gardens engineering construction Technical data management regulations and procedures
It mainly includes: project overview, project scale, project characteristics, construction period requirements, participating units, etc; Construction layout plan; Construction deployment and plan; Overall construction deployment and section division; Schedule and construction plan network diagram; Schedule of various labor, materials, machines and transportation; Quality objective design and quality assurance system; Construction methods and main technical measures (including winter and rainy season construction measures and new technologies, new processes, new materials, new equipment, etc.); For civil engineering and equipment installation complex projects such as large bridges, plants (yards) and stations, there should be special process technology design for the needs of individual projects, such as formwork and support design, underground foundation pit, trench support design, dewatering design, construction bridge, temporary line design, pipe culvert jacking, underground excavation, shield method and other process technology design, cast-in-place concrete structure and (prefabricated components) Prestressed tensioning design, hoisting design of large precast reinforced concrete components, concrete construction pouring scheme design, electromechanical equipment installation scheme design, commissioning and operation scheme of various process pipelines and water supply and drainage process treatment systems; The construction organization design of rail transit system and automatic control, signal, monitoring, communication, ventilation system installation and commissioning scheme shall also prepare the construction scheme of safety, civilized construction, environmental protection, energy conservation and consumption reduction measures, which is the core content of the construction organization design and is the engineering construction technical guidance document, large roads, bridge structures, plants (stations) The construction scheme of large equipment project is more directly related to the quality and durability of the engineering structure. The scheme must be prepared by the corresponding technical director in charge according to relevant regulations. The preparation of the construction scheme of major projects should be subject to expert argumentation or scheme discussion