The total project of the science and technology building of the projectArchitectureWith an area of 40000m2 and a building height of about 25m, the building consists of two floors underground and six floors above the ground, of which the second floor underground is for civil air defense, and each floor above the ground is for commercial use, atrium, multi-function hall, conference room, Boeing room, etc.Construction scope: air conditioning water system, air conditioning ventilation system, fire control and smoke exhaust system
Detailed HVAC construction organization design scheme of a science and technology building - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
This document is the HVAC system design drawing of a high-rise science and technology building, including the 14th floor horizontal plan, 14th floor air plan, 14th floor club air system diagram, machine room flow chart, etc., which is detailed and can be used for reference.
The total construction area of the project is about 110000 square meters.The total construction area of the office building sub project is 72788.00 square meters, the aboveground construction area is 58300.00 square meters, and the underground construction area is 14488.00 square meters;Number of floors: 2 floors for the above ground podium, 24 floors for the main building (26 floors locally).
From the perspective of public security prevention system, technical defense, civil defense and physical defense are indispensable conditions for public security prevention system.Using high-tech means to prevent invasion, theft, robbery and other illegal crimes and major political accidents is the problem to be solved by technical prevention - security prevention project.
The first to sixteenth floors of the project are for research, experiment and office. Fan coil units plus fresh air system are used for ventilation and air conditioning. Two fresh air units are set on each floor. B1 floor is for equipment. Air conditioning room is set inside. One axial flow fan is set in the north and south of the large air duct system.
Content Introduction China Meteorological Science and Technology Building Project has a total construction area of 40000m2 and a building height of about 25m. The building consists of two floors underground and six floors above the ground, of which the second floor underground is for civil air defense, and each floor above the ground is for commercial use, atrium, multi-function hall, conference room, Boeing room, etc.Construction scope: air conditioning water system, air conditioning ventilation system, fire control and smoke exhaust system
Arrange professional engineering technicians to carry out special disclosure, project content disclosure and process flow disclosure to technical workers, so that all construction personnel can be familiar with the performance, characteristics and requirements of the installed equipment before entering the construction site, and know them well.
This document is the construction organization design of a city meteorological science and technology building project.The content includes the construction overview and quality of the Science and Technology Building project.The content is detailed for reference only.
Located at the intersection of Fudong Street and Beisi Street, the Science and Technology Building is a comprehensive intelligent building integrating shopping, entertainment and office work.The building has complete supporting facilities, including large central air-conditioning, seven vertical elevators (including four high-speed elevators), eight escalators, large mechanical parking equipment and 5A intelligent system.It covers an area of seven mu, with a building area of 45000 square meters and a total height of 99.7 meters.There are 2 floors underground, 26 floors of the tower above the ground and 10 floors of the podium. The two parts are connected.Level 6 civil air defense and water pump room are set on the second underground floor.The underground floor is equipped with parking garage, power transformation and distribution room, air conditioning room, fire control room, etc.1F-5F is the commercial trade center, 8F is catering, 9F is leisure and entertainment, 10F is swimming pool and sauna, the equipment floor is equipment room and property office, 11F and 12F are entertainment supporting rooms, 13F is the company's office space, 6F, 7F and 14F~26F are open office writing rooms, and the top floor is elevator machine room and water tank room.The central control room and telephone machine room are located at the northeast corner of the 6th floor of the tower.
Design and construction scheme of security system of a science and technology building Design and construction scheme of security system of a science and technology building
CAD construction drawings for decoration design of a science and technology building, including plane, ceiling layout, A, B, C, D elevations, etc., can be used for reference.
The decoration of the project includes:ICeiling: light steel keel paper faced gypsum board white emulsion paint finish is mainly used, light steel keel Lesilon aluminum plate ceiling is used, and light steel keel microporous aluminum plate ceiling is used in toilet.IIWall: perfect combination of latex white paint, cherry wood skirting board and art decoration painting.IIIGround: anti-static floor is used in the centralized control center and automation machine room, flame retardant carpet is used in the billiard room, and wood grid joinery board base composite wood floor is used in the table tennis roomIVWater and electricity: PP-R pipes and pipe fittings are used for domestic water, and hot melt connection is used. UPVC drainage pipes and pipe fittings are used for drainage pipes
The project base of AVIC Science and Technology Building is located in the factory area of Jincheng Group Co., Ltd., with Longpan Middle Road in the west, planned roads in the factory area in the north and south, and the factory area in the east.The project covers an area of 20083m2, with a total construction area of about 164013m2. Among them, the north tower has a construction area of 51732m2, 32 floors above the ground, 4.2m storey height, and 153.9m building height; the south tower has a construction area of 24928m2 (7F-22F), 22 floors above the ground, 3.6m storey height, and 107.5m building height; the supporting podium has a construction area of 87353.2m2 (including basement), 3-5 floors above the ground, and 6-30m storey height,The building height is 23.5m-39.3m.A large five-star hotel integrating catering and entertainment and a modern office building will be built in Block A of AVIC Science and Technology City, mainly including Tower A of Science and Technology Research and Development (hereinafter referred to as the office building), Tower B of Science and Technology Research and Development (hereinafter referred to as the hotel), basement and supporting skirt rooms.The proposed office building has a building area of 51732 square meters (7F~32F), 32 floors above the ground and a building height of 153.9 meters;The hotel has a building area of 24928 square meters (7F~22F), 22 floors above the ground and a building height of 107.5 meters;The large basement has 3 floors underground, with a building area of 45477 square meters;The supporting podium has a building area of 43771 square meters, 3 to 5 floors above the ground, and a building height of 23.5 meters to 39.3 meters.
