Phase I pumping of coke co production methanol project Test report
Anhui Chemical Co., Ltd. has settled in Erba Development Zone to propose a methanol project with an annual output of 600000 tons. This time, it is proposed to build a coal transportation trench in A1 area. The perimeter of the foundation pit is 491m, and the area is about 4519m2. The excavation depth of this foundation pit is 6.5~12.7m below the natural ground, and the confined aquifer has been excavated through. The foundation pit adopts a three-axis mixing pile water stop curtain, with a depth of 16.6~25.6 meters, without isolating the confined aquifer.