Uploaded on: July 15, 2020 17:33:56 come from: Water supply and drainage / Water supply and drainage construction design / construction plan
zero
5 points

The structural strengthening project of Building 4 # of Beijing Yizhuang Backup Center is located at No. 137, Jinghai 3rd Road, Beijing Economic and Technological Development Zone. It has five floors above the ground and six floors locally. After reconstruction, it will be used as a data room, with an overall elevation of 24.6m and floor height of 4.75m for the first floor, 4.2m for the second to fourth floors, 4.25m for the fifth floor and 3.3m for the sixth floor locally. Demolition shall be carried out according to the need of reinforcement. The frame column of the original floor shall be reinforced with steel, and the adjacent ground around the frame column (reinforced concrete cushion plus pea gravel concrete surface course) shall be demolished; Demolition of secondary structure wall (mixed structure) obstructed by partially reinforced frame column edge; Remove the painting layer of frame column decoration; Removal of reinforced frame column angle steel through floor slab opening; Dismantle the pipeline of central air-conditioning system and equipment (fan coil unit) fire fighting system, fire hydrant box and wire bridge obstructed by reinforced frame column; The reinforced frame column goes out of the roof insulation layer, slope making and waterproof removal of the protective layer Dismantle the construction of sticking carbon fiber cloth under the roof. Dismantle the rainwater pipe, central air-conditioning system pipeline and equipment (fan coil unit), fire control system pipeline, fire hydrant box, wire bridge under the original floor; Demolition and polishing of suspender and hanger shall be flat with the floor; Polish and repair the concrete surface under the plain floor slab; Floor opening and plugging; Remove and clean the painting layer under the original local board surface Demolition is related to the position where the frame beam of the barrier floor is bonded with steel for reinforcement, and the secondary structural wall (mixed structure) below the partially reinforced frame beam is demolished. The scope of demolition meets the beam reinforcement construction; Reinforce the edge rainwater pipe central air conditioning system pipeline, fire system pipeline and wire bridge that are obstructed under the frame beam; Reinforce the frame beam. On the fifth floor slab, stick the steel to strengthen the roof insulation layer. Slope making protective layer waterproof removal. After the removal of the stairs related to the 4-6/C-D axis of the composite floor slab, the composite floor slab construction. Due to the particularity of the construction site, the removal is to ensure construction safety, reduce construction noise, reduce dust pollution, and maximize the environmental impact in the construction area, At the same time, ensure the normal living requirements in the construction area. After study, our company has decided to adopt mechanized demolition as the main method, and the demolition will be carried out manually. The specific organization and implementation of the project are as follows:

 Demolition and reconstruction construction scheme (word format) - Figure 1

Demolition and reconstruction construction scheme (word format) - Figure 1

 Demolition and reconstruction construction scheme (word format) - Figure 2

Demolition and reconstruction construction scheme (word format) - Figure 2

 Demolition and reconstruction construction scheme (word format) - Figure 3

Demolition and reconstruction construction scheme (word format) - Figure 3

 Demolition and reconstruction construction scheme (word format) - Figure 4

Demolition and reconstruction construction scheme (word format) - Figure 4

 Demolition and reconstruction construction scheme (word format) - Figure 5

Demolition and reconstruction construction scheme (word format) - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment