According to the characteristics of the project and the site conditions, the east, north and west sides of the podium and the standard floors above the main building (including the topsteel structure)Our company will erect scaffolding for construction;The standard floor of the main building is constructed by hanging basket, and four facades are constructed at the same time. The construction scheme of scaffold and hanging basket will be reported separately.
Organization design and construction scheme for exterior curtain wall of a complex building in Jiangsu - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
Overview of scaffolding works The * * complex building of the project has a building area of 32000 ㎡, 15 floors above the ground and 1 floor underground. The structural form is a frame shear structure, with a total height of 58.5 m. The scaffolding scheme of the project mainly solves the problems of main construction and maintenance scaffolding, external decoration construction scaffolding, and safety protection frames for entering floors.According to the actual situation of the project and in order to meet the use requirements of the construction, * * the first to fifth floors of the complex building adopt the floor stand, which is erected from the basement floor and the basement roof. The fifth to fifteenth floors adopt the cantilever stand for cantilever closure in two times. When the first cantilever is used, the lower floor stand is removed for the basement backfilling, and the second cantilever is carried out at the eleventh floor.When entering the decoration stage after the completion of the main structure construction, the floor stand shall be erected below the fifth floor as the decoration construction scaffold.
The project is located in XX in the north, adjacent to * * * Road in the east, * * * Road in the west and * * * Road in the south.The project is a commercial complex.There are three floors underground and 11 floors above the ground. The maximum floor height is 6.3m, and the total height of the building is 65.60m. The main functions of the commercial complex are commerce, catering, leisure and entertainment.
The project is located in Hefei New District of Government Affairs and Culture, adjacent to the Swan Lake. The base has a total planned land area of 163000 m2, a length of 780 m from east to west, and a width of 230 m from south to north. Huaining Road from north to south passes through the center. It is divided into two blocks, with a land area of 63600 m2 in the east and 99400 m2 in the west. The total ground floor area of Phase I project is 279811 m2,The west area site is adjacent to the second phase site and Qimen Road, the main urban road, to the north, Longtu Road to the south, Huaining Road and the main building to the east, Bijiashan Road to the east, with smooth traffic on all sides and convenient transportation of materials and equipment.The total construction area of the west area of the project is 121416.58 ㎡, the aboveground construction area is 93712.9 ㎡, and the underground construction area is 28117.31 ㎡.The basement is on the first floor, the complex building is on the 10th floor above the ground, the roof structure elevation is 43.4m, and the seismic fortification intensity is 7 degrees.The frame shear wall structure is adopted, and the seismic grade of the frame structure is Level II, and the seismic grade of the shear wall structure is Level I.
After the installation of cross beam, check the cross beam, mainly including the following items: whether the various cross beams are in place incorrectly, whether the interface between cross beam and vertical beam is consistent, whether the cross beam gasket is standard and orderly, whether the cross beam is horizontal, and whether the outer side of the cross beam is on the same plane as the outer side of the vertical beam.
This drawing is the curtain wall drawing of the exterior decoration part of a road complex building in Jinan. There are 9 drawings, including 1-15 elevation, 15-1 elevation, door and window details, curtain wall, canopy partition details, etc. The design is detailed and accurate, for reference, download and edit. The drawing format is dwg.
The outdoor decoration project of the comprehensive building of Jiexiu XX Bureau is located in XXX Road, Jiexiu City, with an outdoor facade decoration area of 3040 square meters.
The stainless steel pendant and angle steel beam are connected and fixed by bolts, with accurate positioning and convenient installation, which can effectively ensure the flatness of the granite curtain wall surface;
Project name: Exterior Facade Decoration Project of Trial Complex Building of XX Intermediate People's Court (Lot 1) Project location: South side of XX Avenue, North side of XX Avenue, West side of XX Plaza Conference Center, XX Province Construction unit: XX Intermediate People's Court, XX Province Construction period requirements: 92 calendar days Quality requirements: up to the contract standard of the general contractor (provincial excellent project)
The passenger transport comprehensive exterior decoration project scheme of Shandong Modi Bus Co., Ltd. The drawings include the building elevation structure diagram, the first to fourth floor plans, the roof plan, the steel column structure diagram, the section diagram, etc., for download reference.
This project is an outdoor decoration project with a large amount of work. It is surrounded by residential areas and opposite Jiexiu Central Hospital. The rainy season construction period has brought adverse factors to the night construction.Therefore, we need careful organization and scientific management to ensure the completion on schedule.
Be responsible for the coordination and management of each team in the construction section;According to the construction plan of the construction project section, the section head is responsible for issuing the team work schedule to each team to ensure that the progress of the project section is implemented by the team.Be responsible for the overall management of the quality progress and safety of this section, be directly responsible to the Project Department, cooperate closely with each professional team, and conduct technical exchanges with other section leaders.
