Construction design scheme of an outdoor lighting project
The construction process of outdoor lighting engineering is a very complex production technology activity. In order to better grasp the whole construction process, complete the construction tasks according to the contract duration with quality and quantity guaranteed, and successfully achieve the intended economic goals, a company must adopt scientific and reasonable methods for construction management. The preparation task of the construction organization design is: starting from the overall situation of the construction, according to the specific conditions, draw up the construction plan, determine the construction procedures, construction flow direction, construction methods, labor organization, technology selection, organizational measures, arrange the construction and the supply of labor, machines, materials, objects and various semi-finished products, and make use of transportation, roads, and sites Plan the layout and construction of on-site facilities such as hydropower energy assurance. The construction organization design of a company is meticulous and meticulous, and various needs and possible changes in the construction process are predicted, and emergency measures are taken.