This document is the detailed document of the model bidding document for construction projects in a certain area. The content of the document includes: the public bidding procedure for construction projects and other documents. The design is detailed and can be used for reference.
Detailed scheme document of model bidding document for construction project in a region - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
All bidders who have obtained the bidding documents.2. After receiving the questions raised, they will be answered through the pre bid meeting and delivered to all bidders who have obtained the bidding documents in the form of meeting minutes.3. Pre bid meeting 3.1 The purpose of the pre bid meeting is to clarify the questions in the bidding documents and answer the questions raised by the bidder in the bidding documents and field survey.The pre bid meeting can be arranged to be held within 28 days after 7 days of issuing the bidding documents.3.2 Under the supervision of the bidding management organization, the bid inviter shall organize and preside over the pre bid meeting, introduce or explain the bidding documents and site conditions at the pre bid meeting, and answer the questions raised by the bidder, including those raised in writing and orally at the pre bid meeting.3.3 The drawings shall also be disclosed and explained at the pre bid meeting.3.4 After the pre bid meeting, the bid inviter shall sort out the meeting minutes and answers, submit them to the bidding management agency for approval, and send the questions and answers to all bidders who have obtained the bidding documents in writing as soon as possible.3.5 When the pre bid meeting is held, the bidders participating in the pre bid meeting shall sign in and register to prove their attendance at the pre bid meeting.3.6 Any information and documents issued by the Tenderee to the Tenderer in writing or any questions raised by the Tenderer in writing shall be confirmed in writing.3.7 Procedures of pre bid meeting:
Hangzhou Construction Project Construction Bidding Document Model (2007), in WORD format, 53 pages in total.The content is detailed and can be used for reference.
The bidding documents of this contract include the following documents, all supplementary materials issued in accordance with Article 7 of the Instructions and the records of the preparatory meeting for bidding as described in Article 13
1. According to the received bidding documents for the project with bidding number, after our company inspected the site and studied the bidding documents for the above project, we are willing to contract the construction, completion and warranty of the above project at the total price of RMB yuan in accordance with the above contract conditions, technical specifications, drawings and bill of quantities.2. Once we win the bid, we promise to complete and hand over the whole project within days (calendar days).3. If we win the bid, we will submit a bank guarantee of% of the above total price or a performance guarantee issued by an economic entity with independent legal personality of% of the above total price as the performance security, and assume joint and separate responsibilities.4. If we win the bid, we will send (name of project manager) as the project manager of the project.5. We accept the advance payment and payment conditions in the bidding documents.6. We agree that the bid documents submitted are valid within the period of bid validity specified in the pre attached table of "Instructions to Bidders". During this period, our bid is likely to win the bid, and we will be bound by it.7. Unless otherwise agreed and effective, your letter of acceptance and bid documents will constitute a contract binding on us.8. Our bid bond in the amount of RMB yuan shall be submitted together with this bid contract.
6.1 The bidder shall carefully read and fully understand the bidding documents. If the bidding documents cannot substantially respond to the bidding documents, the bidding documents will be deemed as abandoned and rejected.6.2 Those who have obtained the bidding documents shall be responsible for the confidentiality of the bidding documents, regardless of whether they are bidding or not.
This article is an attachment to the bidding documents for construction projects, which is full of details and can be used as a reference for netizens.
This bidding project is a residential project for teachers in Area A, West Village, Xiamen University, with a total construction area of 46487 square meters. There are three buildings, 17 floors above the ground and 1 floor underground, located in the headquarters of Xiamen University. The planned investment is about 75 million yuan (excluding foundation works).
The list of measure items refers to the list of non engineering entity items occurring before and during the construction of the project to complete the construction of the project.
This document is the detailed document of the model bidding document for construction project construction in a region (the first version of the Ministry of Construction in 1997). The content of the document includes: installation and construction instructions for construction projects, calculation tables, comprehensive composition and other forms. The document meets the standards, is reliable, rich in content, detailed in ideas, and can be used for reference.