This document is about the construction organization design of the exterior decoration project of a comprehensive building.The project is a comprehensive building invested and constructed by ×××××××××××× Co., Ltd.The building is composed of podium and tower. The tower has twenty floors and the podium has four floors. The total construction area is 27000 square meters. The scope of this bidding is ×××× exterior decoration works.
The building is composed of podium and tower. The tower has 20 floors and the podium has 4 floors, with a total construction area of 27000 square meters
The project is a frame shear wall structure. The structural work of the project is basically completed, and the strength of the concrete structure meets the design requirements.The design and decoration are changed. No embedded parts are reserved in the original structure, so the rear parts need to be set. The rear parts are connected to the main body through chemical anchor bolts.The reinforced concrete structure of roof and canopy needs to be removed.
Design and construction scheme of outdoor curtain wall of a complex building Design and construction scheme of outdoor curtain wall of a complex building Design and construction scheme of outdoor curtain wall of a complex building
Design and construction drawings of exterior wall curtain wall project of a complex building in Sichuan, including design description, plan, elevation, stone curtain wall keel layout, sectional view, node detail, connection diagram of beam and vertical beam, point supported glass canopy plan, point supported glass canopy steel frame plan, node detail and other drawings.
The design and decoration are changed. No embedded parts are reserved in the original structure, so the rear parts need to be set. The rear parts are connected to the main body through chemical anchor bolts.The reinforced concrete structure of roof and canopy needs to be removed.
Located in the Yangtze Huaihe River basin, ×× City has four distinct seasons and different climates: light rain in spring, plum rain in May and June, high temperature in summer in July and August, heavy rain in August and September, and the construction period in winter is generally 80 days.The annual maximum temperature in this area can reach 40 ℃, the minimum temperature can reach minus 10 ℃, the annual rainfall is about 1200mm, and the maximum daily rainfall is about 160mm. The construction period of this project is long, and the commencement period is in early summer, and the subsequent decoration and installation will face winter and rainy seasons.
Content introduction 1 Civilized construction measures 1 1.1 Civilized construction objectives 1 1.2 Site management principles 1 1.3 Civilized construction management organization and operation procedures 2 1.4 Civilized construction assurance measures 3 1.5 Measures to prevent disturbance and disturbance 6 1.6 On site medical station and first aid measures 7 1.7 Prevention and control of infectious diseases 8 2 Environmental protection measures 9 2.1 Environmental management objectives 9 2.2 Analysis of environmental management factors 92.3 Environmental management organization and responsibilities 9 2.4 Environmental protection measures 12 2.5 Control measures for indoor environmental pollution 18 2.6 Environmental monitoring and measurement 20 2.7 Emergency preparedness and response 21
This project is the business complex building project of * * County Treasury Payment Center. The owner has high requirements for the project duration, quality, safety, environmental protection, standardized site, civilized construction, etc.To this end, we will adopt advanced technology achievements at home and abroad, as well as a complete set of advanced and scientific construction management methods accumulated by our company over the years, and carry out quality management in strict accordance with the company's quality certification system documents.Adopt new technologies, new materials and new processes, and comprehensively implement project quality management.Starting from the five factors that affect the project production, namely human, machine, material, method and environment, the project construction should be completed with high quality and efficiency.Establish a strong project management department, and equip project managers and management personnel with high comprehensive quality that are suitable for the project characteristics.Take targeted measures to ensure the smooth construction and production of the project;Ensure the implementation of the objectives of construction period, quality, safety management, environmental protection, civilized construction and standardized site.
Content introduction 1. Project introduction The ****** complex building in Suzhou, Jiangsu Province is located at No. 1, East Street, Suzhou.One floor underground and seventeen floors above the ground.The garage on the first floor underground is not equipped with air conditioners, and the shopping malls on the first to third floors above the ground are equipped with central air conditioners.The fourth to seventeenth floors are residential buildings without air conditioning.The total building area is about 25000 square meters, and the total air conditioning area is about 8000 square meters.2. Due to the complex building structure of the project.The air conditioning project involves many construction units, which need the coordination and overall arrangement of all construction units to complete the installation task of the air conditioning project with higher quality and efficiency.Main contents of installation construction: installation of ceiling air conditioning unit, muffler, fan coil unit, air duct, air outlet, air valve, terminal water system and machine room.
