Construction organization design of an agricultural tractor road
Construction process: construction preparation → surveying and setting out → earth excavation → roadbed trench inspection → ground original soil beating → rammer compaction → kerb construction → 0.15m sand gravel pavement laying → backfill compaction inspection → handover and acceptance.
-
-
-
Full set of CAD structure details of a demolished road
The full set of CAD structure of a demolished road is detailed, and the detailed drawings and renderings of the CAD plan and elevation are fully planned. The individual building is consistent with the general layout, and the corresponding relationship between them is accurate. There are no errors, omissions, collisions and defects in the drawings. Welcome to download.
-
-
-
Four AT06-2S-LED24XX-2 plug models, two hole sockets are wired according to left zero and right fire, even if they are connected reversely, it does not affect the use of electrical appliances, and various electrical appliances are adaptable to the left and right of power lines
-
The "endless road" design model of 3D illusion This is a 3D illusion effect design model drawing, which uses endless roads to express the 3D effect model. Design is a design idea that no matter how you walk, you can't go to the end, because you are always walking in a cycle. It does not contain parameters, but can be edited. It can be opened with CATIA V5R20. It is a good learning material
-
Seven models of direct acting 2-2 or 3-2 way pivot armature valves, a direct acting medium isolated pivot armature valve. It can be used as distribution valve or mixing valve. The electromagnetic coil is made of chemical resistant epoxy resin. Because the coil system is separated from the medium by a diaphragm, the valve is especially suitable for corrosive acid, alkali and other media
-
-
-
This half round head tenon bolt was drawn by me with solidworks 2015! Features include rotating, stretching, cutting, etc! And I also turned into a common STEP format that can be opened by many mechanical software! Welcome to download! I will upload models in succession! I hope you will pay more attention
-
Reference CAD details for construction of Shunyi Road, Beijing
This project is a reference CAD detail drawing for the construction of Shunyi Road in Beijing, including the intersection greening design plan, section drawing, design drawing of the rear row street tree missing section, design drawing of the block brick wall section, etc. The content of the drawing is complete, the expression is clear, and the drawing is rigorous. Designers are welcome to download and use it
-
The drawing version is SW2016. The three-dimensional drawing of the curb stone grabber placed by the excavator can be edited, the structure is reasonable, and the drawing size can be changed arbitrarily. The curb stone grabber is a mechanical structure with a grabbing limit device, and you are welcome to download it for reference
-
The application of high-purity gas pipeline in the very large scale integrated circuit plant of 909 project. This paper briefly describes the selection of gas pipeline materials in the design of high-purity gas pipeline system of Project 909, and the requirements of the design for the construction, installation, pressure test and acceptance of the pipeline
-
-
Cad construction details of pipeline structure in a city
This project is a detailed cad construction drawing of pipeline structure of a city road, including the comprehensive plan, profile and cross section of the pipeline. The drawing is complete in content, clear in expression and precise in drafting. Designers are welcome to download and use it.
-
Cad design details of pebble road structure in a park
This project is: the detailed cad design drawing of pebble road structure in a park, including the paving method of water brush stone (pebble), architectural design instructions, etc. The content of the drawing is complete, the expression is clear, and the drawing is rigorous. Designers are welcome to download and use it.
-
Construction team of a residential area project on Longtan Road
The site of the project is narrow and small, so it is considered to make full use of the site and not stack too many materials on the site. At the same time, the west side of Building 1 is used as a temporary turnover material yard; In the construction phase of garage structure, building blocks 5 and 7 are used as temporary storage and processing sites; After the first underground floor of the garage is completed, the roof of the first underground floor with dense support will be used as the temporary storage and processing site for buildings 5 and 7; The roof of the first floor underground of Building 6 is prestressed roof, which can be covered with soil after the completion of the structure of Building 6, and the structural construction stage is used as the processing site. Therefore, the support of the first underground floor cannot be removed before prestressed tensioning. At the same time, this support is different from other floor slabs. The vertical support is densified to 0.9 m, and the timber under the roof is densified to 180~200 mm
-
Road municipal 10kV power supply to substation project
This building introduces two municipal 10kV power supplies to the substation. The two power supplies work at the same time. The substation is located on the first floor of the basement. 10kV cables are buried and laid into the substation on the first floor of the building. Two 10KV high-voltage cabinets with SCB10-1250kVA dry-type transformers are installed in the substation. A total of 12 sets of metal armored switchgear with central handcart are used. 10kV high-voltage system adopts single bus section operation. There is no interconnection switch between two sections of bus. High voltage circuit breaker adopts vacuum circuit breaker, zinc oxide arrester is set in the high-voltage cabinet, vacuum switch is equipped with spring energy storage operating mechanism, and the operating power supply voltage is 220V. The incoming circuit breaker is equipped with three-phase delayed overcurrent quick break protection and single-phase grounding protection (signaling); The outgoing cabinet is equipped with three-phase timing overcurrent protection, current quick break protection and single-phase grounding protection (signaling); The dry-type transformer is equipped with high temperature alarm signal and ultra-high temperature trip protection. The incoming isolation car is locked at the incoming circuit breaker, and the metering cabinet is locked with the incoming circuit breaker. A special metering device is set at the high-voltage side.
-
-
Reference detail drawing of road railing design in a region
This project is a reference detail for the design of road railings in a certain area, including plan, elevation, section, detail, etc. The content of the drawings is complete, clear and precise, and designers are welcome to download and use them.