The bid evaluation shall be conducted by the bid evaluation committee and supervised by the bidding management organization.The bid evaluation committee is composed of relevant economic and technical experts (mainly economic and technical experts) invited by the bid inviter, the superior competent department of the construction unit and the bid inviter.
Model Bidding Document for Construction Projects in Tibet Autonomous Region, in WORD format, 178 pages in total.It is applicable to engineering construction bidding that must be invited in the Tibet Autonomous Region, and the design and construction are not undertaken by the same contractor.
Dalian Construction Project Construction Bidding Document Model (blank sample), WORD format, 122 pages in total, supervised by Dalian Construction Project Bidding Management Office, including the pre attached table of the Instructions to Bidders and the Instructions to Bidders, contract terms, contract document format, technical part format of the bidding document, bid evaluation rules and other chapters.
As the guarantor (hereinafter referred to as the guarantor), the securities company or insurance company (hereinafter referred to as the guarantor) jointly bears the responsibility of paying RMB to the creditor (name of the owner) (hereinafter referred to as the owner). Whereas the client has submitted a written bid to the owner for the construction of (name of the contract) on;(hereinafter referred to as "the Bid") The conditions of this Guarantee are: 1. If the Client withdraws its bid within the period of bid validity specified in the Bid;Or 2. If the Client receives the notification of award from the Owner within the bid validity period: (a) fails or refuses to sign the contract agreement according to the requirements of the Instructions to Bidders (if required);Or (b) failing or refusing to submit the performance bond in accordance with the provisions of the Instructions to Bidders, this guarantee shall be valid, otherwise it shall be invalid. However, the guarantor shall not be liable for the payment of the following amounts:
Model Bidding Document for Construction Projects in Tibet Autonomous Region, in WORD format, 178 pages in total.It is applicable to engineering construction bidding that must be invited in the Tibet Autonomous Region, and the design and construction are not undertaken by the same contractor.
It mainly includes: the pre attached table;General principles;Project overview;Scope of bidding and basic requirements;Interpretation, modification, question answering and other relevant contents of the bidding documents
General description of the project:Project name: XX Complex Building ProjectConstruction site: XXStructure type and number of floors: one floor underground and six floors above the groundConstruction scale: about 34217m2 (refer to the construction drawing for details)Contracting method: labor and material contractingRequired quality standard: meet the current national construction and project quality acceptance specificationsRequired duration: 320 calendar daysProject category: civil building Class II projectScope of bidding: pile foundation, enclosure, civil engineering, installation and outdoor ancillary works
The bidding document for the construction of primary school construction project was prepared in 2014 in WORD format, with a total of 45 pages. The construction scale of this project is 14972.98 square meters, and the total investment is 91.67 million yuan, of which: the estimated construction and installation cost is 64.34 million yuan, for reference.
The main content is the construction bidding document of port berth construction project. It is proposed to build two 3000 ton general berths, with the design annual throughput of 1.35 million tons, the design representative ship type of 3000 tons (hydraulic structure takes into account 5000 tons), and build corresponding warehouses, storage yards, production and living auxiliary facilities and port roads. At the same time, two new warehouses will be built within the land area of Tongguan Port Phase I Project,The bidding scale is about 170 million yuan.
The proposed bridge crosses a river. The bridge is 114 meters long, with a span of 20 meters. The upper part of the structure is 5 × 20 meters of continuous prestressed reinforced concrete hollow slab, the lower part is U-shaped abutment and solid pier, and the foundation is expanded by open excavation.Clear width of bridge deck - 4.5+2 × 0.25 m;It is proposed to divide it into one construction contract section.The total investment is about 2.24 million yuan.
