Municipal road pavement base construction document
The west of Hengsi Road is an urban trunk road with six lanes in two directions. The standard road width is 36 meters, and the design driving speed is 50 km/h. The construction road starts from Dongcheng Avenue, extends westward parallel to the ring expressway and intersects with Chuanhua Branch Road, with a total length of 412.148 meters. The roadbed (groove) of this section is reshaped with 13045 m3, 4% water stable subbase 12543 m2, 5% water stable subbase 12193 m2, and sidewalk 3% water stable cushion 4167 m2. The road grade of Chuanhua Branch Road is urban branch road, with two-way two lane roads, standard road width of 14 meters, and design driving speed of 30 km/h. The construction road starts from the west section of Hengsi Road, extends in a straight line to the northwest, and ends at about 260 meters outside the ring expressway. The total length of this section of road is 562.18m. The 4% water stable subbase, 5% water stable subbase and 3% water stable cushion of sidewalk in this section are 4588 ㎡, 4433.2 ㎡ and 4588 ㎡ respectively. The ring road grade is urban trunk road grade I. Design speed: 50km/h. The subgrade width is 36m. The starting point is K4+520 of the eastern section of the ring road, and the ending point is K5+780, with a total length of 1.26KM. In the pavement works of this section, the lower subbase of 4% water stable graded crushed stone (18cm thick) is 38340m2, the upper subbase of 4% water stable graded crushed stone (18cm thick) is 38340m2, and the 5.5% water stable graded crushed stone base (20cm thick) is 36865m2, including the quantities of sidewalk base. The south section of Zongsan Road is classified as urban trunk road. Design speed: 40km/h. The subgrade width is 32m. The starting point K0+000 intersects with the eastern section K0+500 of Hengsi Road, and the ending point K1+707.176, K0+520 ~ K0+650 underpasses the ring expressway and the E-ramp of Baihe Interchange, K0+860 transversely crosses through the first phase project of the eastern section of the ring road, with a total length of 1707.176m. In the pavement project of this section, 4% water stable graded crushed stone lower subbase (18cm thick) is 42351m2, 4% water stable graded crushed stone upper subbase (18cm thick) is 40995m2, and 5.5% water stable graded crushed stone base (20cm thick) is 39938 m2, including the quantities of sidewalk base. East of Hengsi Road: Grade I urban trunk road, design speed: 50km/h, standard width: 36m, total length: 2370m, 4% water stable graded crushed stone in this section: 70505m2, 5.5% water stable graded crushed stone: 68386m2.