In the actual construction, we will take the work on the critical path or the work that affects other professional construction processes as an important link
Select skilled and experienced construction personnel as the backbone within the company, establish the project construction team, adopt flexible arrangement, and implement dynamic management to ensure sufficient labor resources
The equipment foundation setting out is an important basis for the accurate positioning of equipment. It will be carried out in strict accordance with the relevant dimensions of the drawing, and the vertical and horizontal cross lines will be drawn with ink lines on the foundation
Ground: anti-static floor is used in the centralized control center and automation machine room, flame retardant carpet is used in the billiard room, wood grid joinery board base composite wood floor is used in the table tennis room, anti-skid floor tiles are used in the toilet, British grey hemp, Shandong white hemp, black gold sand granite are used in the elevator room, and 600 × 600 Nobel floor tiles are used in the rest.
This information is the design scheme of the security system of the Science and Technology Building. The information is valuable and detailed for reference.
This manuscript is the construction organization design of a science and technology building project in China.Project overview China * * Science and Technology Building Project has a total construction area of 40000m2 and a building height of about 25m. The building consists of two floors underground and six floors above the ground, of which the second floor underground is for civil air defense, and each floor above the ground is for commercial use, atrium, multi-function hall, conference room, Boeing room, etc.Construction scope: air conditioning water system, air conditioning ventilation system, fire control and smoke exhaust system;
This document is the construction organization design of the interior decoration project of Fangda Science and Technology Building. It is detailed and can be used for reference.
The total construction area of China Meteorological Science and Technology Building Project is 40000m2, and the building height is about 25m. The building consists of two floors underground and six floors above the ground, of which the second floor underground is for civil air defense, and each floor above the ground is for commercial use, atrium, multi-function hall, conference room, Boeing room, etc.
This data is the detailed construction drawing of Yueyang China Meteorological Science and Technology Building. The data content includes: architectural design description, architectural plan
Central air conditioning diagram of Science and Technology Building. The project data is in dwg format. The drawings include: detailed schematic diagram of each section, internal and external plan, plan of each floor, etc. The design specification is detailed. Welcome to download and view. Thank you~
Timber for construction shall be purchased according to the grade required by the design and relevant national regulations.It is required that the material shall be sufficiently dry, free from warpage, moth eaten, damage, etc., and knots and secondary lines shall not affect the appearance and quality requirements.
The suspended ceiling of this project is divided into light steel keel gypsum board, aluminum alloy strip keel, light steel keel Lesilon aluminum plate, molded wooden keel plastic aluminum plate and various glass decorated suspended ceilings.
Construction organization design scheme of Science and Technology Building of Anhui Keyuan Biochemical Research Institute, including project overview, safety construction scheme, etc
Pile head chiseling: the pile head can be chiseled manually after a certain elevation is chiseled by air compressor. When chiseling the pile, pay attention to that the pile head is anchored to the bottom plate. The length shall be no less than 100mm according to the design requirements, and the pile head reinforcement is anchored to the bottom plate for no less than 45d,If the length is not enough, the reinforcement of the same model and specification shall be welded to the anchorage length, and the pile chiseling work can be conducted alternately with the cushion construction (remember that the concrete of the cushion shall not fall into the pile head)
The construction organization design scheme of the electromechanical installation project of the Science and Technology Building is detailed and rich, with accurate and comprehensive design, which can be downloaded by netizens.
This document is the HVAC construction drawing of a science and technology building in [Shenzhen]. The project is located in Shenzhen, Guangdong Province, with a total floor area of 47325.98 square meters.The building area of the underground part is 8287 square meters. There are three fire compartments in the basement. The first and second fire compartments are garage in peacetime, second-class personnel shelter in wartime, and the third fire compartment is equipment room.The building area of the above ground part is 39038 square meters, and the above ground part has eight floors, all of which are R&D bases.The total height of the building is 29.95m.Air conditioning area is 33910 square meters.Drawings include: refrigerant pipe plan, HVAC construction plan in the basement of a science and technology building, which is accurate in design and detailed in content, and can be downloaded for reference by netizens.
This drawing is the general construction drawing of the building structure of China Meteorological Science and Technology Building, including the foundation beam layout plan, foundation description, node details and other drawings, which are only for reference.
This document is the ventilation and air conditioning construction drawing (complete set) of a certain science and technology building, including: plan, system diagram, etc., for reference only.
In the construction scheme of curtain wall project of a science and technology building, * * Logistics Processing Zone Judicial Center eaves project is a high-tech building integrating office work.The total building area is 23301.48 square meters, and the building height is 35.4 meters.Architectural environment and layout, architectural modeling design and facade design of the central building
This drawing is a complete set of construction drawings for ventilation and air conditioning of a science and technology building in [Beijing]. The contents include: the air conditioning air plan of the basement, the installation schematic diagram and sectional drawing of the accessories on the inlet and outlet pipes of the refrigeration host. The contents are detailed and can be used for reference.
Based on the load analysis, load calculation and power supply and distribution system scheme of Hunan Science and Technology Building, this paper proposes the optimal design of low-voltage power distribution system.
Multiplex operation can realize single playback retrieval, network monitoring, video query and download while each channel realizes independent full real-time video recording.·Multiple recording modes: manual recording, timing recording, alarm linkage recording, dynamic detection recording.Dynamic detection and external alarm have pre recording function
This drawing is a complete set of CAD drawings for water supply and drainage design of the Science and Technology Building.The contents include: layout of embedded parts, glass division drawing, multi-layer embedded parts modification, etc., which are detailed and can be used for reference.
This project is the electrical construction drawing for decoration of some floors of the Science and Technology Building. The scope of this electrical design is: lighting and socket systems on the 21st, 5th and 4th floors.There are 10 drawings in total.