-
Overall Commencement Report of Secondary Road Reconstruction Project
This data is the overall commencement report of the secondary road maintenance and reconstruction project. The total length of the HD3 section of the maintenance and reconstruction project of the Zhoutong Shandong section of Hengde Highway is 14.385km. This contract section includes subgrade, pavement, bridge and culvert, traffic safety and other ancillary facilities. The whole bid section is a section of Class II highway, with a design speed of 80Km/h. The subgrade width is 12.0m, the pavement width is 11.4m, the shoulder stones on both sides are 0.3m, the platform width is 0.5m, the cross slope of the carriageway is 1.5% in both directions, and the cross slope of the hard shoulder is 2.5%.
-
Bidding construction team for road overhaul project in a region
Fully consider the construction environment and engineering characteristics of this section. Comprehensively analyze various factors that are unfavorable to the construction progress and quality, and comprehensively consider and leave room for schedule arrangement, personnel and equipment allocation, construction methods, etc. 1.3 Project overview Mabei Road is a county-level road located in the northeast of Miyun County, numbered X014. It starts from Machang and ends at Beidianzi in the northwest via Xiazhuangzi, Laowa, Simatai, Caijiawopu, Shalinggoumen, Xiaoling, Tanghe, Jingshen Road. The starting stake of the line is K0+000, and the ending stake is K11+395.95
-
Greening landscape improvement project of a road in Guangzhou
Table of Contents Greening Design and Construction Description Planting General Plan Planting Plan Planting Grid Plan Greening Standard Cross Section Greening Standard Section Plan Greening Elevation Plant Picture Topaz Detail Drawing Fence Restoration Detail Drawing Bill of Quantities
-
Construction organization design of Wenshui Road and other pump stations
This document is the construction organization design of Wenshui Road and other pump stations, including: submersible centrifugal pump, submersible axial flow pump, wire rope grille cleaner, mobile grille cleaner, shaftless screw conveyor, screw press; High and low voltage distribution system equipment; Monitoring system equipment. The design is accurate and the content is detailed, which is worth downloading.
-
Supervision planning and detailed rules of road extension project
1. The standard dry unit weight of subgrade adopts the heavy compaction standard specified in JTJ051-85. 2. The subgrade compaction is mainly tested by sand filling method. 3. Rock fill embankment can be detected by the control method of rolling times of test section. 4. For rolled subgrade, if it is wetted by rain, no matter whether it is accepted or not, the surface must be cleaned and rolled again before soil loading continues after rain.
-
-
-
Construction organization design of old secondary road reconstruction
This data is the construction organization design of the old road reconstruction of the secondary highway. According to the characteristics of the contract section and the requirements of the construction period target, the overall construction sequence is determined as follows: all bridges, culverts, subgrade, mortar rubble construction work along the whole line are the key and difficult works of the contract section, and human and material resources are prioritized for construction. In order to ensure normal traffic during bridge construction, temporary access roads shall be built at the bridge construction site. The temporary access roads shall be buried with circular pipe culverts, and traffic safety enclosure measures shall be taken.
-
-
-
Xintangxue Road Construction Project -- Drainage
The total length of Shixue Road is about 470m. The design content includes rainwater pipeline, sewage pipeline and pipe position design. Drainage system: rainwater and sewage separation system is adopted for this drainage system; The newly built rainwater main pipe collects rainwater from both sides to the middle low point and discharges it into the nearby existing river channel. It mainly collects rainwater from the west plot and road surface. The design pipe diameter is D400-D800, and the contents are detailed for reference.
-
Road construction drawing of road discipline (Bachelor Road)
Road construction drawing of road discipline (bachelor road), drawing content: cover title page, drawing directory, summary of quantities, project geographical location map, project road network map, horizontal and vertical miniature, etc., for reference.
-
New Project of Xincheng Road Kindergarten HVAC
New project of Xincheng Road Kindergarten - HVAC, with a total construction area of 7696 square meters, one floor underground and three floors above the ground, and a building height of 14.5m. Design description, seismic support, civil air defense design drawing, HVAC layout, smoke control design drawing, air-conditioning refrigerant layout drawing, etc. are detailed and can be used for reference.
-
-
Dechang Road European style double villa 3D model large high-end residential villa project. Iconic project. The flagship of European style luxury houses. The total construction area is about 200000 square meters, the floor area ratio is 3.26, and the green space is 40%. It is located in the area of Dechang Road South Road, looking southeast to the Dongjiang River. It is only 2-3 minutes' drive from Daozhou Commercial Center. As the largest noble residential area in Chengnan District, it is planned to build a waterscape house and a super community to live in. There are also comprehensive businesses with a planned area of nearly 20000 square meters and a 2km style commercial street to meet people's daily needs, complete facilities and convenient life; Provide sports, fitness, health care and dancing for the community
-
This is a 1108105 switch power combination cabinet (4-way) 3D digital analog, which is loaded with two 30V100A plug-in boxes and two 30V300A plug-in boxes. The overall dimension of the combination cabinet is 600X700X1670. There is a transparent glass in the middle of the front door of the combination cabinet, which is used to see the status of the internal cabinet. Welcome to download it
-
The 3D model of the Guanggu Road Art Museum is a building, art or other forms of performance art performing in it. There are art museums all over the world with different architectural styles. Usually divided into stage and auditorium. Open with sketchup2018, welcome to download
-
The three-dimensional model of the classical residential buildings on Feihong Road is located at the intersection of Feihong Road and Xiangxue Avenue. It is the hub of the center of the two cities in the construction of the two cities, and it is the mainstream area of eastward development extending from the south to the east; The back of the community is Shiliuwan Ecological Park, the front is Zhangshuling Park, and the outside is Nantaling Park. Located among three parks, it is the best geomantic treasure land and the most livable area in the city center. The project covers an area of 174 mu, with a net land area of 115924.17 square meters and a total floor area of about 310000 square meters. It is a rare large-scale commercial and residential community in the urban area. Building density 27.5%, green space