This document is the construction scheme for the outdoor curtain wall of a comprehensive building, the outdoor decoration project of the comprehensive building of XX Bureau, located in XXX Road, with an outdoor facade decoration area of 3040 square meters.Main decoration projects include:1. Decoration of glass curtain wall2. Dry hanging aluminum plastic panel curtain wall3. Dry hanging stone4. Hollow glass plastic steel window5. Tempered glass doors and windows
This project is an outdoor decoration project with a large amount of work. It is surrounded by residential areas and opposite Jiexiu Central Hospital. The rainy season construction period has brought adverse factors to the night construction.Therefore, we need careful organization and scientific management to ensure the completion on schedule.
During the layout of embedded parts, they must be square and flat, and the deviation from top to bottom, left to right, front to back is less than 15mm, while the front to back tilt will reduce the contact between corner code and embedded parts, and increase the construction difficulty.
The * * * management complex building in Jiangsu Province is a government office building, covering an area of 6338 square meters, with 32 floors and a total height of 152 meters. The overall building is a straight tube, with podium buildings below six floors and tower buildings above 33 floors.External decoration works include: stone, aluminum plate, glass curtain wall, awning, gate, cornice, metal decorative parts, roof steel structure, railings, lightning protection and thermal insulation of facade, fire blocking related to curtain wall, waterproof and drainage structures at the junction with curtain wall
The bidding drawings, bidding documents, Q&A documents, national specifications and regulations provided by the bidding unit are prepared.Focusing on the engineering characteristics, technical difficulties, construction conditions and other relevant technical data of the project, from the overall investigation, research and analysis in the early stage of the project, the early preparation work (including the formulation of design plan, the establishment of design ideas, the procurement plan and purchase progress control of materials, the preparation of production schedule and shipment plan arrangement, the preparation of product transportation plan, etc.),The procurement of materials, processing and manufacturing of products, preparation before construction, construction technology, curtain wall cleaning and maintenance scheme and after-sales service have been systematically prepared.Especially, the construction preparation, product processing technology and construction scheme are described more systematically;
This project is a dry hanging stone and ground stone project for the exterior wall of ***** complex building, located at No. 1, Shidai Road, Jinan Economic Development Zone (Ping'an Town, Changqing District).This project is mainly a dry hanging stone curtain wall system
This project is a dry hanging stone and ground stone project for the exterior wall of ***** complex building, located at No. 1, Shidai Road, Jinan Economic Development Zone (Ping'an Town, Changqing District).This project is mainly a dry hanging stone curtain wall system.
The project is located in XX in the north, adjacent to * * * Road in the east, * * * Road in the west and * * * Road in the south.The project is a commercial complex.There are three floors underground and 11 floors above the ground. The maximum floor height is 6.3m, and the total height of the building is 65.60m. The main functions of the commercial complex are commerce, catering, leisure and entertainment.
Our company will give full play to its advantages in production and processing, and use the modern professional equipment of its own factory to design, process and produce meticulously.The main production equipment includes: complete sets of aluminum profile cutting, punching and milling, aluminum plate shearing machine, bending machine, slotting machine, bending machine, nail planting machine, argon arc welding machine, etc. imported from Germany; large processing equipment such as two-component glue injection machine, edging machine, polishing machine, etc. imported from the United States.
This data is the construction organization design scheme for the exterior decoration project of a comprehensive building.The content is detailed and can be used for reference.
External decoration construction organization design of the comprehensive building of Huinong District Emergency Rescue Command CenterExternal decoration construction organization design of the comprehensive building of Huinong District Emergency Rescue Command Center
The distance from the edge of the concrete shall be kept away from the position of the beam column reinforcement to reduce the damage to the constructed structure;2. The exterior decoration design of the project is luxurious and elegant, highlighting the collocation of lines. The construction personnel fully understand the relationship between lines, eliminate structural engineering errors, and make the overall harmonious and beautiful;3. A large number of steel structure works are matched with aluminum alloy keel, aluminum plate and glass curtain wall, materials are used cross, operators work cross, and coordination between various types of work needs to be ensured;
External control method shall be adopted for curtain wall works to conduct construction surveying and setting out.The control line of the large corner of the external wall is used as the external wall construction control grid, which is led out from the axis of the 5th and 12th floors of the engineering structure construction, and is checked with each other.
Actively participate in technical innovation and rationalization proposal activities, assist the technical director of the Project Management Department to complete the application of new materials and new processes, and be responsible for the collection, sorting and reporting of original data.
The project is located in XX in the north, adjacent to * * * Road in the east, * * * Road in the west and * * * Road in the south.The project is a commercial complex.There are three floors underground and 11 floors above the ground. The maximum floor height is 6.3m, and the total height of the building is 65.60m. The main functions of the commercial complex are commerce, catering, leisure and entertainment.