Uploaded on: 2020-09-08 13:51:14 come from: Construction documents / Building construction scheme / Elevator construction scheme
zero
4 points

High rise residential buildings A and B, located in the west of Ji'an Bridge South Road and the south of Limin Bridge Road, are all shear wall structures. In this project, one external elevator is installed in buildings A and B, and the building heights of buildings A and B are 66.62m respectively. In order to ensure the smooth vertical transportation of the secondary structure and indoor and outdoor decoration, the external elevator was installed in the first ten days of November.

 Detailed construction scheme for installation and removal of external elevator - Figure 1

Detailed construction scheme for installation and removal of external elevator - Figure 1

 Detailed construction scheme for installation and removal of external elevator - Figure 2

Detailed construction scheme for installation and removal of external elevator - Figure 2

 Detailed construction scheme for installation and removal of external elevator - Figure 3

Detailed construction scheme for installation and removal of external elevator - Figure 3

 Detailed construction scheme for installation and removal of external elevator - Figure 4

Detailed construction scheme for installation and removal of external elevator - Figure 4

 Detailed construction scheme for installation and removal of external elevator - Figure 5

Detailed construction scheme for installation and removal of external elevator - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment