including the second level). For large or special construction projects, the level of the control network shall be raised by one level.
  • Supervision work summary Instruction programme
    In this project, the number of batches of steel, cement, sandstone, waterproof, thermal insulation materials, etc. are rechecked, the percent of pass rate is what, and the treatment method of unqualified products.
  • Supervision planning preparation Instruction engineering
    The key points of quality control of the project are the key points of construction quality control. The key points of quality control should be set according to the characteristics of the project, grasp the main factors affecting the construction quality of the process, analyze the reasons for affecting the quality of important parts or weak links in the process activities in advance, and propose corresponding measures for pre control.
  • Supervision process operation Instruction Assembly engineering
    Supervision plan of the project: a guiding document prepared under the leadership of the supervision engineer and approved by the technical director of the supervision unit, which is used to guide the project supervision organization to comprehensively carry out supervision work.
  • Supervisor witnessed sampling and inspection Instruction engineering
    Before the commencement of the construction of the project, the project supervision organization shall urge the contractor to implement the inspection unit of witness sampling as soon as possible. If necessary, the inspection (test) unit of witness sampling for inspection can be directly selected with the construction unit. The supervision engineer shall conduct field investigation on the test and detection unit proposed by the construction contractor, The test and detection unit must be a third party that has no administrative affiliation with the construction contractor.
  • Supervision internal management Instruction engineering
    The project data shall be managed by levels, and the chief supervision engineer of each project supervision department shall be responsible for the whole process management of the supervision data of the project supervision department; The full-time or part-time information documenter of each project supervision department is responsible for the collection and sorting of engineering data; The urban construction archivist of each department is responsible for the audit; After completion, the project director shall organize all professionals and information documenters to sort them out, which shall be reviewed and signed by the urban construction archivist, finally signed by the director, and then submitted to the company office for archiving (handling handover procedures).
  • Supervision of prestressed works Instruction programme
    The concrete work of this project includes concrete mixing, transportation, pouring, vibrating, curing and other processes. The requirements and methods are basically the same as those of the in-situ bridge construction. However, since the equipment and technical conditions of the prefabrication yard or prefabrication factory are better than those of the site, the concrete work may be organized more reasonably and effectively to meet higher quality requirements.
  • Supervisor witnessed sampling and inspection Instruction plan
    After the bricks of the same production line of each manufacturer of the project arrive at the site, 35000-150000 bricks are taken as a sampling batch, and those of the same manufacturer with less than 35000 bricks of the same production line are also taken as a batch.
  • Test supervision of a railway station Instruction
    1. Collection, storage and transportation of water samples (1) Scope of application This sampling method and sample storage time are only applicable to clean or slightly polluted natural water. (2) Reference standard 1. Method for Water Quality Analysis of Railway Engineering (TB10104-2003) 2. Standard for Water for Concrete Mixing (JGJ63-1989) (3) Collection of general water samples ① The following supplies shall be prepared for collecting water samples: 1. Sampling containers: glass or polyethylene containers that can be sealed. 2. Bucket and collecting bottle 3. Rod thermometer and deep water thermometer. 4. Sample bottle sealing material. 5. Label of water sample bottle and power of attorney for water sample. ② Sampling shall meet the following requirements: 1. Before sampling, the sampling container shall be washed with synthetic detergent. During sampling, the collecting container must be flushed for 3~4 times with the water sample to be collected, and 15~20ml space shall be reserved in the container. After collection, the sample bottle shall be sealed and labeled in time, and the temperature, water temperature, sampling depth, time, location and pollution around the water source shall be recorded.
  • Supervision site data management Instruction
    On site supervision office data is the original record of project supervision and management during project implementation, and the true record of quality control, investment control, progress control and contract management. These data are the necessary conditions for evaluating the project quality and delivery for use after completion, and are a file material that must be reviewed before the project completion acceptance filing. It is also the basis and evidence of various control and management work in the supervision work, reflecting the quality of the supervision personnel and the management ability and management level of the project supervision team, and can be used as the original basis for various disputes in the future.
  • Supervision of a bridge project Instruction
    The bridge pile foundation construction can be submitted separately as an independent sub project, and the commencement application report can also be included in the whole bridge commencement report. The commencement report shall list in detail the name of the construction bridge, the pile number of the bridge location, the construction technology and specific equipment to be used in the construction organization plan, and the personnel preparation. A written report shall be submitted to the Chief Engineer (Senior Resident Supervision Engineer) according to the contract provisions and specifications and the deadline requirements specified in the supervision procedure.
  • Construction supervision of a foundation project Instruction
    This document is a work instruction for construction supervision of a foundation project. The contents include supervision operation instructions. The contents are detailed for reference.