The part is 5 × 20m continuous prestressed reinforced concrete hollow slab, and the lower part adopts column pier, pile column abutment and bored pile foundation.Clear width of bridge deck - 4.5+2 × 0.25 m;It is proposed to divide it into one construction contract section.The total investment is about 2.21 million yuan.Two cloths.From December 17, 2008 to January 6, 2009, all bidders can download the bidding documents and other materials on the website of the People's Government, the Bidding Center and Ji'an Bidding Center.8、 Time and place for submission of bid documents and bid opening: 1. Deadline for submission of bid documents: 9:00 am, January 8, 2009.2. Time of bid opening: 9:00 am, January 8, 2009.3. Bid submission documents and bid opening place: Bid Opening Hall on the 6th floor of the Bidding Center (in the county audit bureau)
The bidding scope of the bidding document for the construction of rigid structure of the construction project: the production and installation period of the steel members and part of the enclosure within the scope of the construction drawing: the required duration: 90 calendar days; the source of funds and the bidding method: self raised funds;Criteria and methods for bid evaluation of invited bidding: comprehensive evaluation method
The bidding document for the construction of the comprehensive building project of the inpatient department of a hospital, with a total construction area of 24849m2, the main building has 10 floors above the ground and 1 floor underground, and the building height is 36.6m (parapet top).
This document is an invitation, negotiation and bidding document for construction of construction projects, including the pre attached table of Instructions to Bidders and Instructions to Bidders, contract conditions, contract agreement terms, contract format, technical specifications, etc., which is detailed and can be used for reference.
Tangxiachong Interchange Project in a district is located in Songgang Subdistrict Office in a district, at the border of a certain district and Dongguan, at the intersection of a national highway, a certain avenue, and Guangtian Road. Tangxiachong Interchange, as the connection node of the three main channels, has a direct bearing on the operation of the entire transportation system in a district.Tangxiachong Interchange is a three storey incomplete interchange, which is composed of an avenue overpass bridge, six ramp bridges A1, A2, B, E, F and G, and two ramps C and I.Among them, a national road uses the old road to cross under;The whole upper span of an avenue is located on the third floor, and ramps A and E are located on the second floor.
20061117110400 Attachment of Bidding Document for Construction Project 20061117110400 Attachment of Bidding Document for Construction Project 20061117110400 Attachment of Bidding Document for Construction Project 20061117110400 Attachment of Bidding Document for Construction Project 20061117110400
In order to standardize the design bidding activities of engineering construction projects and protect the legitimate rights and interests of tenderees and bidders, in accordance with the Bidding Law of the People's Republic of China, the Construction Law of the People's Republic of China, the Contract Law of the People's Republic of China, the Measures for Survey and Design Bidding of Engineering Construction Projects and other relevant lawsThe regulations are formulated in the Model of Design Bidding Documents for Construction Projects in Beijing (hereinafter referred to as the Model of Design Bidding Documents).
This document is the first version of the model bidding document for construction projects issued by the Ministry of Construction in 1997.The contents include the bidding document template.The contents are detailed for reference.
Model Bidding Document for Construction Project (the first edition of the Ministry of Construction in 1997) Model Bidding Document for Construction Project (the first edition of the Ministry of Construction in 1997)
This document is the construction contract of power construction project in a certain area, and the contract documents shall be able to explain each other.Unless otherwise agreed in the contract, its composition and interpretation order are as follows: (1) Terms of Agreement;(2) Conditions of Contract;(3) Minutes, agreements and other documents clarifying the rights and obligations of both parties under the contract, such as negotiations and changes;(4) Letter of acceptance, bid and bidding documents of the bidding contract project;(5) Bill of quantities or project budget and drawings for determining project cost;(6) Standards, specifications and other relevant technical data and requirements;(7) Other documents forming part of the Contract.
1.3 Project overview: * * * teacher apartment project construction (bid section II), No. 4, 5, 6 and 7 teacher apartment building, with a total construction area of 10544.94 square meters, including: No. 4 teacher apartment building, with a construction area of 3138.47 square meters, 6 floors, and a brick concrete structure;5. Each building of No. 6 teachers' apartment has a floor area of 2612.96 square meters, five floors, and brick concrete structure;No. 7 teachers' apartment building has a building area of 2180.55 square meters, 5 floors, and brick concrete structure;